h.APPENDIX_C_Road_Mtce_Tables.docx
DOCX document 102 KB Posted
- Attached to
- Cove II Stewardship Project Federal contract opportunity
- Solicitation number
- AG-04M3-S-13-0008
About this file
H. Appendix C Road Maintenance Tables
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AmendmentNo1.rtf | RTF text file | |
| Cove_II_Stew_Cruise_Vol_Info_Request.pdf | ||
| i.APPENDIX_C_Road_Mtce_Drawings.pdf | ||
| a.offerors_packet.docx | DOCX document | |
| m.Construction_Wage_Determination.mht | MHT file | |
| d.CoveII_Stew_Map_SOUTH.pdf | ||
| k.APPENDIX_D_Road_Recon_Drawing.pdf | ||
| j.APPENDIX_D_Road_Recon_Specs.docx | DOCX document | |
| e.APPENDIX_A.docx | DOCX document | |
| c.CoveII_Stew_Map_NORTH.pdf | ||
| g.APPENDIX_C_Road_Mtce_Specs.docx | DOCX document | |
| b.final_solicitation.docx | DOCX document | |
| f.APPENDIX_B_SCALED_TIMBER_SPECS.doc | DOC document | |
| l.Service_Wage_Determination77-0079_sca.mht | MHT file |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WO-KT-FT.3.1#
ROAD MAINTENANCE REQUIREMENTS. (9/04) Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:
Contract Road Maintenance Requirements Summary
| Road |
| Termini |
| Miles |
| Applicable PREHAUL Road Maintenance Specifications |
| From |
| To |
| T-811F |
| T-813F |
| T-831F |
| T-832F |
| T-834F |
| T-836F |
| T-838F |
| T-839F |
| T-854F |
| T-891F |
Mill Creek Lane
| 6220 |
| Mill Creek Lane |
| MP 4.7 |
| 4.7 |
| P |
P
P
P
| 6220200 |
| 6220 |
| MP 0.6 |
| 0.6 |
P
P
| 6220200 |
| MP 0.6 |
| MP 2.5 |
| 1.9 |
P
P
P
| 6220205 |
| 6220 |
| MP 0.5 |
| 0.5 |
P
| P |
| P |
| 6220241 |
| 6220 |
| MP 0.3 |
| 0.3 |
P
P
P
| 6220250 |
| 6220 |
| MP 0.25 |
| 0.25 |
P
P
| 6220262 |
| 6220 |
| MP 0.5 |
| 0.5 |
| P |
| P |
| 6220264 |
| 6220 |
| MP 0.5 |
| 0.5 |
| P |
| P |
| 6220280 |
| 6220 |
| MP 0.8 |
| 0.8 |
P
P
| 6220300 |
| 6220 |
| MP 3.8 |
| 3.8 |
P
P
| 6220356 |
| 6220300 |
| MP 0.2 |
| 0.2 |
P
P
| 6220360 |
| 6220 |
| MP 1.0 |
| 1.0 |
P
P
| 6220362 |
| 6220360 |
| MP 0.3 |
| 0.3 |
| P* |
| P |
| 6200 |
| MP 0.0 |
| MP 12.0 |
| 12.0 |
| P |
P
P
| P |
| P |
| 6205 |
| 62 |
| MP 3.8 |
| 3.8 |
P
P
| 6205050 |
| 6205 |
| MP 4.8 |
| 4.8 |
P
P
| 6205100 |
| 6205050 |
| MP 1.4 |
| 1.4 |
| P |
| P |
| 6205106 |
| 6205100 |
| MP 0.7 |
| 0.7 |
| P |
| P |
| 6205108 |
| 6205106 |
| MP 0.3 |
| 0.3 |
| P |
| P |
| 6205057 |
| 6205050 |
| MP 0.3 |
| 0.3 |
P
P
| 6205070 |
| 6205057 |
| MP 2.0 |
| 2.0 |
P
P
| 6205077 |
| 6205057 |
| MP 0.5 |
| 0.5 |
P
P
| 6205080 |
| 6205057 |
| MP 0.4 |
| 0.4 |
P
P
| 6205090 |
| 6205050 |
| MP 0.4 |
| 0.4 |
| P |
| P |
| 6205092 |
| 6205090 |
| MP 0.3 |
| 0.3 |
| P |
| P |
| 6210 |
| 62 |
| MP 5.5 |
| 5.5 |
P
P
| 6210100 |
| 6210 |
| MP 0.3 |
| 0.3 |
| P |
| P |
| 6210105 |
| 6210 |
| MP 0.2 |
| 0.2 |
| P |
| P |
| 6210165 |
| 6210 |
| MP 0.7 |
| 0.7 |
P
P
| 6220985 |
| 6220 |
| MP 0.1 |
| 0.1 |
P
P
P = Contractor Performance Item, D = Deposit to Forest Service, D3 = Deposit to Third Party
Special Requirements
* Make culvert functional for purposes of haul. Remove culvert and shape bank when hauling is complete.
