g.tspecs.doc

DOC document 66 KB Posted

Attached to
RECOVERY SUNDRY STEWARDSHIP, WALLOWA WHITMAN NATIONAL FOREST, OREGON
Solicitation number
AG-0489-S-10-9000
Issued by

About this file

G. T Specs

View the file

Other files

File Type Posted
AmendmentNo4.rtf RTF text file
Amendment4_Schedule.doc DOC document
Amendment3_Schedule.doc DOC document
AmendmentNo3.rtf RTF text file
Amendment2_Schedule.doc DOC document
AmendmentNo2.rtf RTF text file
Amendment1_AppendixBTables.docx DOCX document
AmendmentNo1.rtf RTF text file
i.SpecList.doc DOC document
k.ConstructionDwgs.pdf PDF
f.RMCodes.xls XLS spreadsheet
l.Fire.Prot.and.Suppression.r6_fs_6300_52 1 .doc DOC document
h.T-838_WB-6.pdf PDF
c.Appendix A-specs.docx DOCX document
b.z2 MapVicinity.pdf PDF
b.final_solicitation.doc DOC document
h.T-839_WB-12.pdf PDF
e.road_list.xls XLS spreadsheet
j.Specs.docx DOCX document
b.z3 MapNorth.pdf PDF
b.z4 MapSouth.pdf PDF
h.T-836_UD-1.pdf PDF
d.Appendix B.docx DOCX document
b.z1 Contract Map.pdf PDF
p.OR2_dvb.htm HTM file
h.T-834_CB-1.pdf PDF
h.T-839_EB-2.pdf PDF
o.77-0079_sca.htm HTM file
n.AdditionalFireCommunications.doc DOC document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sundry Stewardship, Appendix C

WALLOWA-WHITMAN

SPECIAL PROJECT SPECIFICATION (2/06)

T-831F DITCH MAINTENANCE

831.01 Description

This Section provides for routine maintenance of various types of ditches to provide a waterway which is unobstructed, as shown on the road listing or marked on the ground.

831.02 Maintenance Requirements

A. Maintain ditches by removing rock, soil, wood, and other materials. Maintained ditches shall function to meet the intent of the original design.

B. Undercutting backslopes during removal operations is not permitted.

C. Suitable material up to 100 mm (4 inches) in greatest dimension removed from the ditches may be blended into existing native road surface and shoulder or placed in designated berm.

D. Do not blend material from ditch cleaning operations into aggregate surfaced roads. Do not blade material across aggregate or bituminous surfaced roads, unless approved in writing by the Government.

E. Haul material in excess of 831.02 D or subject to 831.02 E to a designated waste area under Section T-832F. Remove excess materials temporarily stored on the ditch slope or edge of the shoulder daily.

F. Remove limbs and wood chunks in excess of 300 mm (12 inches) in length or 75 mm (3 inches) in diameter from ditches and place outside the roadway.

G. Clean paved surfaces of all materials resulting from ditch maintenance work.

H. Shape lead-off ditches to drain away from the traveled way.

WALLOWA-WHITMAN

SPECIAL PROJECT SPECIFICATION (2/06)

T-832F REMOVE AND END HAUL MATERIALS

832.01 Description

Work consists of loading, hauling, and placing of slide, slough, or excess materials such as rock, soil, vegetation, and other materials to designated disposal sites.

832.02 Maintenance Requirements

A. Remove, end haul, and dispose of excess materials generated by work under other Sections of this contract.

B. Remove the slide and slough materials in the area extending approximately 2 meters (6 feet) vertically above the road surface and not more than 1 meter (3 feet) downslope from the roadbed.

Disposal locations for material generated under this specification shall be staked on the ground by the Forest Service, unless otherwise shown below:

Disposal Site(s): _Contractor shall submit requested disposal site locations in writing to the Forest Service for approval.__

Material shall be placed by Method __1_, as listed in D.

Reshape the slope which generated the slide material as nearly as practical to its original condition by equipment operating from road surface. Reshaping of roadside ditches in slide area shall be in accordance with Section T-831F.

