Amendment 01 AG-04R3-S-10-0013 Attachment 2.doc

DOC document 75 KB Posted

Attached to
Stand Exam Data Gathering
Solicitation number
AG-04R3-S-10-0013
Issued by

About this file

Attachment No. 2

View the file

Other files

File Type Posted
REVISED_p.HP_Sample_Design_Items 1Dthru2C_Attachment 1.pdf PDF
Amendment 1 AG-04R3-S-10-0013.rtf RTF text file
b.AG-04R3-S-10-0013.rtf RTF text file
u._HP_Items1Dthru2C_UnitDataSheet1.pdf PDF
v._HP_Items1Dthru2C_UnitDataSheet2.pdf PDF
x._NFJD_Item2D_Bruin_UnitDataSheet.pdf PDF
z._WW_Item1B_UnitDataSheet_StockingSurveys.pdf PDF
y._PM_Item1C_UnitDataSheet_StockingSurveys.pdf PDF
m._QuickPlot_Scenario_Map1.pdf PDF
t._WW_Sample_Design_Item1B_Stocking_Surveys.pdf PDF
h._NF_Item_2D_Bruin_VicinityMap2.pdf PDF
j._PM_Item_1C_VicinityMap2.pdf PDF
c._UmatillaNFGeneralVicinityMap.pdf PDF
r._NFJD_Sample_Design_Item2D_BruinExams.pdf PDF
a.Offeror_Packet.rtf RTF text file
d._HP_Items_1DE_and_2ABC_VicinityMap.pdf PDF
g._NF_Item_2D_Bruin_VicinityMap1.pdf PDF
p._HP_Sample_Design_Items1Dthru2C.pdf PDF
n._IntensiveExam_Scenario_Map2.pdf PDF
f._NF_Item_1A_VicinityMap2.pdf PDF
i._PM_Item_1C_VicinityMap1.pdf PDF
o._ExtensiveExam_Scenario_Map3.pdf PDF
e._NF_Item_1A_VicinityMap1.pdf PDF
s._PM_Sample_Design_Item1C_Stocking_Surveys.pdf PDF
q._NFJD_Sample_Design_Item1A_Stocking_Survey.pdf PDF
w._NFJD_Item1A_UnitDataSheet_StockingSurveys.pdf PDF
l._WW_Item_1B_VicinityMap.pdf PDF
zb._Fire Protection Supp.r6-fs-6300-52.rtf RTF text file
k_PM_Item_1C_VicinityMap3.pdf PDF
za._WageDetermination77-0209_sca.txt TXT text file
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 01

AG-04R3-S-10-0013

Attachment 2

Amended Solicitation bid Form

19. ITEM NO.
20. SUPPLIES/SERVICES
21. QTY
22. UNIT
23. UNIT

PRICE

24.AMOUNT

Umatilla National Forest Stand Exams, Reforestation/Timber Stand Improvement Stocking Surveys, and Fuel (Planar Intercept) Surveys

PRICING MUST BE SUBMITTED ON ALL ITEMS TO BE CONSIDERED RESPONSIVE TO THE SOLICITATION. Please provide the total number of plots for 1A through 2D your company could complete if awarded (Fill in: ______________). Additionally, please estimate yearly plot capacity maximums, assume “Extensive” protocols are required (Fill in: ___________).

QUICK PLOTS

1.A
1.a North Fork John Day R.D. (Stocking Surveys)
2,169
Plot
$
$
1.B
1.b Walla Walla Ranger District (Stocking Surveys)
1,315
Plot
$
$
1.C
1.c Pomeroy Ranger District (Stocking Surveys)
2,991
Plot
$
$

With Fuel Photo series added:

1.D
Heppner Ranger District (Post Harvest)
122
Plot
$
$
1.E
Option No. 1 Heppner Ranger District (Post Harvest)
132
Plot
$
$

EXTENSIVE PLOTS

With Fuel Photo series added:

2.A
Heppner Ranger District (Kahler)
138
Plot
$
$
2.B
Option No. 1 Heppner Ranger District
171
Plot
$
$
2.C
Option No. 2 Heppner Ranger District
167
Plot
$
$

With Planar Intercept (Brown’s Protocol) Fuel Inventory added:

2.D
North Fork John Ranger District (Bruin Stand Exams & Brown’s Protocol)
312
Plot
$
$

See section F for delivery schedule for above Items

Scenario Items:

Refer to Section L under Technical Approach for Item Scenarios to price Items listed below. Odering may include combinations of stand exam and or fuels data to be collected at the same time or as stand alone items.

