Amendment4_Schedule.doc

DOC document 212 KB Posted

Attached to
RECOVERY SUNDRY STEWARDSHIP, WALLOWA WHITMAN NATIONAL FOREST, OREGON
Solicitation number
AG-0489-S-10-9000
Issued by

About this file

B. Amendment 4 schedule

View the file

Other files

File Type Posted
AmendmentNo4.rtf RTF text file
Amendment3_Schedule.doc DOC document
AmendmentNo3.rtf RTF text file
Amendment2_Schedule.doc DOC document
AmendmentNo2.rtf RTF text file
Amendment1_AppendixBTables.docx DOCX document
AmendmentNo1.rtf RTF text file
i.SpecList.doc DOC document
k.ConstructionDwgs.pdf PDF
f.RMCodes.xls XLS spreadsheet
l.Fire.Prot.and.Suppression.r6_fs_6300_52 1 .doc DOC document
h.T-838_WB-6.pdf PDF
c.Appendix A-specs.docx DOCX document
b.z2 MapVicinity.pdf PDF
g.tspecs.doc DOC document
b.final_solicitation.doc DOC document
h.T-839_WB-12.pdf PDF
e.road_list.xls XLS spreadsheet
j.Specs.docx DOCX document
b.z3 MapNorth.pdf PDF
b.z4 MapSouth.pdf PDF
h.T-836_UD-1.pdf PDF
d.Appendix B.docx DOCX document
b.z1 Contract Map.pdf PDF
p.OR2_dvb.htm HTM file
h.T-834_CB-1.pdf PDF
h.T-839_EB-2.pdf PDF
o.77-0079_sca.htm HTM file
n.AdditionalFireCommunications.doc DOC document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 4

PART I – THE SCHEDULE

SECTION B – SERVICES AND PRICES

Whitman Ranger District

Wallowa-Whitman National Forest

Baker County

B.1

SCHEDULE OF ITEMS :

NOTE: Price Proposals MUST be provided on ALL Items in Schedules B-1, Base and Option Work Activities and B-2, Timber Removal Price Schedule.

SUMMARY SCHEDULE OF ITEMS – Complete item pricing on following Schedule B pages.

ITEM NO.
MANDATORY WORK ACTIVITY DESCRIPTION
1.0
Thinning

2.0

2.0a 2.0b Slash Treatment

Hand Piling

Machine Piling

3.0
Erosion Control Seeding

4.0

Installation of erosion control structures

5.0
Road Maintenance
6.0
Road Reconstruction
ITEM NO.
OPTIONAL WORK ACTIVITY DESCRIPTION

7.0

8.0

8.0a 8.0b Thinning

Slash Treatment

Hand Piling

Machine Piling

THE CONTRACTOR IS HEREBY NOTIFIED OF REPORTING REQUIREMENTS PER CLAUSES INCLUDED IN THIS REQUEST FOR PROPOSALS UNDER THE 2009 AMERICAN RECOVERY AND REINVESTMENT ACT. SEE FAR CLAUSES 52.204-11, 52.203-15, 52.225-21, AND 52.225-22. THESE CLAUSES PERTAIN TO ALL OF THE FOREST SERVICE SERVICE AND ROAD RECONSTRUCTION WORK INCLUDED IN THIS REQUEST FOR PROPOSALS.

SECTION B - SERVICES AND PRICES

B.1

SCHEDULE OF ITEMS

REQUIRED ITEMS

ITEM NO.
DESCRIPTION
UNIT
Estimated Quantity
UNIT PRICE
TOTAL

US Forest Service

1.0
Thinning

Unit 15

Unit 22

Unit 22A

Unit 22E Unit 24B Unit 24C Unit 25B Unit N9

Unit N10

Unit N11-1

Unit N11-2 Unit N14-1

Unit N14-2 Unit N14-3

Unit N12

Unit N18

Unit N19 Unit N20

Unit N74

Unit N79

Unit N110-1

Unit N110-2

Unit N110-3

Unit N114-1

Unit N114-2

Unit A-1

Unit A-2

Unit A-5

Unit A12

Unit B12

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

0.6

1.3

0.6

0.9

2.0
Slash Treatment

2a. Hand Piling

Unit N11-2

Unit N18

Unit N20

Unit N110-1

Unit N110-3

Unit N114-2

2b. Machine Piling

Unit 24C

Unit N9

Unit N10 Unit N11-1

Unit N14-1

Unit N19

Unit N74

Unit N110-2

Unit N114-1

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

3.0.