| Road |
| Termini |
| Miles |
| Applicable DURING HAUL Road Maintenance Specifications |
| From |
| To |
| T-811F |
| T-812F |
| T-813F |
| T-831F |
| T-834F |
| T-836F |
| T-838F |
| T-839F |
| T-854F |
| T-89F1 |
Mill Creek Lane
| 6220 |
| Mill Creek Lane |
| MP 4.7 |
| 4.7 |
| P |
| P |
| D |
| P |
| P |
| P |
| P |
| 6220200 |
| 6220 |
| MP 0.6 |
| 0.6 |
| P |
| D |
P
P
| 6220200 |
| MP 0.6 |
| MP 2.5 |
| 1.9 |
P
P
P
| 6220205 |
| 6220 |
| MP 0.5 |
| 0.5 |
| P |
| P |
| 6220241 |
| 6220 |
| MP 0.3 |
| 0.3 |
P
P
| 6220250 |
| 6220 |
| MP 0.25 |
| 0.25 |
P
P
| 6220262 |
| 6220 |
| MP 0.5 |
| 0.5 |
| P |
| P |
| 6220264 |
| 6220 |
| MP 0.5 |
| 0.5 |
| P |
| P |
| 6220280 |
| 6220 |
| MP 0.8 |
| 0.8 |
P
P
| 6220300 |
| 6220 |
| MP 3.8 |
| 3.8 |
P
P
P
| 6220356 |
| 6220300 |
| MP 0.2 |
| 0.2 |
P
P
| 6220360 |
| 6220 |
| MP 1.0 |
| 1.0 |
P
P
| 6220362 |
| 6220360 |
| MP 0.3 |
| 0.3 |
| P |
| P |
| 6200 |
| MP 0.0 |
| MP 12.0 |
| 12.0 |
| P |
| P |
| D |
| P |
| P |
| P |
| P |
| 6205 |
| 62 |
| MP 3.8 |
| 3.8 |
| P |
| D |
P
| P |
| P |
| 6205050 |
| 6205 |
| MP 4.8 |
| 4.8 |
| P |
| D |
P
P
| 6205100 |
| 6205050 |
| MP 1.4 |
| 1.4 |
| P |
| P |
| 6205106 |
| 6205100 |
| MP 0.7 |
| 0.7 |
| P |
| P |
| 6205108 |
| 6205106 |
| MP 0.3 |
| 0.3 |
| P |
| P |
| 6205057 |
| 6205050 |
| MP 0.3 |
| 0.3 |
D
P
P
| 6205070 |
| 6205057 |
| MP 2.0 |
| 2.0 |
D
P
P
| 6205077 |
| 6205057 |
| MP 0.5 |
| 0.5 |
P
P
| 6205080 |
| 6205057 |
| MP 0.4 |
| 0.4 |
| P |
| D |
P
P
| 6205090 |
| 6205050 |
| MP 0.4 |
| 0.4 |
| P |
| P |
| 6205092 |
| 6205090 |
| MP 0.3 |
| 0.3 |
| P |
| P |
| 6210 |
| 62 |
| MP 5.5 |
| 5.5 |
| P |
| D |
P
| P |
| P |
| 6210100 |
| 6210 |
| MP 0.3 |
| 0.3 |
| P |
| P |
| 6210105 |
| 6210 |
| MP 0.2 |
| 0.2 |
| P |
| P |
| 6210165 |
| 6210 |
| MP 0.7 |
| 0.7 |
P
P
| 6220985 |
| 6220 |
| MP 0.1 |
| 0.1 |
P
P
| Road |
| Termini |
| Miles |
| Applicable POST HAUL Road Maintenance Specifications |
| From |
| To |
| T-811F |
| T-831F |
| T-834F |
| T-836F |
| T-838F |
| T-839F |
| T-891F |
Mill Creek Lane
| 6220 |
| Mill Creek Lane |
| MP 4.7 |
| 4.7 |
| P |
| P |
| P |
P
| 6220200 |
| 6220 |
| MP 0.6 |
| 0.6 |
P
| 6220200 |
| MP 0.6 |
| MP 2.5 |
| 1.9 |
P
| 6220205 |
| 6220 |
| MP 0.5 |
| 0.5 |
P
| 6220241 |
| 6220 |
| MP 0.3 |
| 0.3 |
P
| 6220250 |
| 6220 |
| MP 0.25 |
| 0.25 |
P
| 6220262 |
| 6220 |
| MP 0.5 |
| 0.5 |
P
| 6220264 |
| 6220 |
| MP 0.5 |
| 0.5 |
P
| 6220280 |
| 6220 |
| MP 0.8 |
| 0.8 |
P
| 6220300 |
| 6220 |
| MP 3.8 |
| 3.8 |
P
| 6220356 |