C. When approved by the Government, fill slumps by compacting selected materials into roadway depressions. Compaction is by Method 2.

D. Disposal methods are listed below:

1. Method 1 - Side Casting and End Dumping. Material may be placed by side casting and end dumping. Where materials include large rocks, provide a solid fill by working smaller pieces and fines into voids. Shape the finished surfaces to drain.

2. Method 2 Layer Placement - Step or roughen surfaces on which materials are to be placed prior to placing any material. Place materials in approximately horizontal layers no more than 300 mm (12 inches) thick. Compact each layer by operating hauling and spreading equipment over the full width of each layer.

E. Repair any damage to existing aggregate or pavement surfaces.

WALLOWA-WHITMAN

SPECIAL PROJECT SPECIFICATION (2/06)

T-834F DRAINAGE STRUCTURE MAINTENANCE

834.01 Description

This work consists of cleaning and reconditioning culverts and other drainage structures.

834.02 Maintenance Requirements

A. Clean drainage structures, inlet/outlet structures, culverts, catch basins, and outlet channels when there are obvious obstructions, impediments, or diversions to water flow. Material shall be removed from catch basins in accordance with

Drawing #CB-1. All removed material shall be disposed of in accordance with T-832F.

B. Clean the transition from the ditch line to the catch basin a distance of 3 meters (10 feet) from the catch basin. Clean outlet channels and lead-off ditches a distance of 2 meters (6 feet). Remove and place debris and vegetation so as to not enter the channel or ditch, or obstruct traffic. Haul debris and vegetation to a designated disposal area in accordance with Section T-832F.

C. Hydraulic flushing of drainage structures is not allowed unless approved in writing by the Forest Service.

D. Cleaning and reconditioning are limited to the first 1 meter (3 feet) of inlet and outlet, determined along the top of the structure. Recondition culvert inlet and outlet by field methods such as jacking out or cutting away damaged metal which obstructs flow. Treat cut edges with a zinc rich coating to reduce or eliminate rusting, in accordance with manufacturer’s recommendations.

E. Specific drainage maintenance requirements are shown on the Drainage Maintenance Listing (DML):

DML Attached

No DML Attached

X

* Performance of the maintenance shown the DML, unless specifically stated, does not relieve the contractor of the requirement to perform maintenance as shown in A, above.

WALLOWA-WHITMAN

SPECIAL PROJECT SPECIFICATION (3/08)

T-836F MAINTENANCE FOR LIMITED USE

836.01 Description

This work consists of making limited use roads passable for joint use by Contractor and high clearance vehicles, and providing drainage from the traveled way and roadbed.

836.02 Maintenance Requirements

A. Traveled Way

Contractor may smooth or fill existing cross ditches and waterbars and by agreement modify existing road junctions to enable vehicle access. Prior to beginning haul and resumption of haul after an extended stoppage:

1.

Remove brush, fallen trees, rocks, and other debris from traveled way, including turnouts, turnarounds, and other locations that interfere with needed maintenance as follows:

a.

No object extending over 100 mm (4 inches) above the road surface shall remain within the 3.6 m (12 feet) usable traveled way and 3 m (10 feet) turnout widths. Center the usable width on the roadbed or position away from the fill slope.

b.

Cut and remove standing or down trees, logs, brush, and limbs from within the area described in 1 (a) above. Remove encroaching limbs to a height of 4.2 m (14 feet) above the traveled way surface. Scatter material not meeting utilization standards outside and below the roadbed on the fill side. Limb and buck timber meeting utilization standards in accordance with contract provisions and deck at approved locations. Volume shall be estimated and documented prior to a written agreement for removal in accordance with contract provisions.

c.

Place all removed materials away from drainage’s.

d.

During use, maintain drainage structures, including dips, ditches and culverts in a useable condition.

2.

Clean and recondition drainage facilities in accordance with: Section T-831F and T-834F.

B. Slough and Slides

Slough and slides may be left in place, provided surface drainage is provided and at least 3.6 m (12 feet) of width is available for vehicle passage.

Contractor may reposition or ramp over slides and slough when the traveled way is less than 3.6 m (12 feet) providing the material is capable of supporting vehicles. Limit outslope to no more than six percent.

3.

Reposition slough or slide materials on the roadbed which are not capable of supporting a vehicle to provide the 3.6 m (12 feet) width. When directed by Forest Service, slough or slide material will be removed under Section T-832F.

C. Slumps and Washouts

Drain the roadbed immediately upgrade of slumps and longitudinal cracks to prevent water from entering slump area.

Slumps and longitudinal cracks at the edge of the roadbed shall not be considered a part of the usable width. Usable width may be reduced to 3 m (10 feet) in the area of the slump.

Unless Forest Service agrees to material being placed on slumps, ramp the slumps on both ends into undisturbed roadbed to provide at least 3 m (10 feet) usable width. Use removed materials to guide vehicles to the ramp location or to aid in draining the area.

4.

Washouts may be filled with suitable material.

D.

Posthaul

At the end of hauling or prior to entering into seasonal shutdowns or a period of extended inactivity:

Shape the traveled way and disturbed roadbed to provide functional drainage.

Reinstall removed cross ditches and waterbars and provide any additional drainage structures necessary to offset changes caused through use and maintenance. Reference drawing(s) as indicated in C(T) 5.31#.

3. Leave roads useable for high clearance vehicles. Remove or reshape Contractor modifications at road junctions to leave the entrance as it was before use, or as agreed at the time of improvement.

WALLOWA-WHITMAN

SPECIAL PROJECT SPECIFICATION (3/08)

T-838F MAINTENANCE FOR HIGH CLEARANCE VEHICLE USE

838.01 Description

This work consists of making limited use roads passable for PROJECT use by Contractor and providing drainage from the traveled way and roadbed.

838.02 Maintenance Requirements

A. Traveled Way

Contractor may smooth or fill existing cross ditches and waterbars and by agreement modify existing road junction to enable vehicle access. Prior to beginning haul and resumption of haul after an extended stoppage:

Remove brush, fallen trees, rocks, and other debris from traveled way, including turnouts, turnarounds, and other locations that interfere with needed maintenance as follows:

No object extending over 100 mm (4 inches) above the road surface shall remain within the 3.6 m (12 feet) usable traveled way. Center the usable width on the roadbed or position away from the fill slope.

Cut and remove standing or down trees, logs, brush, and limbs from within the area described in 1(a). Remove encroaching limbs to a height of 4.2 m (14 feet) above the traveled way surface. Scatter material not meeting utilization standards outside and below the roadbed on the fill side. Limb and buck timber meeting utilization standards in accordance with contract provisions and deck at approved locations. Volume shall be estimated and documented prior to a written agreement for removal in accordance with contract provisions.

c.

Place all removed materials away from drainages.

d.

During use, maintain drainage structures including dips, ditches and culverts in a usable condition.

Clean and recondition drainage facilities in accordance with Section T-831F and T-834F.

B. Slough and Slides

Slough and slides may be left in place, provided surface drainage is provided and at least 3.6 m (12 feet) of width is available for vehicle passage.

Contractor may reposition or ramp over slides and slough when the traveled way is less than 3.6 m (12 feet) providing the material is capable of supporting vehicles. Limit outslope to no more than six percent.

Reposition slough or slide materials, which are not capable of supporting a vehicle, on the roadbed to provide the 3.6 m (12 feet) width. When directed by Forest Service, slough or slide material will be removed under Section T-832F.

C. Slumps and Washouts

Drain the roadbed immediately upgrade of slumps and longitudinal cracks to prevent water from entering slump area.

Slumps and longitudinal cracks at the edge of the roadbed shall not be considered a part of the usable width. Usable width may be reduced to 3 m (10 feet) in the area of the slump.

