Task Order B - Road 6200 - Chiwawa River

View the file

Other files

File Type Posted
A_PROJECT_TO_Tillicum_Mad_River..doc DOC document
B_Drain_Dip.pdf PDF
C_Project_Map.pdf PDF
D_Work_Access_Map.JPG JPG image
A_Drainage_Construction_Details.pdf PDF
D_Drain_Dip.pdf PDF
B_ROAD_STRUCTURE_DETAILS Model —
A_Drain_Dip.pdf PDF
D_Location_and_Area_Map.JPG JPG image
A_Road_Structure_Details.pdf PDF
C_PROJECT_TO_Safety_Harbor.doc DOC document
C_Vicinity_Map.pdf PDF
D_PROJECT_TO_Echo_Trail_Construction.doc DOC document
B_Questionaire.doc DOC document
DBWage_Determination.rtf RTF text file
B_Chiwawa.Work.list.doc DOC document
RFP_AG-05GG-S-08-0021.doc DOC document
DBWage_Determination.rtf RTF text file
C_915_1_Existing_Trail_Restoration.pdf PDF
A_Rd5800_Rd5700_Reconditioning Existing Roadway.doc DOC document
B_Vicinity_Map.pdf PDF
B_Drainage_Construction_Details.pdf PDF
D_954_1_Trail_Obliteration.pdf PDF
D_Work_Site_Map.JPG JPG image
D_Drainage_Construction_Details.pdf PDF
DBWage_Determination.rtf RTF text file
B_Specification_Listing.doc DOC document
RFP_Sample Task Order Form..doc DOC document
RFP_SF24_Bid Bond.pdf PDF
B_851-2_Hazard_Removal_Illustration.pdf PDF
A_851-1_Hazard_Removal_Illustration.pdf PDF
B_801-1_Illustration_of_Road_Structure_Terms.pdf PDF
D_912_1_Typical_Trail_Cross_Sections.pdf PDF
A_801-1_Illustration_of_Road_Structure_Terms.pdf PDF
A_vicinity.map.pdf PDF
A_Specification List.doc DOC document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project B: Rd 6200 Chiwawa River

Individual Project Task Order, Page 8 of 8

INDIVIDUAL PROJECT TASK ORDER

Contract Number
Individual Project Task Order Number

This Individual Project Task Order is issued under contract number:

AG-05GG-C-08-_____

AG-05GG-D-08-_____

ISSUING OFFICE: (Forest Service Unit Name)
Task Order Date

Okanogan - Wenatchee National Forest

Acquisition Section, 215 Melody Lane Wenatchee, WA. 98801

Financial obligations and payments shall be processed via the Issuing Office.

PROJECT:

PROJECT NAME: PROJECT 2 - ROAD 6200 Chiwawa River Wenatchee River Ranger District, OKA-WEN National Forest Itemized payment items, quantities, prices and detailed project requirements are attached

Proposal Request Date:
Proposal Response Date/Time (close of business unless otherwise shown):

A BID GUARANTEE is required for all offers exceeding $100,000.00.

OFFER:

Offeror Name (same as on contract)
Offered by (Name, Title, Phone):
Offered Amounts attached in Section B.
Authorized Signature:

Date:

This is a firm offer for 30 calendar days from the Response Date/Time. The offer agrees to furnish any required bonds and to perform the work at the prices offered.

AWARD:

ITEMS ACCEPTED:

TOTAL

AMOUNT: $

Task Order Number and Award Date shown at top.

Ordered by (Name, Title, Phone):
Authorized Signature

Task Order Contracting Officer

SECTION B – BID SCHEDULE

(Detailed List of Payment Items, Quantities, Units, Unit Prices and Amounts)

B-1 BID SCHEDULE

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101

Mobilization

Lump Sum All

20401

Roadway excavation, reshape, clean ditch, culverts and catch basins

MILE

20401 Roadway excavation, Remove slide material

Cubic Yard*

32203

6” rip rap for pipe outlets

Cubic Yard

32203

Aggregate base, grading 1 ¼” , compaction method C

Cubic Yard*

60218

18-inch corrugated polyethylene pipe, type B, method c or Metal

Foot

60219

Drain dip with 10 c.y. crushed aggregate

Each

TOTAL AMOUNT

B-2 NOTE:

Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.

Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.

* Denotes Contract Quantity

SECTION C – STATEMENT OF WORK

C-1

PROJECT SCOPE

Work includes:

Reconditioning and Maintenance of Existing Roadway, Wenatchee River Ranger District Chiwawa Road 6200

11.5 miles

BOP 9.9 (end of pavement) to EOP 21.4 (end of road)

Shape and compact travel way and turnouts

Clean ditch, culverts and catch basins, Remove slide material, log out if needed

Install 18” cmp at m.p. 19.5, rip rap outlet

Install 18” cmp at m.p. 20.0, rip rap outlet

Install 4 drain dips with 10 cy crush aggregate each. (40 cy)

Between m.p. 19 and m.p. 21.4

Spot rock m.p. 19 to m.p. 21.4

1 ¼ “minus crushed aggregate, 200 cy C-2

PROJECT LOCATION

From Wenatchee,WA. take Highway #2 west to m.p. 85 and turn right on highway #207. Travel to outlet end of Lk. Wenatchee and turn right 0n County Road #22(Chiwawa Loop Rd.). Turn on County Road 502 which is FS 6200. Project sites are up the road approximately 17 miles.

C-6

SPECIFICATIONS APPLICABLE TO THIS INDIVIDUAL PROJECT

[X] FHWA Standard Specification 2003 U.S. Customary applies

[_] FHWA Standard Specification 2003 Metric applies

The attached “List of Specifications” and “Supplemental Project Specifications” apply.

SECTION F – PERFORMANCE TIME

F-5

FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK / ALTERNATE I

The following performance time requirements shall apply to this project:

30 Completion Calendar Days with desired start work date of June 16, 2008

SECTION G – CONTRACT ADMINISTRATION DATA

G-9

GOVERNMENT-FURNISHED PROPERTY (AGAR 452.245-70) (FEB 1988)

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.

NONE

G-10

POST AWARD CONFERENCE (AGAR 452.215-73) (FEB 1988)

A post award conference with the successful offeror is required. It will be scheduled and held within 15 days after the date of contract award. The conference will be held at the Headquarters of the Okanogan and Wenatchee National Forests, 215 Melody Lane, Wenatchee, WA.

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H-1

FAR 52.236-4 PHYSICAL DATA

Change section (c) to read as follows:

(c) Transportation facilities. Site is accessed via paved Chelan county roads and Forest Service roads, both paved and aggregate. Contractors are cautioned that the roadway structure on 5700 is paved and should be protected if using track type equipment.

Contractors are cautioned that the roadway structure is designed so that the completed road will support highway legal loads during a limited use season. Construction equipment often subjects the uncompleted roadway structure to loadings it is not designed to support. This is especially critical during periods of excessive moisture and will require careful selection and scheduling to permit efficient operation. Any damage resulting from operations which renders the material unsuitable for use or results in potential siltation of streams will be corrected by the Contractor at its expense.

H-11

LANDSCAPE PRESERVATION AND HAZARDOUS MATERIALS

Add the following:

(a) The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawn or natural features not designated for treatment. The Contractor shall confine operations to within the clearing limits or other areas designated in the contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.

(b) Prevention of Oil Spills. If the Contractor maintains storage facilities for oil or oil products on site, appropriate preventive measures shall be taken to insure that any spill of such oil or oil products does not enter any stream or other waters of the United States or any of the individual states. If a spill of petroleum product should occur in water, the Contractor shall take immediate action to clean up or contain the spill, then immediately notify the Engineer and the Oregon Emergency Response System (OERS), telephone 1-800-452-0311 or 1-503-378-4124, and then immediately notify the Contracting Officer.

Contractor shall have a SPILL RESPONSE KIT on the project whenever equipment is operating. The spill kit shall be sufficient to absorb 34 gallons of oil, designed to float on the surface, while absorbing oil and repelling water. The KIT shall meet or exceed the physical properties of “New Pig Products Spill Kit #408”.

Oil absorbing mats are required under all stationary equipment, or equipment being serviced within the Forest Boundary to prevent leaking or spilled petroleum base products from contaminating soil and water resources. Such material will be furnished by Contactor and approved by Contracting Officer.

Servicing of all equipment shall be done only in the areas approved by the Contracting Officer. If the total oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare a Spill Prevention Control and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer.

Equipment shall be furnished on a fully operational basis, of modern design and in good operating condition with no fuel or oil leaks. Repairs and move-in/move-out are the Contractor’s responsibility. All equipment shall be power washed and shall be clean prior to entering Forest Service Land.

(c) No objectionable material shall be allowed to enter any stream, river, lake, or other body of water. Material which falls in these areas shall be retrieved and disposed of, or incorporated in the work as directed by the Contracting Officer, and damage to vegetation or structures outside the project limits shall be repaired as directed by the Contracting Officer.

(d) The Contractor shall not operate equipment or otherwise disturb the natural vegetation and soil beyond the areas flagged on the ground or beyond two feet from edge of walkways, top of cuts, or toe of fills.

(e) The Contractor will make every reasonable attempt to preserve the scenic and natural environment along this construction project.

(f) Prior to the start of construction the Contractor shall submit to the Engineer for approval a schedule and plan for temporary pollution control measures for the following phases of work:

H-12

LOCAL DISPOSAL SITES

Add the following:

Designated disposal sites for this project are shown on the Plans or designated adjacent to the project area.

H-20

PROSECUTION OF WORK – WORK HOUR LIMITS – WORK ITEM LIMITS

Add the following:

a) All construction activity shall be limited to two (2) hours after sunrise and two (2) hours before sunset, Monday through Friday, unless other hours are approved in writing by the Contracting Officer. The Contractor shall conduct activities so that interference with the public shall be kept at a minimum.

b) The Contractor shall use measures and precautions necessary to warn and protect the public and Government personnel during work at the project site. Such actions include, but are not limited to, furnishing and maintaining barricades and signs around the work site and roping off the area.

H-31

SANITATION REQUIREMENTS

Unless substitute measures or equipment are authorized in writing by the Contracting Officer, protection of air and water quality will include the use of approved chemical toilets by all persons engaged in road construction or in removing timber under this contract while they are within the boundaries of the Forest. Such facilities shall be furnished by Contractor in quantities and at locations approved by the Engineer. No habitation or overnight dwelling by employees of Contractor will be permitted on National Forest land without advance written approval from the Contracting Officer.

SECTION J - ATTACHMENTS

Item Number of Pages

1. Individual Project Technical Capability Questionnaire 1 page

(Attached separately)

2. List of Specifications and Supplemental Project Specifications 27 pages

3. List of Applicable Drawings:

7 drawings

1. Vicinity Map

2. 801-1 Illustration of Road Structure Terms

3. 851-2 Hazard Removal

4. Drainage Dip

5. Chiwawa Work List

6. Drainage Construction Details

7. Road Structure Details

4. General Decision Number: WA20080001, 5/9/2008 44 pages

(Attached separately)

5. Fire Protection Requirements Forms from basic contract:

· R6-FS-6300-52 applies

· Measure 1 applies

· Measure 2 applies

Bid Bond Form SF-24 applies if offer exceeds $100,000.00 and a Surety Bond is used for the Bid Guarantee.

File details come from the government source that posted it. Updated .