B. Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to Cove II Stewardship Project, newest first.
File Type Posted
AmendmentNo1.rtf RTF text file
Cove_II_Stew_Cruise_Vol_Info_Request.pdf PDF
m.Construction_Wage_Determination.mht MHT file
d.CoveII_Stew_Map_SOUTH.pdf PDF
k.APPENDIX_D_Road_Recon_Drawing.pdf PDF
i.APPENDIX_C_Road_Mtce_Drawings.pdf PDF
a.offerors_packet.docx DOCX document
g.APPENDIX_C_Road_Mtce_Specs.docx DOCX document
f.APPENDIX_B_SCALED_TIMBER_SPECS.doc DOC document
l.Service_Wage_Determination77-0079_sca.mht MHT file
j.APPENDIX_D_Road_Recon_Specs.docx DOCX document
e.APPENDIX_A.docx DOCX document
c.CoveII_Stew_Map_NORTH.pdf PDF
h.APPENDIX_C_Road_Mtce_Tables.docx DOCX document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cove II Stewardship Solicitation No. AG-04M3-S-13-0008 Page 34 of 47

Integrated Resource Service Contract (IRSC) — Construction

SOLICITATION OFFER AND AWARD
1.THIS CONTRACT IS A RATED ORDER
RATING
PAGE
OF PAGES

UNDER DPAS (15 CFR 350)

1
46
2. CONTRACT NO.
3. SOLICITATION NO.
4. TYPE OF SOLICITATION
5. DATE ISSUED
6. REQUISITION/PURCHASE NUMBER
AG-04M3-S-13-0008
[ ]
SEALED BID (IFB)

627115

[X ]
NEGOTIATED (RFP)
05/10/2013
7. ISSUED BY
CODE

8. ADDRESS OFFER TO (If other than Item 7)

Wallowa Whitman National Forest 1550 Dewey Avenue Baker City, OR 97814

Wallowa Whitman National Forest 1550 Dewey Avenue Baker City, OR 97814

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and
1
copies for furnishing the supplies or serviced in the Schedule will be received at the place specified in Item 8, or if
handcarried, in the depository located in
same address as Item 8
until
4:30 PM
local time
July 9, 2013

(Hour)

(Date)

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-10. All Offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME
B. TELEPHONE (NO COLLECT CALLS)
C. E-MAIL ADDRESS

Annie Stanbro, Administrative Julie Tarvin, Technical

AREA CODE
NUMBER
EXT.
astanbro@fs.fed.us

11. TABLE OF CONTENTS

()
SEC.
DESCRIPTION
PAGE(S)
()
SEC.
DESCRIPTION
PAGE(S)
PART I - THE SCHEDULE
PART II - CONTRACT CLAUSES
A
SOLICITATION/CONTRACT FORM
I
CONTRACT CLAUSES
B
SUPPLIES OR SERVICES AND PRICES/COSTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.

C
DESCRIPTION/SPECS./WORK/STATEMENT
J
LIST OF ATTACHMENTS
D
PACKAGING AND MARKING

PART IV - REPRESENTATIONS AND INSTRUCTIONS

E
INSPECTION AND ACCEPTANCE
K
REPRESENTATIVES, CERTIFICATIONS AND
F
DELIVERIES OR PERFORMANCE

OTHER STATEMENTS OF OFFERORS

G
CONTRACT ADMINISTRATION DATA
L
INSTRS., CONDS., AND NOTICES TO OFFERORS
H
SPECIAL CONTRACT REQUIREMENTS
M
EVALUATION FACTORS FOR AWARD

OFFER (Must be fully completed by offeror)

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT
10 CALENDAR DAYS
20 CALENDAR DAYS
30 CALENDAR DAYS
CALENDAR DAYS

(See Section I, Clause No. 52-232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT NO.
DATE
AMENDMENT NO.
DATE

(The offeror acknowledges receipt of amend-ments to the SOLICITATION for offerors and related documents numbered and dated.

15A. NAME AND

ADDRESS

OF

OFFEROR

CODE

FACILITY

16.
NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or Print)

DUNS:

15B. TELEPHONE NO.

15C. CHECK IF REMITTANCE ADDRESS
17. SIGNATURE
18. OFFER DATE
AREA CODE
NUMBER
EXT.

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED
20. AMOUNT
21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN

COMPETITION:

23. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM

10 U.S.C. 2304 (c) )

41U.S.C. 142(c)
(
)
(4 copies unless otherwise specified)
24. ADMINISTERED BY (If other than Item 7)
CODE
25. PAYMENT WILL BE MADE BY
CODE

Albuquerque Service Center – Miscellaneous Payments 101B Sun Ave NE Albuquerque, NM 87109

26. NAME OF CONTRACTING OFFICER (Type or print)
27. UNITED STATES OF AMERICA
28. AWARD DATE

Andrea Stanbro

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

STANDARD FORM 33 (REV.9-97)

Previous edition is unusable

Prescribed by GSA - FAR (48 CFR) 53.214(c)

PART I – THE SCHEDULE

SECTION B – SERVICES AND PRICES

SCHEDULE OF ITEMS

B.1 SCHEDULE OF SERVICE ITEMS:

NOTE: Price Proposals MUST be provided on ALL Items in Schedules B-1, Base and Option Work Activities and B-2, Timber Removal Price Schedule.