| 6220300 |
| MP 0.2 |
| 0.2 |
P
| 6220360 |
| 6220 |
| MP 1.0 |
| 1.0 |
P
| 6220362 |
| 6220360 |
| MP 0.3 |
| 0.3 |
P*
| 6200 |
| MP 0.0 |
| MP 12.0 |
| 12.0 |
| P |
| P |
| P |
P
| 6205 |
| 62 |
| MP 3.8 |
| 3.8 |
P
| 6205050 |
| 6205 |
| MP 4.8 |
| 4.8 |
P
| 6205100 |
| 6205050 |
| MP 1.4 |
| 1.4 |
P
| 6205106 |
| 6205100 |
| MP 0.7 |
| 0.7 |
P
| 6205108 |
| 6205106 |
| MP 0.3 |
| 0.3 |
P
| 6205057 |
| 6205050 |
| MP 0.3 |
| 0.3 |
P
| 6205070 |
| 6205057 |
| MP 2.0 |
| 2.0 |
P
| 6205077 |
| 6205057 |
| MP 0.5 |
| 0.5 |
P
| 6205080 |
| 6205057 |
| MP 0.4 |
| 0.4 |
P
| 6205090 |
| 6205050 |
| MP 0.4 |
| 0.4 |
P
| 6205092 |
| 6205090 |
| MP 0.3 |
| 0.3 |
P
| 6210 |
| 62 |
| MP 5.5 |
| 5.5 |
P
| 6210100 |
| 6210 |
| MP 0.3 |
| 0.3 |
P
| 6210105 |
| 6210 |
| MP 0.2 |
| 0.2 |
P
| 6210165 |
| 6210 |
| MP 0.7 |
| 0.7 |
P
| 6220985 |
| 6220 |
| MP 0.1 |
| 0.1 |
P
Special Requirements
* Make culvert functional for purposes of haul. Remove culvert and shape bank when hauling is complete.
COVE II STEWARDSHIP – APPENDIX C
| Contract Name: |
| Cove II Stewardship |
ROAD MAINTENANCE REQUIREMENTS DETAILS (2012)
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
Special
Dust
Post
| Road No. |
| Project |
| Travel Way |
| Brush |
| Abatement |
| Seasonal |
Haul
| and |
| Specifi- |
X
And
Applic
| Mainte- |
| Snow |
| Termini |
| cation |
| Width |
| Slope |
| Comp |
| Log Out |
| Surfacing |
| Product |
| Rate |
| Width |
| nance |
| Removal |
| Block |
| Treat |
| Mill Creek Lane |
| T812F |
B
| LigS |
| 0.35 gal/yd2 |
| 18 |
| 6220 |
| T811F |
| EX |
| AI |
| B |
P
| T812F |
| EX |
| B |
| OPT, 5’L&R |
OPT
T813F
D
T834F Drawing
#CB-1
T854F
P
| 6220200-1 |
| T812F |
ALL
T813F
D
T836F
| EX |
| AI |
| B |
| Opt, 5’L&R |
U
#UD-1
P
T854F
P
| 6220200-2 |
| T812F |
ALL
T813F
Pit Run 4” Max 200yd
T836F
| EX |
| AI |
| B |
| Opt, 5’L&R |
U
P
T854F
P
| 6220205 |
| T813F |
Pit Run 4” Max 20yd
T839F
| EX |
| AI |
Opt, 5’L&R
W
#WB-12
P
#WB-12, #EB-2
T854F
P
| 6220241 |
| T813F |
Pit Run 4” Max 20yd
T838F
| EX |
| AI |
Opt, 5’L&R
W
#WB-6
P
T854F
P
| 6220250 |
| T838F |
Drawing
| EX |
| AI |
Opt, 5’L&R
W
P
T854F
P
| 6220262 |
| T839F |
Drawing
| EX |
| AI |
Opt, 5’L&R
W,B
P
T854F
P
| 6220264 |
| T839F |
Drawing
| EX |
| AI |
Opt, 5’L&R
W,B
P
T854F
P
| 6220280 |
| T813F |
Pit Run 4” Max 75yd
T838F
| EX |
| AI |
Opt, 5’L&R
W
P
T854F
P
| 6220300 |
| T812F |
ALL
T813F
Pit Run 4” Max 100yd
T836F
| EX |
| AI |
| B |
| Opt, 5’L&R |
U
P
T854F
P
| 6220356 |
| T838F |
Drawing
| EX |
