Laurel Run Sites 1 2 - Construction Drawings.pdf

PDF 11 MB Posted

Attached to
"RECOVERY" Deckers Acid Mine Drainage Laurel Run 1 and 2
Solicitation number
AG-3D47-S-10-0005
Issued by

About this file

Drawings

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Angela.Greene WV Seal w/ Signature

Angela.Greene Typewritten Text 5-11-2010

1. Title Sheet
2. Sediment and Erosion Control Details, Construction Notes
2A. Stabilized Construction Access
3. Site Access Plan and Details
4. Plan View - Site 1
5. Plan View - Site 2
6. Construction Layout Data
7. Rock Sediment Dams
8. RSD C10 Pool Excavation, Disposal Areas 1 and 2
9. Open Limestone Channel C7, Rock Sediment Dam C7 Spillway Outlet
10. Open Limestone Channel C8, Rock Sediment Dam C8 Spillway Outlet
11. Open Limestone Channel Upper C10 and Lower C10, Rock Sediment Dam C10 Spillway Outlet
12. Culvert Details
13. Highwall Drain Profile and Details
14. Limestone Pond Details

File details come from the government source that posted it. Updated .