DB_Wage_Determination.docx
DOCX document 19 KB Posted
- Solicitation number
- AG-02RC-S-11-0062
About this file
Wage Determination-Davis Bacon
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend_3.docx | DOCX document | |
| Sheet5_PACE_ AHU.pdf | ||
| Amend_2.docx | DOCX document | |
| Sheet2_PUL6438s.pdf | ||
| Sheet4_FanCoil.pdf | ||
| Sheet6_YaskawaVFD.pdf | ||
| Sheet3_WebsAX.pdf | ||
| Sheet1_Web600.pdf | ||
| Amend_1_WageDeterm.docx | DOCX document | |
| Amend_1.docx | DOCX document | |
| SPS.pdf | ||
| Sol_Pkg_AG-02RC-S-11-0062.docx | DOCX document | |
| DrawingsHVAC.pdf | ||
| OwnerPastPerformanceSurvey.docx | DOCX document | |
| SF24BidBondFillForm.pdf | ||
| IdahoWCI.doc | DOC document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: ID100001 05/06/2011 ID1
Superseded General Decision Number: ID20080001
State: Idaho
Construction Type: Building
Counties: Benewah, Bonner, Boundary, Clearwater, Idaho, Kootenai, Latah, Lewis, Nez Perce and Shoshone Counties in Idaho.
* IDAHO COUNTY - North OF THE 46TH PARALLEL BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Modification Number Publication Date 0 03/12/2010 1 03/19/2010 2 04/16/2010 3 07/16/2010 4 10/08/2010 5 11/12/2010 6 11/26/2010 7 12/03/2010 8 03/11/2011 9 04/15/2011 10 04/29/2011 11 05/06/2011
BOIL0242-006 01/01/2011
BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO (NORTH OF THE 46TH
PARALLEL), KOOTENAI, LATAH, LEWIS, NEZ PERCE AND SHOSHONE
COUNTIES
Rates Fringes
BOILERMAKER......................$ 34.88 24.86
* BRID0003-001 07/01/2010
Rates Fringes
BRICKLAYER
Stone Mason, Marble Mason, Cement-Block Layer, Pointer-Cleaner-Caulker.....$ 23.71 10.57
ELEC0073-008 01/01/2010
BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO(NORTH OF THE 46TH
Cable Splicer....................$ 28.62 3%+12.98
ELECTRICIAN......................$ 28.37 13.98
IRON0014-003 07/01/2010
BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO(NORTH OF THE 46TH
Ironworker, Rebar................$ 31.09 19.60
IRONWORKER, STRUCTURAL...........$ 31.09 19.60
LABO0238-011 06/01/2009
BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO (NORTH OF THE 46TH
PARALLEL), KOOTENAI, LATAH, LEWIS, NEZ PERCE AND SHOSHONE
ZONE 1
Laborer: General/Cleanup.........$ 22.66 8.75
Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00
BASE POINTS: Spokane, Pasco, Lewiston
Zone 1: 0-45 radius miles from the main post office.
Zone 2: 45 radius miles and over from the main post office
LABO0238-012 06/01/2009
BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO (NORTH OF THE 46TH
PARALLEL), LATAH, LEWIS, NEZ PERCE AND SHOSHONE COUNTIES
Hod Carrier......................$ 24.10 8.75
* PAIN0005-009 07/01/2010
BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO (NORTH OF THE 46TH
Painters: Brush, Roller, Paperhanger, Striping, Steam-Cleaning and Spray.........$ 19.93 7.98
*$.70 shall be paid over and above the basic wage rates listed for work on swing stages and high work over 30 feet
PAIN0054-009 07/01/2010
BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO(NORTH OF THE 46TH
PARALLEL), KOOTENAI, LATAH, LEWIS, NEX PERCE AND SHOSHONE
Drywall taper/finisher...........$ 22.60 9.14
PLUM0044-005 01/01/2010
BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO (NORTH OF THE 46TH
PIPEFITTER
BENEWAH, BONNER, BOUNDARY,
CLEARWATER, IDAHO (NORTH
OF THE 46TH PARALLEL),
KOOTENAI, LATAH, LEWIS AND
SHOSHONE COUNTIES...........$ 33.23 15.02
NEZ PERCE COUNTY............$ 33.23 15.02
SHEE0066-011 01/01/2011
BENEWAH, BONNER, BOUNDARY, CLEARWATER, KOOTENAI, LATAH, LEWIS,
NEZ PERCE AND SHOSHONE COUNTIES
Sheet metal worker (INCLUDING
HVAC DUCT WORK)..................$ 27.81 15.30
SHEE0213-004 01/01/2008
IDAHO (NORTH OF THE 46TH PARALLEL) COUNTY
Rates Fringes
Sheet metal worker (INCLUDING
HVAC DUCT WORK)..................$ 23.41 11.74
SUID2003-002 09/03/2003
Rates Fringes
CARPENTER
Including concrete form work, drywall hanging and metal stud work.............$ 18.13 4.39
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .