Amendment 2 SF-30 and revised scope of work to include details on the optional item Roadway Obliteration
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| b2.Amend2_SECTION J.docx | DOCX document | |
| c2.amend2_OR1_dvb.mht | MHT file | |
| d.OR1_dvb.mht | MHT file | |
| a.Amendment1.docx | DOCX document | |
| c.Amend1_SECTION J.docx | DOCX document | |
| b.Amend1_C6_drawing.pdf | ||
| g. Experience.Questionnaire.doc | DOC document | |
| b.AG-04KK-S-12-0008bidders_packet.docx | DOCX document | |
| c.snowpark specifications.docx | DOCX document | |
| d.Contract_Drawings.pdf | ||
| h. SF-24.pdf | ||
| i. SF-25.pdf | ||
| a.AG-04KK-S-12-0008.docx | DOCX document | |
| f.r6_fs_6300_52.doc | DOC document | |
| k. SF-25B.pdf | ||
| e.WageDeterminationOR1_dvb.mht | MHT file | |
| j. SF-25A.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| AG-04KK-S-12-0008 | Idlewild Snowpark and 2820 Road Reconstruction—Amendment 2 | Page 6 of 34 |
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| CONTRACT ID CODE |
| PAGE OF PAGES |
2 AMENDMENTXXXXXXXXXXX NO.
3. EFFECTIVE DATE
07/20/2012
| 4. REQUISITION/PUCHASE REQ. NO. |
| 5. PROJECT NO.(IF APPLICABLE) |
6. ISSUE BY CODE
7.ADMINISTERED BY (if other than item 6) CODE
Blue Mountain Acquisition Management Area Malheur National Forest PO Box 909 431 Patterson Bridge Road John Day, OR 97845
| 8.NAME AND ADDRESS OF CONTRACTOR(No., street, county, State and ZIP Code) |
| X |
| 9A.Amend Solicitation No. AG-04KK-S-12-0008 |
9B.Dated 07/06/2012
10A.Mod Contract/Order #
10B.Dated (see Item 13)
| code |
| facility code |
11. THIS ITEM APPLIES ONLY TO AMENDMENT OF SOLICITATION
[X] The above numbered solicitation is amended as set forth in the item 14. The hour and date specified for receipt of Offers [ ] is extended [X] is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15 and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegam or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. This change order is issued pursuant to; (specifiy authority) The changes set forth in item 14 are made in the Contract/Order # in item 10A.
B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) set forth in item 14, pursuant to the authority of FAR 43.103(b)..
C. This supplemental agreement is entered into pursuant to authority of:
D Other: (Specify type of modification and authority):
E. IMPORTANT: Contractor [ ] is not [ ] is required to sign this document and return _ Original to the issuing office.:
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible) Idlewild Campground Snowpark and 2820 Road Reconditioning Project, Malheur National Forest
1. Please replace the existing pages of the solicitation with the attached revised pages. This amendment clarifies the work associated with the optional item “Roadway Obliteration”. Changes are indicated by a vertical line in the left margin.
2. The Wage Determination has been updated and the revision as of 07/20/2012 hereby replaces the existing revision dated 07/06/2012 which was incorporated by Amendment 1. Please find the updated Section J of the solicitation and the updated wage determination attached separately.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A.NAME AND TITLE OF SIGNER (Type or print)
16A.NAME AND TITLE OF CONTRACTING OFFICER
15B.CONTRACTOR/OFFEROR
By ______________________________ (Signature of person authorized to sign)
| 15C.DATE SIGNED |
| 16B.UNITED STATES OF AMERICA |
(Signature of Contracting Officer)
16C.DATE SIGNED
Standard Form 30 Prescribed by GSA FAR (48CFR) 53.243
SECTION C - Description/specifications/Statement of Work
C-1 DESCRIPTION OF WORK
The purpose of this project is to reconstruct FS 2820 road and to construct a roadside pullout and snowpark parking lot. Project work includes excavation and embankment (see construction drawings for locations), asphalt placement at newly constructed snowpark (this contract), and the installation of a prefabricated concrete toilet. Other work is also required and can be found properly detailed in the construction drawings. Contractor is responsible for all incidental work and materials neccesary to provide this project furnished complete for government ownership.
The optional item “Roadway Obliteration” is consists of an area of approximately 750’ long with an average width of 20’. The roadway to be obliterated is the old entrance to the Idlewild Campground located on the east side of 395 about 0.5 miles south of Forest Road 2820. Reference the appropriate, separately attached specifications for further details.
C-2 PROJECT LOCATION
This project is located on the Emigrant Creek Ranger District of the Malheur National Forest, about 15 road miles northeast of Burns, Oregon. It can be accessed by travelling East from Burns on US 20 for approximately four miles, turning North onto US 395 and travel North-Northeast for about 12 miles to the junction with Forest Service Road 2820, turn onto 2820 and travel East for approximately 0.2 mile to the project area.
C-3 NOXIOUS WEED CONTROL
In order to prevent the potential spread of noxious weeds onto National Forest lands, the Contractor shall: furnish the Forest Service with proof of weed-free equipment.
All equipment and vehicles to be used at the job site shall be cleaned and certified free of noxious weeds and their seeds prior to entrance onto the National Forest. The restriction shall include equipment and vehicles intended for off-road use as well as on road use, whether they are owned, leased, or borrowed by the contractor or subcontractor.
Cleaning shall consist of the removal of all dirt, grease, debris, and materials that may harbor noxious weeds and their seeds. This may require the use of a pressure hose. Cleaning shall occur off Federal lands.
Equipment, materials, and vehicles shall be visually inspected by a designated Forest Service Officer, and certified in writing to be reasonably clean and weed free. Inspections will take place at a location designated by the Forest Officer in advance of equipment and material arrival. Equipment and vehicles shall proceed directly to the job site following the inspection. Materials to be used on the project shall be delivered to the project after inspection and approval.
Certification shall remain valid for each identified piece of equipment or vehicle only for the duration of the specified project and only as long as the vehicle or equipment remains at the job site. Equipment and vehicles (except passenger vehicles) that leave the job site shall be re-certified as weed free before they are allowed to return to the job site or re-enter the National Forest.
C-4 Applicable Specifications (Road Projects) Standard and Supplemental Specifications for FP-03 shown in the specification listing contained in the attachments are applicable to this contract. All specifications not included in the specification listing but referenced by listed specifications, are applicable. The Supplemental Specifications shown on the specification list are physically attached.
C-5 Estimated Contract Value The Government’s estimate for this project is between $100,000 and $250,000 for all items.
C-6 AGAR 452.211-72 Statement of Work/Specifications (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
C-7 AGAR 452.211-73 Attachments to Statements of Work/Specifications (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.