Amend_1.docx

DOCX document 27 KB Posted

Attached to
Idaho Panhandle NF, Fernan Office HVAC Renovation
Solicitation number
AG-02RC-S-11-0062
Issued by

About this file

Amendment No. 1

View the file

Other files

File Type Posted
Amend_3.docx DOCX document
Sheet5_PACE_ AHU.pdf PDF
Amend_2.docx DOCX document
Sheet2_PUL6438s.pdf PDF
Sheet4_FanCoil.pdf PDF
Sheet6_YaskawaVFD.pdf PDF
Sheet3_WebsAX.pdf PDF
Sheet1_Web600.pdf PDF
Amend_1_WageDeterm.docx DOCX document
SPS.pdf PDF
Sol_Pkg_AG-02RC-S-11-0062.docx DOCX document
DB_Wage_Determination.docx DOCX document
DrawingsHVAC.pdf PDF
OwnerPastPerformanceSurvey.docx DOCX document
SF24BidBondFillForm.pdf PDF
IdahoWCI.doc DOC document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE

PAGE OF PAGES

AMENDMENT OF SOLICITATION OF CONTRACT

1
1
2. AMENDMENT NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
ONE
5/27/2011
6. ISSUED BY
CODE
7. ADMINISTERED BY (If other than Item 6)
CODE

USDA Forest Service Idaho Panhandle National Forests 3815 Schreiber Way Coeur d'Alene ID 83815-8363

Contracting Officer Idaho Panhandle National Forests 3815 Schreiber Way Coeur d'Alene ID 83815-8363

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code)
(X)
9A. AMENDMENT OF SOLICITATION NO.

AG-02RC-S-11-0062

9B. DATED (SEE ITEM 11)

5/17/2011

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

XX
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt offers , XX _is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b)By acknowledging the receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

()
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify Authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

Fernan Office HVAC Renovation, Coeur d Alene River Ranger District, Idaho Panhandle National Forests is hereby amended as follows:

Notes attached from pre-proposal conference conducted on May 24, 2011 Pen and ink changes to the Project Specifications per attached.

Replace Wage Determination with attached, dated May 27, 2011.

Acknowledgement of this amendment is required to be submitted with your proposal.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

RITA J. LOPER

15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED

BY

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-807030-10STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLEPrescribed by GSA
FAR (48 CFR) 53.24

PREPROPOSAL MEETING NOTES

Fernan HVAC Renovation

AG-02RC-S-11-0062

Prepropsal Meeting held at Fernan Office on Tuesday, May 24, 2011, from 9:00 a.m. to 9:55 a.m. In attendance were Rita Loper, CO, Mike Shoup, COR, and Marion Daniel, Procurement Tech, along with 14 attendees as follows:

Mike Knowles, Johnson Controls Inc Darin Meeks, Dardan Enterprises Inc Rich Little, MTM Contractors Inc Mark Janes, CMEC Greg Rehn, HydroSci Wayne Stevens, Arc Electric Stuart Young, Evergreen Mechanical & Electric Ryan Sampson, Shannon Plumbing & Heating David Lopez, D&D Flooring Jonathan Bess, ATS Inland NW Chris Clemens, Green Water Energy LLC Chris Peterson, Conifer Electric Inc Pat O’Brien, SMK Service

Rita highlighted the following solicitation package requirements:

Bid bond must be submitted with package Performance and Payment Bonds will be required upon award Performance Period is 120 calendar days based on the Notice to Proceed, which will be issued sometime in July Section H Key Personnel must be addressed in technical proposal for submittal One Base Item – HVAC System and Controls upgrade One Option Item – Replace air-cooled chiller Section I Buy American Act – need a waiver if unable to purchase items made in America Section K:

CCR & ORCA – must be registered NAICS Code in CCR must match on code on package 238220 Attachment for Idaho Worker’s Compensation Technical Business Proposal:

Past Performance - must submit information for offeror and subcontractors Owner/Client Survey attached if need to obtain past performance information for prior work (haven’t done previous government work); can email or fax to Rita Technical Approach:

Plan of Operation (include how going to maintain bldg temperature during project) Time Flow Chart Resources dedicated to project Qualifications of key personnel (experience/skills for this type of work) Qualifications of subcontractors Quality Control Experience v. Past Performance Experience – specific skills from other work performed that relate to this type of work Past Performance – how previously dealth with cost control and subcontractors, how responsive to changes, and how business is conducted.

Amendment No. 1

Section M Evaluation Factors:

Ratings – Exceptional, Acceptable, Marginal, Unacceptable, and Neutral; do not take exception if receive a Marginal rating, which reflects how a particular item rated out as opposed to reflection of overall company Debriefing – can be requested if project not awarded to offeror; contact Rita Loper

Procurement Technical Assistance Center (PTAC) http://www.ptac.idaho.gov – a free service to help businesses seeking to compete successfully in government contracting, e.g., securing necessary registrations, preparing proposals, etc.

Question/Answer

1. Will the exisitng concrete pad for the boiler be removed?

See Key Note 7 on sheet M.1.1 for concrete pad requirements.

2. Drawings – M.1.3, shows existing duct, should it be marked relocated?

YES

3. Drawings M.1.1, Is the return air plenum in detail 16/M1.3?

YES

4. Are State of Idaho Inspections required?

YES, plumbing, mechanical permits and inspections

5. Is there a chase that goes back to the building?

It will be required with a new chiller.

6. Can contractors visit the site again at a later time?

YES, Contact Mike Shoup to schedule an appointment.

PEN and INK CHANGES TO PROJECT SPECIFICATIONS

CHANGE header from “Fernan Idaho” to Coeur d Alene River Ranger District.

Section 01 1000 1.5 (E) Waste Material. Remove all waste material on a regular basis. CHANGE “regular” to “daily”

Section 01 1000 1.5 (F)…..The Owner’s Representative shall be notified of any intentions to work after operating hours….. ADD …”notified in writing”

Section 01 1000 (G) …State of Montana …… CHANGE to “State of Idaho”

Section 01 5000 (3.2)(E) (1) Toilets: Use of Owner’s toilet facilities will be permitted, as long as facilities are cleaned and maintained in condition acceptable to Owner.

ADD “as found before use”

Section 01 1000 (3.2)(L) DELETE “Provide a desktop computer in the primary field office adequate for use by Contracting Officer and Owner…..

Section 01 1000 (3.3) (D) and (E)….contractor can use existing elevator/stairs…. …in a condition acceptable to Owner….. ADD: “broom swept and free of stains”

Section 01 1000(3.3) (F) Stairs DELETE “…..restore stairs to new condition”

Section 01 7300 (3.3)(F) Do not use tools or equipment that produce harmful noise levels ADD “noise levels shall not exceed OSHA 1910.95”

Section 01 7823(2.5)(F) DELETE section“Warranties and Bonds.

Section 01 7823(2.6)(H) DELETE section “Warranties and Bonds.

Section 01 7900 (3.2) Instruction (B) (1)(2)(3) DELTE:

(1) Contracting Officer will furnish an instructor……

(2) Owner will furnish an instructor……

(3) Owner will furnish contractor…..

File details come from the government source that posted it. Updated .