Unless Forest Service agrees to material being placed on slumps, ramp the slumps on both ends into undisturbed roadbed to provide at least 3 m (10 feet) usable width. Use removed materials to guide vehicles to the ramp location or to aid in draining the area.

Washouts may be filled with suitable material.

D.

Posthaul

At the end of hauling or prior to entering into seasonal shutdowns or a period of extended inactivity:

Shape the traveled way and disturbed roadbed to provide functional drainage.

Reinstall removed cross ditches and waterbars and provide any additional drainage structures necessary to offset changes caused through use and maintenance. See attached drawings, as specified in C(T) 5.31#.

Leave roads useable for high clearance vehicles. Remove or reshape Contractor modifications at road junctions to leave the entrance as it was before use, or as agreed at the time of improvement.

WALLOWA-WHITMAN

SPECIAL PROJECT SPECIFICATIONS (3/08)

T-839F MAINTENANCE FOR PROJECT USE

839.01 Description

Work consists of providing minimum access to Maintenance Level 1 (closed) roads required for Contractor's Operations and preventing unacceptable resource or road damage.

839.02 Maintenance Requirements

A.

Contractor is authorized to perform the following maintenance to provide vehicle passage and drainage:

Removing log, earth, and rock barriers and/or improving existing road junctions to enable vehicle access as mutually agreed.

Smoothing or filling existing cross ditches and waterbars.

Installing Contractor-furnished culverts or other agreed temporary drainage structures for shallow stream crossings.

Removing brush, fallen trees, rocks, and other materials from the traveled way and other locations that interfere with needed maintenance:

Place all removed materials away from drainage’s.

Limb and buck timber meeting utilization standards in accordance with contract provisions and deck at approved locations. Volume shall be estimated and documented prior to a written agreement for removal in accordance with contract provisions. Scatter other woody materials, including limbs, off of and below the roadbed without creating concentrations.

5.

Clean and recondition drainage structures in accordance with Section T-831F and Section T-834F.

6.

Reposition or ramp over slough and slides to provide adequate width of traveled way material.

7.

Provide traveled way drainage above slumps and seal cracks in slump area. Unless Forest Service agrees to material being placed on slumps, ramp the slumps on both ends into undisturbed roadbed to provide usable width.

B.

During use, the traveled way shall not channel water along the road. Prior to seasonal periods of anticipated rains and runoff, additionally perform the following work:

Shape the traveled way and roadbed to drain.

Reinstall removed cross ditches and waterbars and provide any additional drainage structures necessary to offset changes through use and maintenance.

Perform work outlined in 839.02 A (5), (6), and (7).

During periods of non use, replace original barrier or provide and maintain standard MUTCD, Type 3, barricades unless alternate type barriers are approved.

839.03 Post Haul Requirements

This work consists of providing post haul drainage on roads.

A. Drainage

1. Upon completion of work, shape the roadway to provide for the removal of surface water. The roadway need not be passable to vehicles. Reinstall or repair waterbars, cross-drains, outlet ditches, or berms existing prior to the Contractor's operation and/or construct additional devices as staked on the ground. Areas where water is ponded by existing centerline profile sags in through cuts may be left untreated. The following methods are acceptable for treatment of the traveled way:

(a) Method A: Outsloping the roadbed at not less than 13 mm (½ inch) per meter (yard) of width.

(b) Method B: Insloping the roadbed at not less than 13 mm (½ inch) per meter (yard) of width.

2. Unless otherwise approved by the Forest Service, water bars shall be installed in accordance with the drawings specified in C(T) 5.31#.

3. Continuous blade shaping of the roadbed is not required under this specification.

4. Drainage structures located in through fills and natural watercourses shall be fully functional without obstructions, including inlet and outlet channel within 6 meters (20 feet) of the structure.

5. Clean culverts and other fabricated structures to provide drainage from road ditches and make the ditch functional. Remove all Contractor-installed temporary drainage structures and reshape drainage to original contours. Removed structures shall become Contractor's property to be removed from Government land.