| AI |
Opt, 5’L&R
W
P
T854F
P
| 6220360 |
| T813F |
Pit Run 4” Max 270yd
T838F
| EX |
| AI |
Opt, 5’L&R
W
P
T854F
P
| 6220362 |
| T839F |
Drawing
| EX |
| AI |
Opt, 5’L&R
W
#WB-12
P
T854F
P
| 6200 |
| T811F |
| EX |
| AI |
| B |
T812F
OPT
T813F
D
T834F
#CB-1
T854F
P
| 6205 |
| T812F |
ALL
T813F
D
T836F
| EX |
| AI |
| B |
| Opt, 5’L&R |
U
P
T854F
P
| 6205050 |
| T812F |
ALL
T813F
D
T836F
| EX |
| AI |
| B |
| Opt, 5’L&R |
U
P
T854F
P
| 6205100 |
| T839F |
Drawing
| EX |
| AI |
Opt, 5’L&R
W,B
W,P
T854F
P
| 6205106 |
| T839F |
| EX |
| AI |
Opt, 5’L&R
W,B
W,P
T854F
P
| 6205108 |
| T839F |
Drawing
| EX |
| AI |
Opt, 5’L&R
W
#WB-12,
W,P
T854F
P
| 6205057 |
| T813F |
D
T838F
| EX |
| AI |
Opt, 5’L&R
W
P
T854F
P
| 6205070 |
| T813F |
D
T838F
| EX |
| AI |
Opt, 5’L&R
W
P
T854F
P
| 6205077 |
| T838F |
| EX |
| AI |
Opt, 5’L&R
W
P
T854F
P
| 6205080 |
| T812F |
ALL
T813F
D
T836F
| EX |
| AI |
| B |
| Opt, 5’L&R |
U
P
T854F
P
| 6205090 |
| T839F |
Drawing
| EX |
| AI |
Opt, 5’L&R
W,B
W,P
T854F
P
| 6205092 |
| T839F |
Drawing
| EX |
| AI |
Opt, 5’L&R
W,B
W,P
T854F
P
| 6210 |
| T812F |
ALL
T813F
D
T836F
| EX |
| AI |
| B |
| Opt, 5’L&R |
U
P
T854F
P
| 6210100 |
| T839F |
Drawing
| EX |
| AI |
Opt, 5’L&R
W
#WB-12,
W,P
T854F
P
| 6210105 |
| T839F |
Drawing
| EX |
| AI |
Opt, 5’L&R
W,B
W,P
T854F
P
| 6210165 |
| T838F |
Drawing
| EX |
| AI |
Opt, 5’L&R
W
P
T854F
P
| 6220985 |
| T838F |
Drawing
| EX |
| AI |
Opt, 5’L&R
W
P
T854F
P
ABBREVIATIONS for ROAD MAINTENANCE REQUIREMENTS TABLE
| Column No. |
| Heading |
| Entry |
| Explanation |
| Any |
| Blank |
| Except as otherwise described, no entry indicates Contractor is not authorized or required to perform the work item(s). |
| Any |
| RC |
| This work requirement applies only when haul of project related construction materials occurs. |
| 2 |
| Special Project Specification |
| Number |
| Entry indicates Special Project Specification which applies. |
| 3 |
| Travel Way |
| EX |
| Contractor shall maintain the traveled way to the width existing upon entry, or at the completion of Specified Road work. |
| Numbers |
| Contractor shall maintain the traveled way to the standard width indicated by the entry, plus curve widening, in accordance with Section T-811. If required, the road template shall be shaped to this width and to the designated cross slope before haul and during recurring maintenance. |
| IS, C, OS, F, or AI |
| Cross slopes are designated as: |
IS (Inslope), C (Crown), OS (Outslope), F (Flat), AI (As Is).