4.0 Erosion Control Seeding

Installation of erosion control structures (skid trails/skyline corridors – only)

AC

AC

76.5

5.0

Road Maintenance

a. Maintenance for limited use*

b. Hazard Tree Removal Miles Miles

11.5 23.5

6.0
Road Reconstruction**
Miles
2.69
$ .
$ .

*Includes logging out & minor brushing, ditch maintenance, drainage structure maintenance, shaping traveled way, prehaul, seasonal and post haul maintenance. Suitable for high clearance public traffic.

**See detailed pricing USDI Bureau of Land Management – No mandatory service work

OPTIONAL ITEMS

ITEM NO.
DESCRIPTION
UNIT
Estimated Quantity
UNIT PRICE
TOTAL

US Forest Service

7.0
Thinning

Unit 16

Unit 17

Unit 20

Unit 21

Unit 22B

Unit 22C

Unit 22D

Unit 22F

Unit 23

Unit 24A

Unit 25A

Unit 26A

Unit 26B

Unit 26C

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

8.0
Slash Treatment

8a. Hand Piling

8b. Machine Piling

Unit 16

Unit 17

Unit 23

Unit 24A

Unit 26A

AC

AC

AC

AC

AC

USDI Bureau of Land Management

7.0
Thinning – Unit 19
AC
10
$ .
$ .

TOTAL ALL ITEMS

B.2

TIMBER REMOVAL PRICE SCHEDULE:

REQUIRED

USFS Skyline Units

SPECIES
PRODUCT
QUANTITY
UNIT OF MEASURE
MINIMUM ACCEPTABLE OFFER
OFFER

(FLAT)

TOTAL OFFER

PP
SAW
394
CCF
$1.00
$________
$________
DF/WL
SAW
464
CCF
$9.99
$________
$________
WF/Other
SAW
7
CCF
$3.00
$________
$________

USFS Tractor Units

SPECIES
PRODUCT
QUANTITY
UNIT OF MEASURE
MINIMUM ACCEPTABLE OFFER
OFFER

(FLAT)

TOTAL OFFER

PP
SAW
3601
CCF
$1.00
$________
$________
DF/WL
SAW
1827
CCF
$9.99
$________
$________
WF
SAW
7
CCF
$3.00
$________
$________

BLM Tractor (19 ac)/Skyline (1ac) Units OPTIONAL

SPECIES
PRODUCT
QUANTITY
UNIT OF MEASURE
MINIMUM ACCEPTABLE OFFER
OFFER

(FLAT)

TOTAL OFFER

PP
SAW
232
CCF
$1.00
$________
$________
DF/WL
SAW
2
CCF
$9.99
$________
$________
WF
SAW
0
CCF
$3.00
$________
$________

REQUIRED BIOMASS/NONSAW REMOVAL

Units
PRODUCT
QUANTITY
UNIT OF MEASURE
MINIMUM ACCEPTABLE OFFER
OFFER

(FLAT)

TOTAL OFFER

ALL USFS (Top wood only)
BIOMASS/NONSAW
895
CCF
$0.25
$________
$________
USFS UNITS 20, 22C, 22F, and 25A **
BIOMASS/NONSAW
234
CCF
$0.25
$________
$________
BLM 12/18
BIOMASS/NONSAW
24
CCF
$0.25
$________
$________
TOTAL
BIOMASS/NONSAW
1153

** 4.0 -6.9 in. DBH fiber removal and juniper removal 4.0 – 20.9 in. DBH. Top wood is not included in this estimate.

See Timber Removal Project Terms and Specifications in Appendix B.