B. Slides, Slumps and Slough

1. Slides and slough may be left in place, provided they do not impound water or divert water from watercourses. As necessary, reshape the various surfaces to provide drainage.

2. Provide drainage to effectively decrease or eliminate the entry of surface water into slides, slumps, and roadbed surface cracks. Place berms, waterbars or ditches as needed to intercept and remove runoff water from the roadbed. Surface seal cracks by covering over with native soil materials to prevent additional water entry and compact with equipment tires.

C. Entrance Devices Upon completion of work, construct or replace entrance devices to effectively eliminate access by motorized vehicles.

Construct entrance device in accordance with the drawings indicated on the Road Listing C(T)5.31#.

D. Seeding When required in C(T)5.31#, seed and fertilize all disturbed areas in accordance with requirements set forth in Section T-841F.

WALLOWA-WHITMAN

SPECIAL PROJECT SPECIFICATION (2/06)

T-854F TREATMENT AND DISPOSAL OF DANGER TREES

854.01 Description

This work consists of felling and disposal of designated live or dead danger trees sufficiently tall to reach roads used (including temporary roads) by the Contractor. Any removal of logs is subject to prior agreement between the Forest Service and the Contractor.

Road use for Contractor’s operations and haul is contingent upon the required treatment of all danger trees regardless of when identified or marked for treatment.

854.02 Requirements

A. Designation of danger trees.

Danger trees to be felled will be designated in advance of commercial operations commencing. Identification of these trees may be made by the Contractor and/or the Forest Service. Marking of the designated trees shall be conducted by the Forest Service.

B. Falling, bucking and treatment for disposal.

Use controlled felling to ensure the direction of fall and prevent damage to property, structures, roadway, residual trees, and traffic. Stump heights, measured on the side adjacent to the highest ground, must not exceed 12 inches or 1/3 of the stump diameter, whichever is greater. Higher stump heights are permitted when necessary for safety.

Felled snags and trees, which are not designated for removal, will be left in a stable condition such that they will not roll or slide. Position logs away from standing trees so they will not roll, are not on top of one another, and are located out of roadway and drainage structures.

Fell, limb and, remove trees, which are Marked for removal, that equal or exceed the utilization standards as listed in the Timber Sale contract or Special Project Specifications. Dispose of merchantable timber designated for removal in accordance with B/BT2.32 Construction Clearing, of the Timber Sale Contract, or as described in Special Project Specifications.

C. Slash treatment.

Within the roadway, remove limbs, chunks, and debris in excess of 12 inches in length and 3 inches in diameter, and concentrations that may plug ditches or culverts, and water courses.

Dispose of slash by scattering outside the roadway limits without damaging trees, or improvements.

WALLOWA-WHITMAN

SPECIAL PROJECT SPECIFICATION (2/06)

T-891F WATER SUPPLY AND WATERING

891.01 Description

This work consists of providing facilities to furnish an adequate water supply, hauling and applying water.

891.02 Materials

If the Contractor elects to provide water from other than designated sources, the Contractor is responsible to obtain the right to use the water, including any cost for royalties involved.

Suitable and adequate water sources designated available for Contractor's use under this contract are as follows:

Map Location Location Use

Key No. Road Milepost Restrictions

No water sources are available on Forest Service Lands.

Water shall be obtained from a commercial source.

891.03 Equipment

A. Positive control of water application is required. Equipment shall provide uniform application of water without ponding or washing.

B. An air gap or positive anti-siphon device shall be provided between the water source and the vehicle being loaded if the vehicle has been used for other than water haul, if the source is a domestic potable water supply, or the water is used for tank mixing with any other materials.

C. The designated water sources may require some work prior to their use. Such work may include cleaning ponded areas, installing temporary weirs or sandbags, pipe repair, pump installation, or other items appropriate to the Contractor's operations. Flowing streams may be temporarily sandbagged or a weir placed to pond water, provided a minimum flow of ______ cu.m/s (cu. ft/sec) is maintained. Obtain approval on improvements for sandbags or weirs prior to placement.