Note: These schedules are for pricing/payment purposes. See Instructions to Offerors for business proposal requirements.

SERVICES AND PRICES

Contractor Name

ITEM NO.
DESCRIPTION

BASE WORK ACTIVITIES

UNIT
ESTIMATED

QUANTITY

UNIT PRICE
TOTAL
1
Cut, skid and deliver timber

Harvest Operations

Acre
760
$
$
2
Road Maintenance
Lump Sum
1
$
$
3
OPTIONAL WORK ACTIVITY:

Road Reconstruction – 6220 Rock Placement

15101 – Mobilization
Lump Sum
1
$
$
30301 – Reconditioning of Road and Ditch, Compaction B
Mile
3.3
$
$
32201 – Crushed Aggregate, ¾” Grading D, Compaction B (Commercial Source), Contract Quantity
Cubic Yard
1,400
$
$
Total Items 1, 2, and 3
$

B.2 TIMBER/PRODUCT REMOVAL PRICE SCHEDULE:

SPECIES

PRODUCT

QUANTITY

UNIT OF MEASURE

MINIMUM ACCEPTABLE OFFER/TON

OFFER

(FLAT)

TOTAL OFFER

White fir and Other Coniferous Species

Sawlogs, and Green Convertible Biomass, Live and Dead

36,620

TONS

$0.21

Total – All Products
$

In addition to the price to be paid by the contractor for timber products to be removed, the contractor shall pay deposits for road maintenance in the amount of $ .77 per TON.”

A co-op deposit of $0.01/Ton will be collected from the Contractor to cover the cost of culturing, growing, and harvesting seed from native plants.

NOTE: Timber Volume Summary available upon request.

B.3 LAND MANAGEMENT ACTIVITIES.

Performance of land management activities shall be in accordance with Section C – Project Description and Work Specifications. Payment for Land Management Work Activities in Schedule B-1 will be made in Stewardship Credits in lieu of cash, as defined in Section G. All Base Work Activities shall be performed. Option activities are listed in order of planned priority. Award may be made for option items in any order that the Contracting Officer determines is in the best interest of the Government.

PART I - THE SCHEDULE

SECTION C - DESCRIPTION AND SPECIFICATIONS

General Clauses and Provisions Pertaining To All Items

C.1 AGAR 452.211-72 STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

C.2 PROJECT DESCRIPTION

a) Description of Work - This solicitation and any resultant contract is a stewardship project in accordance with Section 323 of Public Law 108-7 (16 U.S.C. 2104 Note, as revised February 28, 2003 to reflect sec. 323 of J.J. Res. 2 as enrolled), the Consolidated Appropriations Resolution, 2003, amending Public Law 105-277, sec. 347. This is a service acquisition with road reconstruction that has been tailored to fit the Government’s method of trading goods for services.

b) The overall project objective focuses on fuels reduction and development of defensible space with the Cove Wildland Urban Interface (WUI). Work within this contract includes all typical work activities associated with timber harvest, including road maintenance work and road reconstruction on specified haul routes. (Reconstruction is estimated at less than $100,000.) In addition, road reconstruction work is included to place additional rock on Forest Road 6220. It is anticipated that additional fuels treatment work will be needed upon completion of this contract to further reduce fuels loadings not associated with harvest activities.

c) Resulting Contract – Any resultant contract will be a construction contract with provisions for timber removal.

d) Project Location – This project is located on lands administered by La Grande Ranger District of the Wallowa-Whitman National Forest. Vicinity maps showing project locations and access are attached and made a part of the contract. All township and range locations are predicated upon the Williamtte Base Meridian. The project area includes sections 13, 14, 22, 23, 24, 25, 26, 27, 35 & 36 of Township 2 South, Range 40 East; sections 7, 8, 17, 18, 19, 20, 21, 28, 29, 30, 31, 32 & 33 of Township 2 South, Range 41 East. Primary access roads to units within the project are Forest Roads 6200 and 6220. Approximate distance to La Grande is 30 miles.

C.3 SPECIFICATIONS

Specifications for each Stewardship Activity individually described by an item number in Schedule B pages can be found in Appendix A. Specifications for timber removal can be found in Appendix B. Road Maintenance plans and specifications can be found in Appendix C. Road Construction plans and supplemental specifications can be found in Appendix D. Specifications cited in this solicitation for road construction and reconstruction may be obtained from:

Publication Name
Address

Standard Spedifications for Construction of Roads and Bridges on Federal highway Projects FP-03, US Department of Transportation, Federal Highway Administration, Publication No. FHWA-FLH-03-002

U.S. Department of Transportation Federal Highway Administration Office of Federl Lands Highway 1200 New Jersey Avenue, SE Washington, DC 20590 (202)366-9494 http://flh.fhwa.dot.gov/resources/pse/specs/fp-03/fp-03usc.pdf

