A_Rd5800_Rd5700_Reconditioning Existing Roadway.doc
DOC document 26 KB Posted
- Solicitation number
- AG-05GG-S-08-0021
About this file
Task Order A - Attachment - Reconditioning Existing Roadway
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Reconditioning Existing Roadway Due to June 2006 Weather Event
Entiat Ranger District Compiled by Phil & John on 5/24/2007 Tillicum Road 5800
2.3 miles BOP 0.0 jct. with 5700 to 2.3 Indian creek EOP Clean ditch, culverts and catch basins, estimate 400cy Remove slide material, estimate 300cy Install 36” cmp m.p. 1.23, rip rap outlet
Shape and compact travel way and turnouts Spot rock 1 ¼ “ minus crushed aggregate, 200 cy Haul excavated material to stockpile site @ m.p 0.1 Tyee Road 5700
2.5 miles
BOP mp 0.0 with jct. 5800 to mp 2.5 EOP SL Paved roadway, clean ditch, clean culverts and catch basins estimate 600cy Remove slide material estimate 500 cy Haul all material to stockpile site on 5800 @ mp 0.1
File details come from the government source that posted it. Updated .