| A or B |
| If compaction is required. |
| 4 |
| Brush and Log Out |
| Numeric & R and or L |
| Contractor shall remove brush for specified width on either or both the right (R) side or left (L) side of road. |
| As Staked |
| Limits of brushing are as staked or marked in the field. |
| OPT |
| Contractor may use hand or mechanical means of brushing. |
| H |
| Only hand brushing may be used. |
| 5 |
| Surfacing |
| Aggregate Grading |
| Contractor shall place surfacing on roads listed according to the grading indicated. |
| D |
| Contractor is to make deposits for listed road maintenance, including surface rock replacement. |
| Column No. |
| Heading |
| Entry |
| Explanation |
| 6 |
| Dust Abatement |
| OPT |
| Product selection is Contractor's choice from those listed in Section T-812. |
| ALL |
| All products are available for contractor selection. Contractor may also choose water or varying the time of day haul occurs. |
| Product Abbr. |
| Unless otherwise agreed, Contractor is restricted to product listed corresponding to the abbreviation shown in Section T-812; (i.e., LigS = Lignon Sulfonate) Application rates are estimated amounts. |
| EX |
| Contractor shall abate dust on the existing width |
| Numbers |
| Contractor shall abate dust to the width indicated by entry. |
| 7 |
| Seasonal Maintenance |
| W |
| Waterbars and/or crossditching shall be required prior to expected seasonal precipitation. |
| U |
| Utah dip shall be required prior to expected seasonal precipitation. |
| B |
| Entrance barriers shall be installed by Contractor prior to nonuse periods. |
| 8 |
| Snow Removal |
| TS |
| Snowplowing authorized for Contractor's Operations without recreation access being provided per Section T-803 requirements. |
| JU |
| Snowplowing authorized, but must provide for recreation joint use per Section T-803 requirements. |
| Blank |
| Snowplowing is not authorized. Forest Service may authorize plowing by permit when not in conflict with other uses. |
| 9 |
| Post Haul |
| P |
| P denotes that work is Contractor's Responsibility to perform. |
SAMPLE SAMPLE SAMPLE SAMPLE
| Contract Name: |
| Sumagowi |
| Page |
| 22 |
CONTRACT ROAD MAINTENANCE REQUIREMENTS SUMMARY TABLE PURSUANT TO
KT-FT.3.1# - ROAD MAINTENANCE REQUIREMENTS (09/2004)
Contract Road Maintenance Requirements Summary
| Road |
| Termini |
| Miles |
| Applicable Prehaul Road Maintenance Specifications |
| From |
| To |
| T-811 |
| T-842 |
| T-851 |
| 1200550 |
| MP1.5 |
| MP2.8 |
| 1.3 |
| P |
| P |
| P |
| 1200560 |
| Jct Rd 1200550 |
| MP5.1 |
| 0.3 |
| P |
| P |
| P |
| 1200565 |
| MP0.0 |
| MP1.2 |
| 1.2 |
| P |
| P |
| P |
| Road |
| Termini |
| Miles |
| Applicable During Haul Road Maintenance Specifications |
| From |
| To |
| T-803 |
| T-811 |
| T-831 |
| T-834 |
| T-838 |
| 1200550 |
| MP1.5 |
| MP2.8 |
| 1.3 |
| P |
| P |
| P |
| P |
| P |
| 1200560 |
| MP4.8 |
| MP5.1 |
| 0.3 |
| P |
| P |
| P |
| P |
| P |
| 1200565 |
| MP0.0 |
| MP1.2 |
| 1.2 |
| P |
| P |
| P |
| P |
| P |
| 5200 |
| County Rd 52 |
| Jct Rd 1200550 |
| 5.2 |
| D |
| D |
| D |
| D |
| D |
| Road |
| Termini |
| Miles |
| Applicable Post Haul Road Maintenance Specifications |
| From |
| To |
| T-811 |
| T-835 |
| T-841 |
| 1200550 |
| MP1.5 |
| MP2.8 |
| 1.3 |
| P |
| P |
| P |
| 1200560 |
| Jct Rd 1200550 |
| MP5.1 |
| 0.3 |
| P |
| P |
| P |
| 1200565 |
| MP0.0 |
| MP1.2 |
| 1.2 |
| P |
| P |
| P |
Description of work required by the above listed T-specs is shown in the following ROAD MAINTENANCE REQUIREMENTS SPECIFICATION table, and included in the Integrated Resource Contract.
SAMPLE SAMPLE SAMPLE SAMPLE
| Contract Name: |
| Sumagowi |
| Page |
| 22a |
ROAD MAINTENANCE REQUIREMENTS SPECIFICATION TABLE PURSUANT TO
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
Special
Dust
Post
| Road No. |
| Project |
| Travel Way |
| Brush |
| Abatement |
| Seasonal |
Haul
| and |
| Specifi- |
X
And
Applic
| Mainte- |
| Snow |
| Termini |
| cation |
| Width |
| Slope |
| Comp |
| Log Out |
| Surfacing |
| Product |
| Rate |
| Width |
| nance |
| Removal |
| Block |
| Treat |
1200550 MP1.5 to MP2.8
| Ex |
| C |
| A |
| As |
Staked
| W |
| TS |
PR
1200560 Jct Rd 1200550 to
MP5.1
| Ex |
| C |
| A |
| As |
| W |
| TS |
PR
1200565 MP0.0 to
MP1.2
| Ex |
| AI |
| B |
| As |
| B, W |
| TS |
| PR |
| PR |
| SAMPLE | SAMPLE | SAMPLE | SAMPLE | |
| Contract Name: | ||||
| Sumagowi |
| Page |
| 22b |
ROAD MAINTENANCE REQUIREMENTS SPECIFICATION CODES TABLE PURSUANT TO
| Column No. |
| Heading |
| Entry |
| Explanation |
| Any |
| Blank |
| Except as otherwise described, no entry indicates Contractor is not authorized or required to perform the work item(s). |
| Any |
| RC |
| This work requirement applies only when haul of project related construction materials occurs. |
| 2 |
| Special Project Specification |
| Number |
| Entry indicates Special Project Specification which applies. |
| 3 |
| Travel Way |
| EX |
| Contractor shall maintain the traveled way to the width existing upon entry, or at the completion of Specified Road work. |
| Numbers |
| Contractor shall maintain the traveled way to the standard width indicated by the entry, plus curve widening, in accordance with Section T-811. If required, the road template shall be shaped to this width and to the designated cross slope before haul and during recurring maintenance. |
| IS, C, OS, F, or AI |
| Cross slopes are designated as: |
IS (Inslope), C (Crown), OS (Outslope), F (Flat), AI (As Is).
| A or B |
| If compaction is required. |
| 4 |
| Brush and Log Out |
| Numeric & R and or L |
| Contractor shall remove brush for specified width on either or both the right (R) side or left (L) side of road. |
| As Staked |
| Limits of brushing are as staked or marked in the field. |
| OPT |
| Contractor may use hand or mechanical means of brushing. |
| H |
| Only hand brushing may be used. |
SAMPLE SAMPLE SAMPLE SAMPLE
| Contract Name: |
| Sumagowi |
| Page |
| 22c |
ROAD MAINTENANCE REQUIREMENTS SPECIFICATION CODES TABLE PURSUANT TO
| Column No. |
| Heading |
| Entry |
| Explanation |
| 5 |
| Surfacing |
| Aggregate Grading |
| Contractor shall place surfacing on roads listed according to the grading indicated. |
| D |
| Contractor is to make deposits for listed road maintenance, including surface rock replacement. |
| 6 |
| Dust Abatement |
| OPT |
| Product selection is Contractor's choice from those listed in Section T-812. |
| Product Abbr. |
| Unless otherwise agreed, Contractor is restricted to product listed corresponding to the abbreviation shown in Section T-812; (i.e., LigS = Lignon Sulfonate) Application rates are estimated amounts. |
| EX |
| Contractor shall abate dust on the existing width |
| Numbers |
| Contractor shall abate dust to the width indicated by entry. |
| 7 |
| Seasonal Maintenance |
| W |
| Waterbars and/or crossditching shall be required prior to expected seasonal precipitation. |
| B |
| Entrance barriers shall be installed by Contractor prior to nonuse periods. |
| 8 |
| Snow Removal |
| TS |
| Snowplowing authorized for Contractor's Operations without recreation access being provided per Section T-803 requirements. |
| JU |
| Snowplowing authorized, but must provide for recreation joint use per Section T-803 requirements. |
| Blank |
| Snowplowing is not authorized. Forest Service may authorize plowing by permit when not in conflict with other uses. |
| 9 |
| Post Haul |
| P |
| P denotes that work is Contractor's Responsibility to perform. |