C.4 CONTRACT AREA MAP

The boundaries of Subdivisions or Payment Units and any cutting units thereof, are as shown on the attached "Contract Area Map," which is made a part hereof, and were, before solicitation, designated on the ground by Forest Service to meet the anticipated needs of the parties. The location of the Subdivisions or Payment Units and their approximate acreage are stated in Division A/AT. Subdivisions or Payment Units may be revised and additional ones may be established only by written agreement of both parties. Where applicable, the following are also identified on Contract Area Map:

(a)Identified claims limiting Contractor's rights;
(b)Boundaries of cutting units;
(c)Areas where leave trees are Marked to be left uncut;
(d)Roads listed
(e)Sources of base course, rock riprap and surface rock;
(f)Roads where log hauling is prohibited or restricted;
(g)Roads and trails to be kept open;
(h)Improvements to be protected;
(i)Locations of known historical sites;
(j)Maximum stump heights when more than one height is listed by areas;
(k)Skidding or yarding methods specified;
(l)Streamcourses to be protected;
(m)Other features required by Appendix B; and
(n)Boundaries of stewardship work activities.

(o) Road reconstruction

C.5 GOVERNMENT-FURNISHED PROPERTY

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause 52.245-1 contained in Section I of the contract.

(a) Grass seed – See Appendix B for specific information.

(b) Product Removal Permits – See Appendix B for specific information.

SECTION D – PACKAGING AND MARKING

There are no clauses in this section.

SECTION E - INSPECTION AND ACCEPTANCE

E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://www.acquisition.gov/far

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-04Inspection of Services – Fixed Price (AUG 1996)
52.246-12Inspection of Construction (AUG 1996)

E.2 CONTRACTOR QUALITY CONTROL INSPECTION SYSTEM

The Contractor shall identify the quality control inspection system it will use to ensure that contract specifications will be achieved. At no time shall the contractor rely upon Government inspections to provide notification of unsatisfactory performance. The Contractor shall produce written inspection records in a format and at times and places satisfactory to the Contracting Officer. Inspection records shall be made available upon request of the Contracting Officer and be maintained until the date of contract closure. The Contracting Officer may observe the Contractor's inspection at any time and shall otherwise have unlimited access to the inspection data.

E.3 ACCEPTANCE

The Forest Service shall perform an inspection upon Contractor’s written request and assurance that work has been completed. Request shall be for a reasonable portion of work. Acceptance may be made for all or portions of work.

E.4 GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN

Quality assurance plans specific to individual items will be found in Appendix A.

SECTION F - DELIVERIES OR PERFORMANCE

F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address:

http://www.acquisition.gov/far

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.242-14Suspension of Work (APR 1984)
52.242-15Stop-Work Order (AUG 1989)
52.242-17Government Delay of Work (APR 1984)
52.247-55F.O.B. Point for Delivery of Government-Furnished Property (JUN 2003)

F. 2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after receipt of Notice to Proceed or Task Order for specific work items, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than October 31, 2016. The time stated for completion shall include final cleanup of the premises.

Performance shall be made only as authorized by orders issued in accordance with the Ordering clauses. Except as this contract otherwise provides, the Government shall order all services within the scope that are required by Government activities specified in the Schedule only with the vendor holding this contract for the specified services. Timber or other products Removal activities shall be scheduled and carried out in accordance with the Timber or other products Removal Specifications in Appendix B and as approved by the Contracting Officer.

It is estimated that work will begin September 1, 2013. Actual date is negotiable based upon actual award date, prospective work and weather conditions.

Any restrictions on the Scheduling of Work for resource protection, etc. will be addressed in the Technical Specifications.

Scheduling of Work may be restricted based on the following:

· Restrict operations within Units 111, 122 and 124 during period April 1 to August 31 to protect raptor nest site.

· Restrict operations within Units 108, 111, 118, 124, 125, 137, 138, 140, 301 and 306 during big game winter range period December 15 to April 1.

· Restrict road use to the typical operating period of July 1 to October 31 to protect water quality and prevent road damage. Dry or frozen road conditions are suitable for use.

F.3 AGAR 452.236-75 MAXIMUM WORKWEEK – CONSTRUCTION SCHEDULE (NOV 1996)

Within 5 calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following in writing for approval:

(a) A schedule as required by FAR clause 52.236-15 “Schedules for Construction Contracts” and

(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposes to carry out the work. Construction operations will be allowed only on non-holiday weekdays.