1
Quick Plot Exams. Tree data collected in a manner that is quick and efficient with limited data collected as compared to more labor extensive/intensive surveys. Data collected under this exam type would typically be limited to a few data items (i.e. tree status, species, tree count, DBH, etc.). Typically these exams are done following vegetation treatments, validate stocking, etc. Relaxed measurement tolerance standards. Estimated production rate 40 plots per person/day. Plots generally installed in this exam type would typically be done using a fixed radius factor (i.e. 1/100th acre, 1/20th acre, 1/5th acre, etc.). The following are the number of Quick Plots by ordering office: QUICK PLOTS ADDITIONAL ITEMS: This additional information may include but is not limited to Ground Surface Cover, Vegetation Composition, and Down Woody Material.
24
Plot
$
$
2
Extensive Exams. Tree data collected in this scenario is more labor intensive than a Quick Plot Exam scenario with additional data items collected (may include growth sample measurements) with increased measurement standards. Exams done using this method are typically done to execute growth and yield models, silvicultural prescriptions. Production rate 15 plots per person/day. Plots generally installed in this type of exam would use a combination of both fixed radius and basal area factor. The following are the number of Extensive Exams by ordering office: Extensive Exams ADDITIONAL ITEMS: This additional information may include but is not limited to Ground Surface Cover, Vegetation Composition, and Down Woody Material.
27
Plot
$
$
3
Intensive Exams. Tree and Fuels data collected under this scenario would be more intensive. Data collected would include both tree and fuel data using a combination of fixed and variable plots for tree data and transect for fuels data. Data collected would include growth measurements, increased measurement tolerances standards. Exams of this type would be used to determine, stand volumes, insect and disease, growth and yield, and silvicultural prescriptions. Production rate 10 plots per person/day. Non-electronic collection (paper forms). Plots generally installed in this type of exam would use a combination of both fixed radius and basal area factor. The following are the number of Intensive Exams by ordering office: Intensive Exams ADDITIONAL ITEMS: This additional information may include but is not limited to Ground Surface Cover, Vegetation Composition, and Down Woody Material.
24
Plot
$
$
4
Down Woody Material Surveys. This exam is limited fuel surveys only to determine fuel loading to aid in fuels planning work, developing prescriptions, or other resource work. Plots installed are typically done on a transect basis. Production rate of 20 plots per day for intensive surveys and 40 for less intensive surveys. Surveys may include Planar Intercept – Brown’s Protocol or Fuel Photo Series.

Sub Item

4.1
Planar Intercept – Brown’s Protocol
17
Plot
$
$
4.2
Fuel Photo Series
8
Plot
$
$

Note: For those Exams and Planar Intercept Exams described in the secario, please provide a price estimate. This will be used to establish a pool of contractors to compete future Task Orders. Refer to section L for insrtuctions.

MINIMUM AND MAXIMUM CONTRACT AMOUNTS (FEB 1988)

During the period specified in FAR clause 52.216-18 ORDERING, the Government shall place orders totaling a minimum of $2,500.00 but not in excess of $999,999.00

M-4. EVALUATION CRITERIA

General. Proposals will be evaluated on the basis that the following technical factors are in descending order of importance. When combined, all non price evaluation factors are approximately equal to cost or price.

1. Technical Proposal. A firm’s Technical Proposal will be evaluated based upon their technical approach to the Performance Work Statement, relevant past performance and the related qualifications of the personnel proposed. The sub-factors are all of equal value.

A.

Relevant Past Performance. Past performance is a measure of the degree to which an offeror, as an organization, has: (1) satisfied its customers, and (2) complied with federal, state, and local laws and regulations. The Government will inquire about the following elements, which are all of equal importance in relation to each other, (1) quality of the offeror’s work; (2) customer satisfaction; (3) timeliness of the Firm during performance and the final completion of the project; and (4) overall business relations. Each offeror will be evaluated on their performance under existing and prior contracts of a similar nature.

(1) Quality of Services: Demonstrates ability to perform services similar to those required in this solicitation. Contractor demonstrates conformance to good standards of workmanship.

(2) Customer Satisfaction: Satisfaction of end users with the Contractor's completed products and services.

(3) Timeliness of performance: Compliance with delivery schedules; reliability; responsiveness to technical direction, no assessment of liquidated damages.

(4) Business relations: Effective management; ability to manage projects involving subcontracts; working relationship with the Contracting Officer and technical representatives; reasonable/cooperative behavior; flexibility; effective contractor recommended solutions; businesslike concern for Government's interests.

The Government may research offeror performance on any federal, state, local, and commercial contract performance of the offeror that is known to the Government, but not included on the submitted Performance Information. Additionally, personal experience and evaluator knowledge of offeror performance may be utilized. The Government is not obligated to request additional information and in the absence of requested information, offerors may be rated deficient.

The Government will consider the relevance of past performance information obtained in relation to the scope of this procurement with respect to both a similar efforts, and the length and scope, number, complexity, and diversity of contracts completed by the firm.

Offerors with past performance data will be evaluated in the same manner as all other evaluation factors; however, those offerors with no past performance data will treated as an unknown performance risk and neither be evaluated favorably nor unfavorably. Therefore, offerors will receive credit for good past performance, lose credit for poor past performance, and will neither receive nor lose credit for no relevant past performance. Contractors that fail to submit past performance information will not be considered any further.

B. Key Personnel. The evaluators will conduct an appraisal of the offeror’s key personnel’s knowledge, experience, and qualifications to successfully and independently perform common stand exams, use of field PDRs, and can properly identify plant association indicator plants and their use in the determination of plant associations or habitat types. Offerors that do not provide information on their key personnel will not be considered any further.

C. Technical Approach. The firm’s methods and schedule for completing the scenario work items listed Section L. The evaluation of this scenario will be based upon the firm’s ability to accomplish the listed activities indentifying procedures, equipment and scheduling needs anticipated for this project.

*A Contractor would be highly rated under Relevant Past Performance if, in the last three years, the Contractor has completed in a timely manner, with a pay range of 90% or higher, with high customer satisfaction/business relations in specific common stand exam contracts that are similar in nature and complexity with the requirements of this solicitation.

*A Contractor would be highly rated under Key Personnel if the key personnel listed have been involved with at least three common stand exam contracts, have used field PDRs for this type of work at least three times, and have knowledge and experience in the identification of plant associations indicator plants and their use in the determination of plant associations or habitat types.

*A Contractor would be highly rated under Technical Approach if they are able to demonstrate the ability to complete the set tasks with a high degree of skill and a short time period through the deployment of proven data gathering technologies and efficient highly productive work standards.

2. Price Evaluation Criterion. The degree of importance of the price will increase with the degree of equality of the proposals in relation to the other factors on which selection is to be based, or when the price is so significantly high as to diminish the value of the technical superiority to the Government. Award(s) will not be made if the Contracting Officer determines that the price is not reasonable.

File details come from the government source that posted it. Updated .