NOTE: THESE SCHEDULES ARE FOR PRICING/PAYMENT PURPOSES. SEE SECTION L FOR BUSINESS PROPOSAL REQUIREMENTS.

The following construction items are estimated between $20,000 and $50,000 Detailed Pricing for Item No. 6 - Schedule of Items

Sundry Stewardship -

RD 1125

Item Number
Description
RC
Pay Unit
Estimated Quantity
Unit Price
Total Price
15101
MOBILIZATION
1
Lump Sum
ALL
$
$
15950
RECONSTRUCTION STAKING
1
Mile
1.45
$
$
23050
ROADSIDE BRUSHING
1
Mile
1.45
$
$
30326
ROAD RECONDITIONING, COMPACTION METHOD B
1
Mile
1.45
$
$

RD 1125205

Item Number
Description
RC
Pay Unit
Estimated Quantity
Unit Price
Total Price
15950
RECONSTRUCTION STAKING
1
Mile
0.18
$
$
20420A
DRAINAGE EXCAVATION, TYPE DRAIN DIP
3
Each
1
$
$
20420B
DRAINAGE EXCAVATION, TYPE DRAIN DIP with BORROW
3
Each
1
$
$
20420C
DRAINAGE EXCAVATION, TYPE UTAH DIP
3
Each
1
$
$
24901
COMPOSITE ROAD CONSTRUCTION
1
Mile
0.18
$
$
30122
PIT-RUN AGGREGATE, MAXIMUM SIZE 6", COMPACTION A
2
Cubic Yards
30
$
$
65101
PIT DEVELOPMENT
2
Each
1
$
$

RD 1125208

Item Number
Description
RC
Pay Unit
Estimated Quantity
Unit Price
Total Price
15950
RECONSTRUCTION STAKING
1
Mile
0.5
$
$
24901
COMPOSITE ROAD CONSTRUCTION
1
Mile
0.5
$
$

RD 1125400

Item Number
Description
RC
Pay Unit
Estimated Quantity
Unit Price
Total Price
15950
RECONSTRUCTION STAKING
1
Mile
0.2
$
$
24901
COMPOSITE ROAD CONSTRUCTION
1
Mile
0.2
$
$

RD 1125420

Item Number
Description
RC
Pay Unit
Estimated Quantity
Unit Price
Total Price
15950
RECONSTRUCTION STAKING
1
Mile
0.3
$
$
24901
COMPOSITE ROAD CONSTRUCTION
1
Mile
0.3
$
$

RD 1135275

Item Number
Description
RC
Pay Unit
Estimated Quantity
Unit Price
Total Price
20302
REMOVAL OF EARTHEN BARRICADE
1
EACH
1
$
$

RD 1135276

Item Number
Description
RC
Pay Unit
Estimated Quantity
Unit Price
Total Price
15950
RECONSTRUCTION STAKING
1
Mile
0.04
$
$
20301
REMOVAL OF LOG CULVERT DEBRIS
3
LS
ALL
$
$
25101
PLACED RIPRAP, CLASS 3
3
CY
8
$
$
25110
HAND-PLACED RIPRAP, CLASS 3
3
CY
2
$
$
60236
36" PIPE CULVERT
3
LF
40
$
$
65101
PIT AND QUARRY DEVELOPMENT
2
EA
1
$
$

B.3

LAND MANAGEMENT ACTIVITIES.

Performance of land management activities shall be in accordance with Section C – Project Description and Work Specifications. Payment for Land Management Work Activities in Schedule B-1, will be made in Stewardship Credits in lieu of cash, as defined in Section G. All Base Work Activities shall be performed. Option activities are listed in order of planned priority. Award may be made for option items in any order that the Contracting Officer determines is in the best interest of the Government.