F.4 SCHEDULES AND REPORTS

Contractor shall provide the following submittals within 5 days after issuance of a Notice to Proceed or Task Order for review and/or approval, unless stated elsewhere in the specifications or otherwise mutually agreed:

ITEM DESCRIPTION
COPIES REQUIRED
Proposed progress schedule showing starting and completion dates of various phases of the work
2
List of proposed sub-contractors and their intended work. Sub-contractors must have Contracting Officer’s written approval prior to starting work on the project. Submit on Standard Form 1413.
2
Traffic Control Plan
2
Soil Erosion and Water Pollution Control Plan
2
Designation of Contractor personnel describing responsibilities and authorities
2
Job-specific Safety Plan
2
Fire Plan
2

All schedules and reports shall be submitted to: Service COR, Julie Tarvin and/or Construction COR, Brett Yaw

The Contractor shall bring the following to the post award meeting for discussion and/or approval:

1.Contract, Specifications, Plans, Maps
2.Safety Plan, see Clause H.5 below
3.Fire Plan

SECTION G – CONTRACT ADMINISTRATION DATA

General Clauses Pertaining To All Items

G.1 PAYMENT

It is anticipated that funds will be exchanged in the performance of this contract because the value of the timber or other products will not completely offset the value of the work to be performed. Payment shall only be made under this clause to the extent that the work performed will not be offset by the timber or other products value during the contract period. When payment is made to the contractor for work performed, it will be made in accordance with FAR 52.232-1 – Payments, (Section I).

The value of work completed and timber or other products removed will be documented in a Stewardship Statement of Account produced by Timber Sale Accounting (TSA) monthly when harvesting operations are underway.

G.2 INCIDENTAL PAYMENT ITEMS

The intent of the contract is to provide for the complete performance of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.

G.3 PRODUCT PAYMENT GUARANTEE

To guarantee payment for product in advance of cutting, Contractor may earn Stewardship Credits in advance of cutting, or provide a product payment guarantee in the form of an acceptable surety payment bond, irrevocable letter of credit (ILOC), cash, or a deposit in a Federal Depository negotiable securities of the United States.

Any earned stewardship credits and product payment guarantee together will maintain a minimum unobligated balance equal to the applicable charges for product the Forest Service estimates will be cut or removed in not less than 30 calendar days and not more than 60 calendar days, plus the value of any outstanding charges for product removed.

Securities shall be deposited through the Contracting Officer accompanied by a power of attorney and agreement authorizing the bond-approving officer to sell or collect such securities if payment is not made within 15 days of billing by Forest Service. The penal sum of such surety bond or the market value at time of deposit of such negotiable securities shall be the maximum amount of the payment guaranteed.

Product payment guarantee for a single contract shall be provided utilizing Form FS6500-12 Payment Bond.

Blanket Payment Bond:

a. Contractor may furnish an acceptable bond, or deposits securities, to guarantee payment for product from multiple contracts. Contractor shall not start cutting hereunder until this contract receives an allocation that will meet the obligation for product payment guarantee.

b. The amount of such bond or deposited securities shall be allocated to such contracts by the Forest Service. The Contractor shall provide the contact information for the Forest Service representative administering the blanket payment bond to the Contracting Officer. The Forest Service representative administering the blanket payment bond will provide the Contracting Officer with documentation showing the allocation to this contract.

c. When there is to be no product cutting or removal hereunder for 30 days or more and payment of current charges has been made, the allocation to this contract may be reallocated to other contracts at Contractor’s request.

d. Payment guaranteed with acceptable blanket payment bond for multiple contracts shall be provided utilizing Form FS-6500-12a Blanket Payment Bond.

G.4 REIMBURSEMENT FOR BOND PREMIUMS

The Contract Price includes the total amount for premiums that the Contractor attributes to the furnishing of the performance and/or payment bonds required by the contract. Reimbursement for bond premiums may be made in stewardship credits or cash.

G.5 STEWARDSHIP CREDITS

Stewardship Credits are credits that are earned and established when work listed in the B.1 Schedule of Supplies/Services has been performed and accepted. Stewardship credits shall be earned at the rate as shown in the Schedule. Earned credits may be used to pay for timber or other products value included in Schedule B.2. Unless otherwise indicated in the Schedules, credits will be earned based upon Actual Quantities accomplished and accepted.

G.6 ESTABLISHMENT OF STEWARDSHIP CREDITS

Notwithstanding references to payments in “Payment” clauses of this contract, payment for Stewardship Activities will be made with Product Value or other funding as indicated in the award document.

Stewardship Credits will be established on a monthly basis. Stewardship credits will be established for the number of units of each activity that have been completed and accepted. Acceptance may be for all, or a reasonable portion of, any specific activity.

Stewardship credits will not be established for work that is in progress that has not been accepted by the Forest Service. No credits will be established for work performed under terms of Schedule B.2.

G.7 CONTRACTOR CERTIFICATION

Monthly, as Stewardship Credits are established, the Contractor shall furnish the following certification (Contractor Certification - Earned Stewardship Credits) or credit will not be received.

CONTRACTOR CERTIFICATION - EARNED STEWARDSHIP CREDITS

COVE II STEWARDSHIP PROJECT

I hereby certify, to the best of my knowledge and belief, that--

(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;

(2) Payments to subcontractors and suppliers have been made, and timely payments will be made for the work activities covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;

(3) This request for progress payments/credits does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and

(4) This certification is not to be construed as final acceptance of a subcontractor's performance.

(Name)

(Title)

(Date)

G.8 EXCESS STEWARDSHIP CREDITS

In the event there are excess (unused) established Stewardship Credits when all of the included timber or other products has been cut and removed the Forest Service, at its option, shall either add more timber or other products or make cash payment for the unused credits.

G.9 EXCESS TIMBER OR OTHER PRODUCTS VALUE

In the event the value of the included timber or other products exceeds the total value of all of the mandatory activities plus the ordered optional activities, the Contractor shall make cash payment for the excess timber or other products value.

G.10 REFUND OF EXCESS CASH

If at any time the credit balance of the Stewardship Statement of Account exceeds the charges for timber or other products removed to date and for timber or other products that the Forest Service estimates will be cut within the next 60 calendar days, any portion of such excess from cash in the account shall be refunded if requested by Contractor. If no cutting is planned within the next 60 calendar days, refund of the entire unencumbered cash balance may be made. After a refund, deposits shall be made to meet the requirements of the clause entitled, “PRODUCT PAYMENT GUARANTEE” before additional timber or other products may be cut.

G.11 FINAL PAYMENT - RELEASE OF CLAIMS

The Government shall pay the amount due the Contractor under this contract after—

(1) Completion and acceptance of all work;

(2) Presentation of a properly executed voucher; and

(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release.

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H.1 POST AWARD CONFERENCE

A Post-Award conference with the successful offeror is required. It will be scheduled within 30 days of contract award. The meeting will be held at the LaGrande Ranger District Office, 3502 Highway 30, LaGrande, OR 97850, or other mutually agreed to location.

H.2 FAR 52.236-4 PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by visual observation.

(b) Additional informational material made available to contractors including but not limited to: environmental documentation, timber cruise data, timber removal report and appraisal, maps, access permits, etc.

H.3 AGAR 452.237-74 KEY PERSONNEL (FEB 1988)

(a) The Contractor shall assign to this contract the following key personnel:

Overall Project Manager Logging Supervisor – Supervising work in the timber removal specifications, and available to on the ground job site.

Road work Supervisor(s) – Supervising road maintenance work of Appendix C and/or construction/reconstruction road work of Appendix D.

Individual Sub-Managers – Individuals supervising individual sub-contracts for work items not covered by personnel noted previously herein.

(b) During the first 90 days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.

(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.

H.4 AGAR 452.236-72 USE OF PREMISES (NOV 1996)

(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, the Contractor shall obtain written permission from the Contracting Officer. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor.

(b) Unless excepted elsewhere in the contract, the Contractor shall (i) provide and maintain sanitation facilities for the work force at the site and (ii) dispose of solid waste in accordance with applicable Federal, State and local regulations.

H.5 SAFETY

Contractor’s Operations shall facilitate Forest Service’s safe and practical inspection of Contractor’s Operations and conduct of other official duties on Contract Area. Contractor has all responsibility for compliance with safety requirements for Contractor's employees. In the event that a conflict develops between the requirements of this contract or agreed upon methods of proceeding hereunder and State or Federal safety requirements, the contract shall be modified and Contractor may request an equitable adjustment.

Unless otherwise agreed in writing, when Contractor’s Operations are in progress adjacent to or on Forest Service controlled roads and trails open to public travel, Contractor shall furnish, install, and maintain all temporary traffic controls that provide the user with adequate warning of hazardous or potentially hazardous conditions associated with Contractor’s Operations. Contractor and Forest Service shall agree to a specific Traffic Control Plan for each individual project prior to commencing operations. Devices shall be appropriate to current conditions and shall be covered or removed when not needed. Except as otherwise agreed, flagmen and devices shall be as specified in the “Manual on Uniform Traffic Control Devices for Streets and Highways” (MUTCD) and as shown on Plans, Contract Area Map, Traffic Control Plan, or in specifications attached hereto.

Logging operations, thinning, slash treatments, and roadwork are inherently hazardous.

Conditions, which are inherently hazardous, that could lead to serious injury or loss of life include, but are not limited to:

1. Traffic hazards
5. Heavy equipment operations
a. Narrow gravel or native surface forest roads
a. Backing into objects
b. Long, steep grades (less than 20%)
b. Steep side slopes or soft ground for rollovers
c. Logging Traffic
c. Refueling hazards
d. Unskilled visitor traffic
d. Exceeding equipment limitations
e. Dusty conditions hindering visibility behind vehicles
e. Unsafe equipment / lack of safety equipment
2. Work environment
f. Operator fatigue
a. Inclement weather for potential hypo/hyperthermia
6. Truck Driving & Trailer Towing
b. High winds that can bring down trees
a. Increased stopping distance
c. Wet, snowy or ice conditions making ground unstable
b. Loads insecurely lashed

d. High db noise

e. Insects, plants, animals

f. Hazardous footing/terrain

3. Communications

a. Cell phone or radio availability for emergencies

4. Chainsaw operations

a. Improper safety equipment

b. Overhead/falling debris

c. Fatigue/improper cutting techniques

Contractor shall provide a job-specific safety plan, addressing mitigation of the hazards listed above and any other hazards known to the Contractor. The plan shall be presented at the post-award conference.

H.6 REQUIREMENTS OF RIGHTS-OF-WAY

Contractor’s road construction and use on rights-of-way shall be confined to said rights-of-way and limited by the related easements and stipulations, if any, unless Contractor makes other arrangements that will not infringe upon or adversely affect the grantee’s rights. Said easements or right-of-way documents are available in the offices of the Forest Supervisor and District Ranger.

