F. Road Maintenace Codes

View the file

Other files

File Type Posted
AmendmentNo4.rtf RTF text file
Amendment4_Schedule.doc DOC document
Amendment3_Schedule.doc DOC document
AmendmentNo3.rtf RTF text file
Amendment2_Schedule.doc DOC document
AmendmentNo2.rtf RTF text file
Amendment1_AppendixBTables.docx DOCX document
AmendmentNo1.rtf RTF text file
i.SpecList.doc DOC document
k.ConstructionDwgs.pdf PDF
l.Fire.Prot.and.Suppression.r6_fs_6300_52 1 .doc DOC document
h.T-838_WB-6.pdf PDF
c.Appendix A-specs.docx DOCX document
b.z2 MapVicinity.pdf PDF
g.tspecs.doc DOC document
b.final_solicitation.doc DOC document
h.T-839_WB-12.pdf PDF
e.road_list.xls XLS spreadsheet
j.Specs.docx DOCX document
b.z3 MapNorth.pdf PDF
b.z4 MapSouth.pdf PDF
h.T-836_UD-1.pdf PDF
d.Appendix B.docx DOCX document
b.z1 Contract Map.pdf PDF
p.OR2_dvb.htm HTM file
h.T-834_CB-1.pdf PDF
h.T-839_EB-2.pdf PDF
o.77-0079_sca.htm HTM file
n.AdditionalFireCommunications.doc DOC document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Road Maintenance Requirements Specification Codes Table Pursuant to
Road Maintenance Chart - 2006
Item N0.TitleEntryExplanation
AnyAnyBlankExcept as otherwise described, no entry indicates contractor is not authourized or required to perform the work item(s).
AnyAnyP1,P2,P3Denotes maintenance contractor is responsibility to perform as, Prehaul (P1), recurring (P2), or posthaul (P3).
AnyAnyPDenotes contractor is required to perform work for all periods, Prehaul, Recurring and Posthaul
AnyAnyIBRIncluded By Reference
AnySPSNumberEntry indicates applicable special Project Specification
AnyDrawingNumberEntry indicates applicable drawing.
1T-803F Snow RemovalTSSnowplowing authorized for contractor's operations without recreation access being provided per Section T-803 requirements.
JUSnowplowing authorized, but must provide for recreation joint use per Section T-803F requirements.
BlankSnowplowing is not authorized. Forest Service may authorize plowing by permit when not in conflict with other uses.
2T-811F Blading
2a.Numbers or EXContractor shall maintain the traveled way to the width indicated by the entry, plus curve widening in accordance with section T-811For to the full width existing (EX).
2b.A or BCompaction method required (per T- 811F)
2c.IS, C, OS, F, AICross slopes are designated as: IS (insloped), C (crowned), OS (outsloped), F (flat), AI (as is).
3T-812F Dust Abatement
3a. ProductWater, LIG S, MG CL2,Product listed is required for use. Include application rate and width if selected.
OptThe use of LIG S or MG CL2 is contractor's choice. Include application rate and width.
AllAny method may be used, see T-812F, section 812.03 Materials. If contractor uses LIG S, or MG CL2, the application rate and width shall be agreed to in writing prior to applying.
3b. Application RateNumberThis is the application rate the contractor shall apply. Generally this is accomplished using 2 applications at 1/2 the concentration shown on the table to obtain the listed application rate.
3c. WidthNumber, AsNdcontractor shall abate dust to the specific width as stated (number) or to an as needed width that effectively abates dust pursuant to the contractor's operations (AsNd)
4T-813F SurfacingGFM, P #, D, D3(GFM) Government Furnished Material, (P1,P2 or P3) contractor required to place surface obtained from a commercial source. (D) contractor required to pay deposits to FS. (D3) contractor required to pay deposits to a third party.
4a. QuantityNumberQuantity in cubic yards of surfacing to be placed. Areas to receive surfacing shall be staked in advance by the Forest Service.
4b. GradationFill inRequired Gradation. Review the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03, US Custormary Units, Section 703.05 for gradation requirements. No entry denote GFM material.
4c. CompactionA or BCompaction method required (per T-813F)
5T-831F Ditch MaintenanceIBR, P, P1, P2, P3(IBR) Included by reference (T-836, T-838, T-839). Perform as specified. P, P1,P2 or P3 for (T-811)
6T-832F Remove and End Haul MaterialsIBR, P, P1, P2, P3(IBR) Included by reference (T-836, T-838, T-839). Perform as specified. P, P1,P2 or P3 for (T-811)
7T-834F Drainage Structure MaintenanceIBR, P, P1, P2, P3(IBR) Included by reference (T-836, T-838, T-839). Perform as specified. P, P1,P2 or P3 for (T-811)
8T-836F Maintenance for Limited UseUse this Specification for ML2 roads that must be maintained for high clearance public use during contractor's operations.
9T-838 Maintenance for High Clearance Vehicle UseUse this Specification for ML2 roads that may be close to public traffic during contractor's operations and open to high clearance vehicles during periods of non-use.
10T-839F Maintenance for Project useUse this Specification for ML1 roads that must be closed during periods of non-use. These roads are only for contractor's use. No public use allowed.
11T-841F Vegetation EstablishmentInclude when required, P3
11a. Seeding AreaInclude when required, P3
** Special Requirements
12T-854F Treatment of Danger TreesInclude for all roads P1, P2 & P3
13T-861F Maintenance of Cattleguards
14T-891F WateringIf applicable for a road, include P, P1, P2 & P3 or IBR. Dust abatement (All) includes water.

Sheet2

Sheet3

File details come from the government source that posted it. Updated .