F. Product_Storage_Handling.pdf
PDF 25 KB Posted
- Attached to
- Ditch Creek and Ollokot Campground Well Drilling
- Solicitation number
- AG-04M3-S-09-0050
About this file
F. Product storage and handling
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1_change_setaside.rtf | RTF text file | |
| M. sf25a_Payment_Bond.pdf | ||
| B. AG-04M3-S-09-0050.rtf | RTF text file | |
| J. ollokot campground well drawings.pdf | ||
| I. DITCH TITLE SHEET | — | |
| H. Daily well drilling shift record.pdf | ||
| L. sf25_Performance_Bond.pdf | ||
| E. Quality_Control.pdf | ||
| C. Measuremnt and Payment.pdf | ||
| D. Submittal_Procedures.pdf | ||
| Return_This_Copy.rtf | RTF text file | |
| N. sf25b_Continuation_Sheet.pdf | ||
| G. Water_Supply_Well.pdf | ||
| K. Contract SITE PLAN DITCH CREEK.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
06/2009 Ditch Creek GS and Ollokot CG Wells 01660 - 1/1
Product Storage and Handling Requirements
SECTION 01660
PRODUCT STORAGE AND HANDLING REQUIREMENTS
PART 1 � GENERAL
1.01 SUMMARY
A. The Contractor shall be responsible for protecting all equipment and supplies intended for use in the project. The Contractor shall pay all costs related to such protection.
B. Equipment and supplies, approved by the CO and in storage, shall be installed in the same physical and mechanical condition as when approved by the CO.
PART 2 � PRODUCTS
Not Used
PART 3 � EXECUTION
Not Used
END OF SECTION
File details come from the government source that posted it. Updated .