H.7 USE OF ROADS BY CONTRACTOR

Contractor is authorized to maintain roads, bridges, and other transportation facilities, as needed for harvesting Included Timber or other products on National Forest and other lands where Forest Service has such authority. The location and clearing widths of all Temporary Roads or facilities shall be agreed to before construction is started. Contractor is authorized to cut and use for construction without charge construction timber or other products designated by agreement.

Except as provided herein, Contractor is authorized to use existing National Forest roads and Specified Roads, when such use will not cause damage to the roads or National Forest resources and when hauling can be done safely. If Contractor’s use of an existing temporary or National Forest system road cannot be satisfactorily accommodated without reconstruction, Contractor shall be authorized to use such road upon agreement as to the minimum reconstruction work that Contractor shall perform before hauling.

The road rules listed in the Wallowa-Whitman National Forest Commercial Road Rules, April 2012 are applicable to all commercial road users. This document is available online at the following address:

http://www.fs.usda.gov/Internet/FSE_DOCUMENTS/stelprdb5391223.pdf

The Contract Area Map shows existing temporary or permanent roads that for such reasons as limitations in structural capacity, safety, and protection of soil, water, and roads:

(a) Cannot be used for log hauling or

(b) May be used only under the restrictive limitations stated therein.

Contractor's use of existing roads identified on Contract Area Map by the following codes is prohibited or subject to restrictive limitations, unless agreed otherwise:

Code Use Limitations

XHauling prohibited
RHauling restricted
UUnsuitable for hauling prior to completion of agreed reconstruction
PUse prohibited
APublic use restriction
WRegulation waiver

Roads coded A will be signed by the Forest Service to inform the public of use restrictions. Contractor's use of roads coded R, A, or W shall be in accordance with the following restrictions:

Restricted Road List

Road

Termini
Map
Description of
Number
Road Name
From
To
Legend
Restrictions

All NF Roads

R
Hauling is restricted to roads listed in Appendix C.

All NF Roads

R
In order to protect water quality and prevent road damage, use is restricted to dry or frozen conditions and within the period July 1 to October 31.

All NF Roads

R
Hauling is prohibited on weekends and designated holidays dates for Memorial Day, Independence Day and Labor Day.

On roads listed in Appendix C that are not closed to public traffic at night, if contractor’s operations cause the traveled way or road shoulders to be constricted overnight, or longer, by such obstructions as decked logs, parked equipment, or piled slash, contractor shall place barricades on both sides of the encroaching obstruction to safely channel traffic around such obstructions. Barricades shall remain in place until the obstruction is removed. Barricades shall be Type II and meet specifications in MUTCD, Part VI. Barricades must be at least 3 feet high. Rails must be at least 2 feet long. Striping shall be alternating orange and white, sloping at a 45 degree angle, and reflectorized. Two rails, 8-12 inches in width, must face each direction. Barricades shall be equipped with warning lights which shall be Type A low intensity flashing and shall be maintained so as to be capable of being visible on a clear night from a distance of 3,000 feet.

H.8 ROAD MAINTENANCE

Contractor shall maintain roads, commensurate with Contractor’s use, in accordance with Road Maintenance Requirements and the Road Maintenance Specifications as described in Appendix C. Performance of road maintenance work by Contractor may be required prior to, during, or after each period of use. The timing of work accomplishment shall be based on Contractor’s Performance Schedule.

H.9 TRAFFIC CONTROL PLAN

Contractor shall provide a written traffic control plan prior to initiating any project activity. Contractor and Forest Service shall agree to a specific Traffic Control plan for each individual project prior to commencing operations. Unless otherwise agreed in writing, when Contractor’s Operations are in progress adjacent to or on Forest Service controlled roads and trails open to public travel, Contractor shall furnish, install, and maintain all temporary traffic controls that provide the user with adequate warning of hazardous or potentially hazardous conditions associated with Contractor’s Operations. Contractor and Forest Service shall agree to a specific Traffic Control plan for each individual project prior to commencing operations. Devices shall be appropriate to current conditions and shall be covered or removed when not needed. Except at otherwise agreed, flagmen and devices shall be as specified in the “Manual on Uniform Traffic Control Devices for Streets and Highways” (MUCD) and as shown on Plans, Contract Area Map, Traffic Control Plan or in specifications attached hereto.

H.10 USE BY OTHERS

Forest Service shall have the right to use any road constructed by Contractor under this contract for any and all purposes in connection with the protection and administration of the National Forest. Other parties, in connection with the logging of tributary National Forest timber, may use roads constructed by Contractor hereunder when such use will not materially interfere with Contractor’s Operations. Such third party use shall be contingent upon the third party paying a fair share of maintenance cost commensurate with such commercial use. Unless otherwise provided, Forest Service shall authorize other uses of roads constructed by Contractor hereunder only if:

(a)Forest Service makes appropriate arrangements to relieve Contractor of related maintenance costs commensurate with such other uses and
(b)Such other uses will not materially interfere with Contractor’s Operations.

Where Contractor reconstructs a road having established use, the use during reconstruction and thereafter by Contractor shall be such as to reasonably accommodate such established use. Contractor shall have the right to use such reconstructed road without material additional interference from other users.

H.11 CONFORMITY WITH DRAWINGS AND SPECIFICATIONS

Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is compliance with reasonable and customary manufacturing and construction tolerances.

H.12 SUBMITTALS, SHOP DRAWINGS, MATERIAL CERTIFICATIONS, AND TESTING REPORTS

MATERIAL CERTIFICATIONS AND TESTING REPORTS

The following material certifications and/or testing reports shall be submitted on this project:

Title
Referenced By Specification No.
Crushed aggregate gradations, certifications and test results
FP-03, Section 703.04
Limited Water Use License from State of Oregon, if non-commercial source
FSSS, Section 170.03

H.13 LOCAL MATERIAL SOURCES

(a) Designated Sources--Sources of local materials will be designated on the drawings. The Government assumes responsibility for the quality and quantity of material in the source. The Contractor shall determine the equipment and work required to produce the specified product.

The Contractor shall utilize all suitable material in the source. The designation of source will include the rights of the Contractor to use certain area(s) for plant site, stockpiles, and haul roads. Any Contractor royalty payment requirements will be stated below.

When materials are subject to weight measurement, the weight/volume relationship used for determination of designed quantities will be shown on the Drawings.

Should the designated source, due to causes beyond the control of the Contractor, contain insufficient suitable material, the Government will provide another source with an equitable adjustment in accordance with the Differing Site Conditions and Changes clauses.

(b) Contractor-Furnished Sources--When the material sources are not designated as provided above or the Contractor elects not to use designated sources, the Contractor shall be responsible for providing the specified product with no adjustment in contract price, unless weight/volume relationship differences between designated source material and Contractor-furnished source material result in financial disadvantage to the Government. Quality testing shall be the responsibility of the Contractor. Test results shall be furnished to the Contracting Officer.

H.14 SAMPLES, TESTS, CITED SPECIFICATIONS

Reference made in the contract to specifications, standards, or test methods adopted by AASHTO, ASTM, GSA, or other recognized National technical associations, shall mean specifications, standards, or test methods (including interim or tentative issues) which are in effect on the date of the solicitation.

H.15 AGAR 452.236-76 SAMPLES AND CERTIFICATES (FEB 1988)

When required by the specifications or the Contracting Officer, samples, certificates, and test data shall be submitted after award of the contract, prepaid, in time for proper action by the Contracting Officer or his/her designated representative. Certificates and test data shall be submitted in triplicate to show compliance of materials and construction specified in the contract performance requirements.

Samples shall be submitted in duplicate by the Contractor, except as otherwise specified, to show compliance with the contract requirements. Materials or equipment for which samples, certifications or test data are required shall not be used in the work until approved in writing by the Contracting Officer.

H.16 PROTECTION OF LAND SURVEY MONUMENTS

Forest Service shall appropriately designate on the ground all known survey monuments, section corners, and other corner accessories. Forest Service shall post identifying signs on two sides of each known bearing tree.

Forest Service shall arrange protective or perpetuative action that does not cause unnecessary delay to Contractor in authorized clearings, such as Clearcutting Units and road construction, and in other instances where damage to monuments, section corners, and other corner accessories is unavoidable.

Contractor shall protect all known survey monuments, witness corners, reference monuments, and bearing trees against avoidable destruction, obliteration, or damage during Contractor’s Operations. If any known monuments, corners, or accessories are destroyed, obliterated, or damaged by Contractor’s Operations, Contractor shall hire the appropriate county surveyor or a registered land surveyor to reestablish or restore at the same location the monuments, corners, or accessories at no additional cost to the Government. Such surveyors shall use procedures in accordance with the Bureau of Land Management “Manual of Instructions for the Survey of the Public Lands of the United States” for General Land Office surveys and in accordance with State law for others. Contractor shall record such survey in appropriate county records.

H.17 PROTECTION MEASURES NEEDED FOR PLANTS, ANIMALS, CULTURAL RESOURCES, AND CAVE RESOURCES

1. Areas, known by Forest Service prior to contract solicitation, needing special measures for the protection of plants, animals, cultural resources, and/or cave resources are shown on Contract Area Map and/or identified on the ground, and shall be treated as follows:

a. Unless agreed otherwise, wheeled or track laying equipment shall not be operated in areas identified as needing special measures except on roads, landings, tractor roads, or skid trails. Contractor may be required to backblade skid trails and other ground disturbed by Contractor’s Operations within such areas in lieu of cross ditching.

b. Unless agreed otherwise, trees will not be felled into areas identified as needing special measures.

c. Contractor shall conduct operations in a manner that does not damage or disturb identified areas. In the event that protective measures identified by the Forest Service are for any reason inadequate, Contracting Officer may delay or interrupt Contractor’s operations, under this Contract, and/or modify this Contract.

d. Contractor shall immediately notify the Forest Service if its operations disturb or damage any area identified as needing special protection, and shall immediately halt its operations in the vicinity of such area until the Forest Service authorizes continued operations. In the event that Contractor's operations disturb or damage an area identified as needing special protection, then Contractor shall reimburse the Forest Service for the full cost and expense of any evaluative and remedial measures undertaken by the Forest Service in connection with such disturbance or damage. Such payment shall not relieve Contractor from civil or criminal liability under applicable law.

