AG-3D47-S-10-0005 Amend 01.pdf
PDF 138 KB Posted
- Solicitation number
- AG-3D47-S-10-0005
About this file
AG-3D47-S-10-0005 Amendment 01
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-3D47-S-10-0005
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
NRCS-WV-123D47
MORGANTOWN WV 26505
ROOM 200
1550 EARL CORE ROAD
USDA-NRCS-WEST VIRGINIA STATE OFFIC
NRCS-WV-123D47
MORGANTOWN WV 26505
ROOM 200
1550 EARL CORE ROAD
USDA-NRCS-WEST VIRGINIA STATE OFFIC
06/03/2010000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/03/2010
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
THE PURPOSE OF THIS AMENDMENT IS TO:
1) Post the Questions and Answers from the Site Showing held on June 16, 2010, and those submitted via e-mail or by telephone.
2) Post the List of Attendees from the Site Showing held on June 16, 2010.
3) Post the revisions to the solicitation package.
4) Post the instructions for CCR and ORCA registrations.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
AMY STONEBRAKER
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
CONTINUATION SHEET
Amendment No. 1
Laurel Run Sites 1 & 2 Solicitation No. AG‐3D47‐S‐10‐0005
3. PART I, SECTION B, B.1 BID SCHEDULE
Attachment 3: Revised Bid Schedule
Discard page 3 of 47 of the Solicitation; Replace with Attachment 3, revised page 3 of 47.
4. PART III, SECTION J, J.1 LIST OF ATTACHMENTS, Construction and Material Specifications
Attachment 4: Revised Construction Specifications
The following is a list of the construction specifications revised by this amendment:
Specification Remove Insert
No. Name Page(s) Date Page(s) Date
5 Pollution Control 5‐4 April 2010 5‐4 June 2010
23 Earthfill 23‐10 April 2010 23‐10 June 2010
24 Drainfill
24‐5 through
24‐8
April 2010
24‐5 through
24‐7
June 2010
44 Corrugated Polyethylene Tubing 44‐4 February 2010 44‐4 June 2010
61 Rock Riprap 61‐5 April 2010 61‐5 June 2010
5. PART III, SECTION J, J.1 LIST OF ATTACHMENTS, Construction Drawings
Attachment 5: Revised Construction Drawings
The following is a list of the construction drawings revised by this amendment:
Drawing Name Remove Insert
Sheet(s) Date Sheet(s) Date
TITLE 1 5/11/2010 1 6/21/2010
SEDIMENT AND EROSION CONTROL
DETAILS, CONSTRUCTION NOTES
2 3/2010 2 6/21/2010
SEDIMENT AND EROSION CONTROL
DETAILS
2B 6/21/2010
SITE ACCESS PLAN AND DETAILS 3 3/2010 3 6/21/2010
PLAN VIEW ‐ SITE 1 4 3/2010 4 6/21/2010
PLAN VIEW ‐ SITE 2 5 3/2010 5 6/21/2010
RSD C10 POOL EXCAVATION, DISPOSAL
AREAS 1 & 2
8 3/2010 8 6/21/2010
HIGHWALL DRAIN PROFILE AND DETAILS 13 3/2010 13 6/21/2010
LIMESTONE POND DETAILS 14 3/2010 14 6/21/2010