A_Rd5800_Rd5700_Reconditioning Existing Roadway.doc

DOC document 26 KB Posted

Attached to
ROAD, TRAIL, AND FISHERIES CONSTRUCTION, RECONSTRUCTION, AND MAINTENANCE PROJECTS
Solicitation number
AG-05GG-S-08-0021
Issued by

About this file

Task Order A - Attachment - Reconditioning Existing Roadway

View the file

Other files

File Type Posted
A_PROJECT_TO_Tillicum_Mad_River..doc DOC document
B_Drain_Dip.pdf PDF
C_Project_Map.pdf PDF
D_Work_Access_Map.JPG JPG image
A_Drainage_Construction_Details.pdf PDF
D_Drain_Dip.pdf PDF
B_ROAD_STRUCTURE_DETAILS Model —
A_Drain_Dip.pdf PDF
D_Location_and_Area_Map.JPG JPG image
A_Road_Structure_Details.pdf PDF
C_PROJECT_TO_Safety_Harbor.doc DOC document
C_Vicinity_Map.pdf PDF
D_PROJECT_TO_Echo_Trail_Construction.doc DOC document
B_Questionaire.doc DOC document
DBWage_Determination.rtf RTF text file
B_Project_TO_Chiwawa_River.doc DOC document
B_Chiwawa.Work.list.doc DOC document
RFP_AG-05GG-S-08-0021.doc DOC document
DBWage_Determination.rtf RTF text file
C_915_1_Existing_Trail_Restoration.pdf PDF
B_Vicinity_Map.pdf PDF
B_Drainage_Construction_Details.pdf PDF
D_954_1_Trail_Obliteration.pdf PDF
D_Work_Site_Map.JPG JPG image
D_Drainage_Construction_Details.pdf PDF
DBWage_Determination.rtf RTF text file
B_Specification_Listing.doc DOC document
RFP_Sample Task Order Form..doc DOC document
RFP_SF24_Bid Bond.pdf PDF
B_851-2_Hazard_Removal_Illustration.pdf PDF
A_851-1_Hazard_Removal_Illustration.pdf PDF
B_801-1_Illustration_of_Road_Structure_Terms.pdf PDF
D_912_1_Typical_Trail_Cross_Sections.pdf PDF
A_801-1_Illustration_of_Road_Structure_Terms.pdf PDF
A_vicinity.map.pdf PDF
A_Specification List.doc DOC document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Reconditioning Existing Roadway Due to June 2006 Weather Event

Entiat Ranger District Compiled by Phil & John on 5/24/2007 Tillicum Road 5800

2.3 miles BOP 0.0 jct. with 5700 to 2.3 Indian creek EOP Clean ditch, culverts and catch basins, estimate 400cy Remove slide material, estimate 300cy Install 36” cmp m.p. 1.23, rip rap outlet

Shape and compact travel way and turnouts Spot rock 1 ¼ “ minus crushed aggregate, 200 cy Haul excavated material to stockpile site @ m.p 0.1 Tyee Road 5700

2.5 miles

BOP mp 0.0 with jct. 5800 to mp 2.5 EOP SL Paved roadway, clean ditch, clean culverts and catch basins estimate 600cy Remove slide material estimate 500 cy Haul all material to stockpile site on 5800 @ mp 0.1

File details come from the government source that posted it. Updated .