E. Quality_Control.pdf

PDF 27 KB Posted

Attached to
Ditch Creek and Ollokot Campground Well Drilling
Solicitation number
AG-04M3-S-09-0050
Issued by

About this file

E. Quality Control

View the file

Other files

File Type Posted
Amendment_1_change_setaside.rtf RTF text file
M. sf25a_Payment_Bond.pdf PDF
B. AG-04M3-S-09-0050.rtf RTF text file
J. ollokot campground well drawings.pdf PDF
I. DITCH TITLE SHEET —
H. Daily well drilling shift record.pdf PDF
L. sf25_Performance_Bond.pdf PDF
C. Measuremnt and Payment.pdf PDF
D. Submittal_Procedures.pdf PDF
Return_This_Copy.rtf RTF text file
F. Product_Storage_Handling.pdf PDF
N. sf25b_Continuation_Sheet.pdf PDF
G. Water_Supply_Well.pdf PDF
K. Contract SITE PLAN DITCH CREEK.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

06/2009 Ditch Creek GS and Ollokot CG Wells 01450 - 1/1

Quality Control

SECTION 01450

QUALITY CONTROL

PART 1 � GENERAL

1.01 SUMMARY

A. Provide certification that the quality and quantity of construction conforms to the drawings, specifications, and requirements of the contract.

PART 2 � PRODUCTS

Not Used

PART 3 � EXECUTION

3.01 CERTIFICATION & MEASUREMENTS

A. Offsite-Produced Materials: Furnish certificates executed by the manufacturer supplier, or vendor, stipulating that all materials produced off site that are incorporated into the work meet the applicable requirements stated in the specifications. Make each certificate apply to a single commodity or invoice. Certify all incidental purchases needed to remedy minor shortages of material.

B. Quantity Measurements: Make all measurements for computation of quantities for all work items, except those specified for payment by design quantity or lump sum. Compute the quantities for periodic progress payments; the CO will compute the quantities for the final payment based on measurements taken. All Contractor measurements are subject to verification. Submit all field notes, calculation sheets, and other data used to determine quantities, and certify in writing as to the accuracy of the measurements and computations submitted

END OF SECTION