2. Nothing contained in this clause shall establish, or be deemed to establish any express or implied warranty on the part of the Forest Service that the Forest Service has identified all areas within the Contract Area requiring special protection, or that measures prescribed by the Forest Service for protection of such areas are adequate.

3. Following contract solicitation, additional areas needing special measures for protection may be discovered or identified; protective measures may be revised or newly prescribed; and, additional species of plants and/or animals may be added to federal lists of protected species. In such event, Contracting Officer may delay or interrupt Contractor’s operations, under this Contract, and/or modify this Contract.

4. Discovery, by either the Contractor or the Forest Service, of additional areas, resources, species, or members of species needing special protection shall be promptly reported to the other party.

H.18 PROTECTION OF RESIDUAL TREES

Contractor's Operations shall not unnecessarily damage young growth or other trees to be reserved.

H.19 SANITATION AND SERVICING

Contractor shall take all reasonable precautions to prevent pollution of air, soil, and water by Contractor’s Operations. If facilities for employees are established on Contract Area, they shall be operated in a sanitary manner. In the event that Contractor’s Operations or servicing of equipment result in pollution to soil or water, Contractor shall conduct cleanup and restoration of the polluted site to the satisfaction of Forest Service.

Contractor shall maintain all equipment operating on Contract Area in good repair and free of abnormal leakage of lubricants, fuel, coolants, and hydraulic fluid. Contractor shall not service tractors, trucks, or other equipment on National Forest lands where servicing is likely to result in pollution to soil or water. Contractor shall furnish oil-absorbing mats for use under all stationary equipment or equipment being serviced to prevent leaking or spilled petroleum-based products from contaminating soil and water resources. Contractor shall remove from National Forest lands all contaminated soil, vegetation, debris, vehicle oil filters (drained of free-flowing oil), batteries, oily rags, and waste oil resulting from use, servicing, repair, or abandonment of equipment.

H.20 PREVENTION OF OIL SPILLS

If Contractor maintains storage facilities for oil or oil products on Contract Area, Contractor shall take appropriate preventive measures to ensure that any spill of such oil or oil products does not enter any stream or other waters of the United States or any of the individual States.

If the total oil or oil products storage exceeds 1,320 gallons in containers of 55 gallons or greater, Contractor shall prepare a Spill Prevention Control and Countermeasures Plan. Such plan shall meet applicable EPA requirements (40 CFR 112), including certification by a registered professional engineer.

Contractor shall notify Contracting Officer and appropriate agencies of all reportable (40 CFR 110) spills of oil or oil products on or in the vicinity of Contract Area that are caused by Contractor’s employees agents, contractors, Subcontractors, or their employees or agents, directly or indirectly, as a result of Contractor’s Operations. Contractor will take whatever initial action may be safely accomplished to contain all spills.

H.21 HAZARDOUS SUBSTANCES

Contractor shall notify the National Response Center and Contracting Officer of all releases of reportable quantities of hazardous substances on or in the vicinity of Contract Area that are caused by Contractor’s employees, agents, Subcontractors or their employees or agents, directly or indirectly, as a result of Contractor’s Operations, in accordance with 40 CFR 302.

H.22 EQUIPMENT CLEANING

In order to prevent the spread of noxious weeds into the Contract Area, Contractor shall be required to clean all off-road logging and construction equipment prior to entry on to the Contract Area. This cleaning shall remove all soil, plant parts, seeds, vegetative matter, or other debris that could contain or hold seeds. Only logging and construction equipment so cleaned and inspected by the Forest Service will be allowed to operate within the Contract Area. All subsequent move-ins of equipment to the Contract Area shall be treated in the same manner as the initial move in. "Off-road equipment" includes all logging and construction machinery, except for log trucks, chip vans, service vehicles, water trucks, pickup trucks, cars, and similar vehicles.

Contractor shall employ whatever cleaning methods are necessary to ensure that off-road equipment is free of noxious weeds. Equipment shall be considered free of soil, seed, and other such debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools is not required.

Unless otherwise agreed, Contractor shall give the forest service at least 24 hours notice when equipment is ready for inspection. Notification will include an agreed upon location where the equipment will be available for inspection by the forest service.

New infestations of noxious weeds, of concern to Forest Service and identified by either Contractor or Forest Service, on the Contract Area or on the haul route, shall be promptly reported to the other party. Contractor and Forest Service shall agree on treatment methods to reduce or stop the spread of noxious weeds when new infestations are found. A current list of noxious weeds of concern to Forest Service is available at each Forest Service office.

H.23 MOISTURE SENSITIVE SOILS

Contractors are cautioned that the roadway structure is designed so that the completed road will support highway legal loads during a limited use season. During periods of excessive moisture, native surfaced roads may not be able to support the loading applied to them by construction and logging equipment.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .