Project Specs.doc

DOC document 6 MB Posted

Attached to
Big Piney Office Construction Federal contract opportunity
Solicitation number
AG-02NV-S-09-0059
Issued by
Department of Agriculture Forest Service R4-Intermountain Region

About this file

Project Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Big Piney Office Construction, newest first.
File Type Posted
Amendment 02.doc DOC document
REVISED AE511.pdf PDF
REVISED AE405.pdf PDF
Geotechnical Report.doc DOC document
Amendment 01.doc DOC document
REVISED MS101_F.pdf PDF
REVISED AE406.pdf PDF
REVISED AE404.pdf PDF
REVISED AE303_R.pdf PDF
05_D2_site_id_sign D2 —
REVISED MH 504.pdf PDF
const_rfp_solicitation.doc DOC document
BigPiney.Drawings.Final.06.12.09.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA FOREST SERVICE, R-4

BIG PINEY OFFICE

SECTION 000501 - OFFICE BUILDING

PART 1 - GENERAL

1.1 SUMMARY

A. This work includes the construction of an Office Building.

1.2 REFERENCE SPECIFICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

2006 International Building Code

2006 International Residential Code

2006 International Plumbing Code

2006 International Mechanical Code

2006 International Fuel Gas Code

2006 International Energy Conservation Code

2005 National Electrical Code

2007 National Fire Protection Association Standards 13R and 13D.

2004 Americans with Disabilities Act/Architectural Barriers Act Guidelines (ADA/ABAG) (http://www.access-board.gov/adaag/html/adaag.htm)

1.3 MEASUREMENT AND PAYMENT

A. Office Building - Measurement and Payment shall be Lump Sum Quantity (LSQ) as shown in the Schedule of Items for the office building constructed and completed ready for use. Measurement shall include all work items within 10 feet outside the building and covered porch perimeter (including utilities within those limits); and includes the concrete slab porch, and all concrete work within 10 feet of the face of the building walls. Measurement also includes all finish grading around the building including areas beyond 10 feet from the building.

1.4 RELATED WORK

A. The work shall be in accordance with the contract drawings.

B. The work shall be in accordance with the following specifications. The subsidiary specifications are referred to in the text by the Section designation only.

DIVISION 1 – GENERAL REQUIREMENTS

010250 - CONSTRUCTION STAKING

011250 - MEASUREMENT AND PAYMENT WITH ASPHALT

011900 – MOBILIZATION

013300 - SUBMITTAL PROCEDURES

014100 – QUALITY CONTROL

019113 - GENERAL COMMISSIONING REQUIREMENTS

019114 - PLUMBING SYSTEMS COMMISSIONING REQUIREMENTS

019115 - HVAC SYSTEMS COMMISSIONING REQUIREMENTS

019116 - ELECTRICAL SYSTEMS COMMISSIONING REQUIREMENTS

DIVISION 2 – EXISTING CONDITIONS

023701 - SEDIMENT AND EROSION CONTROL MEASURES

024100 - WASTE MATERIAL DISPOSAL

DIVISION 3 – CONCRETE

033000 - CAST-IN-PLACE CONCRETE

034500 - ARCHITECTURAL PRECAST CONCRETE

DIVISION 4 - MASONRY

047200 - CAST STONE

DIVISION 5 - METALS

055000 - METAL FABRICATIONS

DIVISION 6 - WOOD AND PLASTICS

061000 - ROUGH CARPENTRY

061323 - HEAVY TIMBER CONSTRUCTION

061600 - SHEATHING

061753 - SHOP-FABRICATED WOOD TRUSSES

062013 - EXTERIOR FINISH CARPENTRY

064023 - INTERIOR ARCHITECTURAL WOODWORK

066610 - MANUFACTURED TRIM AND ORMIMENTS - URETHANE

DIVISION 7 - THERMAL AND MOISTURE PROTECTION

071113 - BITUMINOUS DAMPROOFING

072100 - THERMAL INSULATION

074113 - METAL ROOF PANELS

074213 - METAL WALL PANELS

074600 – SIDING

076200 - SHEET METAL FLASHING AND TRIM

079200 - JOINT SEALANTS

Article I.

DIVISION 8 - DOORS AND WINDOWS

Article II. DIVISION 8 - DOORS AND WINDOWS

DIVISION 8 - DOORS AND WINDOWS

081416 - FLUSH WOOD DOORS

082143 - OUT-SWING ENTRY DOORS

083113 - ACCESS DOORS AND FRAMES

085200 - ALUMINUM CLAD WOOD WINDOWS

087100 - DOOR HARDWARE

088000 - GLAZING

DIVISION 9 - FINISHES

092216 - NON-STRUCTURAL METAL FRAMING

092900 - GYPSUM BOARD

093033 - STONE TILING

095110 - ACOUSTICAL PANEL CEILINGS

096511 - RESILIENT FLOOR TILE

096530 - RESILIENT WALL BASE AND ACCESSORIES

096810 - CARPET TILE

097700 - SPECIAL WALL FINISH

099120 - INTERIOR PAINTING

099300 - STAINING AND TRANSPARENT FINISHING

099600 - HIGH-PERFORMANCE COATINGS

DIVISION 10 – SPECIALTIES

101400 - SIGNAGE

101415 - SITE IDENTIFICATION SIGN AND BASE

101550 - TOILET COMPARTMENTS

102800 - TOILET AND BATH, ACCESSORIES

105201 - FIRE PROTECTION SPECIALTIES

DIVISION 11 - EQUIPMENT

111320 - PROJECTION SCREENS AND PROJECTOR CEILING MOUNTS

113500 - WOOD BURNING FIREPLACE INSERTS

DIVISION 12 - FURNISHINGS

122113 - HORIZONTAL LOUVER BLINDS

124813 - ENTRANCE FLOOR MATS AND FRAMES

DIVISION 22 - PLUMBING

220513 - COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT

220518 - ESCUTCHEONS FOR PLUMBING PIPING

220519 - METERS AND GAGES FOR PLUMBING PIPING

220523 - GENERAL-DUTY VALVES FOR PLUMBING PIPING

220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING & EQUIPMENT

220553 - IDENTIFICATION FOR PLUMBING PIPING & EQUIPMENT

220719 - PLUMBING PIPING INSULATION

221116 - DOMESTIC WATER PIPING

221119 - DOMESTIC WATER PIPING SPECIALTIES

221316 - SANITARY WASTE AND VENT PIPING

221319 - SANITARY WASTE PIPING SPECIALTIES

223300 - ELECTRIC-DOMESTIC/WATER HEATERS

224000 - PLUMBING FIXTURES

224700 - DRINKING FOUNTAINS AND WATER COOLERS

DIVISION 23 – HEATING, VENTILATINF, AND AIR CONDITIONING

230513 - COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

230518 - ESCUTCHEONS FOR HVAC

230519 - METERS AND GAGES FOR HVAC PIPING

230523 - GENERAL-DUTY VALVES FOR HVAC PIPING

230529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

230553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC

230713 - DUCT INSULATION

230719 - HVAC PIPING INSULATION

230900 - INSTRUMENTATION AND CONTROLS FOR HVAC

230993 - SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

231123 - FACILITY NATURAL-GAS PIPING

232113 - GROUND-LOOP HEAT-PUMP PIPING

232123 - HYDRONIC PUMPS

233113 - METAL DUCTS

233000 - AIR DUCT ACCESSORIES

233423 - HVAC POWER VENTILATORS

233713 - DIFFUSERS, REGISTERS, AND GRILLES

234100 - PARTICULATE AIR FILTRATION

235100 - BREACHINGS, CHIMNEYS, AND STACKS

238146 - WATER-SOURCE UNITARY HEAT PUMPS

DIVISION 26 – ELECTRICAL

260500 - COMMON WORK RESULTS FOR ELECTRICAL

260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

260533 - RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

260536 - CABLE TRAYS FOR ELECTRICAL SYSTEMS

260537 - FLEXTRAY WIRE BASKET SUPPORT SYSTEMS

260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS

260923 - LIGHTING CONTROL DEVICES

262416 – PANELBOARDS

262713 - ELECTRICITY METERING

262726 - WIRING DEVICES

264313 - TRANSIENT-VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS

265100 - INTERIOR LIGHTING

265600 - EXTERIOR LIGHTING

DIVISION 27 – COMMUNICATIONS

270500 - COMMON WORK RESULTS FOR COMMUNICATIONS

270700 – TELECOMMUNICATIONS WIRING SYSTEMS

DIVISION #31 - EARTHWORK

311000 - CLEARING AND GRUBBING OPEN

312000 – EARTHWORK

PART 2 - PRODUCTS - Not Applicable

PART 3 - EXECUTION – Not Applicable

END OF SECTION 000501

June 2009

USDA FOREST SERVICE, R-4

BIG PINEY OFFICE

SECTION 010250 - CONSTRUCTION STAKING

PART 4 - GENERAL

4.1 SUMMARY

A. This work shall consist of the construction staking of roads, parking lots, sidewalks, signs, concrete pads, culverts, buildings, and utilities in accordance with the drawings and specifications. The work includes the furnishing of all labor, equipment, instruments, materials, transportation and other incidentals necessary to complete the construction staking in accordance with these specifications and acceptable engineering practice.

4.2 QUALITY CONTROL

A. Construction staking shall be accomplished under the direction of a Licensed Civil Engineer or Land Surveyor closely associated and familiar with construction staking; periodic visits to the project site are required.

4.3 MEASUREMENT AND PAYMENT

A. Measurement shall be lump sum for surveying and staking the project through all phases of construction.

PART 5 - PRODUCTS

5.1 GOVERNMENT-FURNISHED SURVEY CONTROL SHEETS

A. The Government will provide the contractor with a set of survey control sheets showing horizontal and vertical control for site to be staked. The Government will provide the Contractor with layout information that will include the Northing, Easting, and Elevations for centerline of roads and parking areas, edge of parking areas and corners of buildings and other structures.

5.2 STAKES

A. Identification stakes and hubs shall be of sufficient length and width to provide and solid set in the ground and to provide space for marking above ground when applicable. Other dimensions and materials may be used, such as steel reinforcing bars, wire flagging and markers, and metal pins, if approved in writing by the Contracting Officer (CO). The top 2 inches of all slope, guard, reference, clearing, and structure stakes shall be painted or marked with plastic flagging. Colors used on stakes or for flagging shall be as follows:

1. Roads and parking areas

-Orange

2. Waterlines, utilities, and culverts

-Blue

3. Sidewalks, stairs, and concrete pads

-Red

4. Buildings, excavation and grading

-Yellow

5.3 SURVEY NOTE PAPER AND BOOKS

A. Paper for survey notes shall be moisture-resistant paper. Notes shall be contained in books with covers that will protect the contents and retain the pages in numerical sequence during field use. Field notebooks or note paper shall be furnished by the contractor.

PART 6 - EXECUTION

6.1 GENERAL

A. The Contractor shall be required to provide all necessary staking and control for all phases of construction. The contractor shall use the data and information shown on the project drawings to establish the location of all facilities to be constructed under this contract. The Contractor may choose any method of establishing horizontal and vertical controls provided the following minimum precision and accuracy requirements are met.

B. Accuracy requirements:

1. Minimum position close; 1/1000

2. Vertical closure: 0.05 ft (vertical)/station (100 feet horizontal)

3. Cross section and slope stake precision:

C. Allowable deviation of cross section line projection from a true perpendicular to tangents, a true bisector of angle points, or a true radius of curves: +/-3 degrees.

D. Cross section topography measurements shall be taken so that variations in ground form a straight line connecting the cross section points will not exceed: 1.0 ft.

E. Horizontal and vertical accuracy for slope stake, slope stake references, and clearing limits. In feet or percentage of horizontal distance measured form centerline or reference stake, whichever is greater. Slope reference stakes and slope stakes: 0.15 ft or 0.6%. Clearing limits: 1.0 ft.

6.2 ESTABLISING AND REFERENCING IMPROVEMENT LOCATIONS

A. Roads and Parking Areas:

1. Slope stakes (cut and fill catch points), clearing limits, and slope stake references shall be established on both sides of the centerline at each station established. Slope stakes and slope stake references shall be located on a line at right angles to tangents and on radial lines or curves. Slope stake catch points shall be located by using the grading plans and/or profiles as shown on the drawings.

2. Slope stakes shall be set at 50-foot intervals, at significant breaks in the ground profile, culvert locations, and widening transition points. Slope stakes shall be set at 25 foot intervals around curves having a radius less than 100 feet.

B. Concrete Pads

1. Slope stakes shall be established at the corners of concrete pads. Slope stakes shall be written to reference the finish grade of the unit or pad being staked.

C. Sidewalks

1. Slope stakes (cut and fill catch points), clearing limits, and slope stake references shall be established on both sides of the centerline at each station established. Slope stakes and slope stake references shall be located on a line at right angles to tangents and on radial lines or curves. Slope stake catch points shall be located by using the grading plans and/or profiles as shown on the drawings.

2. Slope stakes shall be set at 10-foot intervals and at significant breaks in the ground profile or horizontal alignment.

D. Waterline, Sewerline, & other Utilities

1. Waterline, Sewerline, & other Utilities shall be staked at 25-foot intervals to the minimum burial depth specified on the drawings. Waterline and sewerline elevations shall be accurately staked to provide for drainage as indicated on the drawings. Grade stakes shall be established as necessary to provide the control for the construction work.

E. Buildings

1. Slope stakes and slope stake references shall be established at each corner and as necessary to provide adequate construction control.

6.3 DISCREPANCIES

A. The contractor shall compare the staked centerline horizontal and vertical alignment with the design data. Differences between previously recorded and observed elevations of bench marks shall be referred to the Contracting Officer. Differences in centerline profile elevations exceeding 1 foot at any two or more consecutive points shall be reported to the contracting Officer for evaluation and possible revision. Staking of these areas shall be deferred until the Contacting Officer resolves these differences.

6.4 VERTICAL CONTROL

A. Vertical control for construction shall be as referenced on the Drawings.

6.5 MARKING STAKES

A. All stakes shall be legibly marked, in the format agreed upon with the Contracting Officer, with a stake pencil that leaves an imprinted or with waterproof ink. Marking shall conform to the nomenclature below;

PI

Point of Intersection of tangents

PC

Point of curvature

POC

Point on curve

Pt

Point of tangency

POT

Point on tangent

RP

Reference point

P

P-line (preliminary location line)

L

L-line (final location line)

BM

Bench mark

TBM

Temporary bench mark

BT

Begin taper (any)

ET

End taper (any)

C

Cut

F

Fill

L

Centerline

D

Ditch

W

Width

6.6 SURVEY NOTES

A. All survey data shall be neatly recorded in survey books. All survey notes shall become the property of the Forest Service. Errors shall be deleted by lining out. Date, crew names and positions, instrumentation, and weather shall be recorded in the notes at the beginning of each day’s work. The party chief shall sign or initial each page of the notes immediately after the last entry for each day’s work.

B. Electronically recorded survey notes shall be consecutively numbered and headed to identify the contents. The notes shall be supported and accompanied by a bound book that records the project name and for each day identifies date, crew names and positions, instrumentation, weather, type of survey, stationing of sections between which survey was performed, and survey data or sketched that cannot be electronically recorded. The party chief shall sign or initial the electronically recorded notes and Day Book immediately after the last entry for each day’s work.

END OF SECTION 010250

APRIL 2006

USDA FOREST SERVICE, R-4

BIG PINEY OFFICE

SECTION 011250 - MEASUREMENT AND PAYMENT WITH ASPHALT

PART 7 - GENERAL

7.1 SUMMARY

A. Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work, labor, materials, equipment, and incidentals necessary to successfully complete the project will be considered as included in the payment for items shown. This section defines the method of measurements and basis of payment for work items listed in the Schedule of Items.

B. When more than one class, size, type, thickness, etc. is specified in the Schedule of Items for any pay item, suffixes will be added to the item number to differentiate between the pay items.

7.2 DETERMINATION OF QUANTITIES

A. The following measurements and calculations shall be used to determine contract quantities for payment.

1. For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting and erosion control blankets shall be along slope lines.

2. For excavation or embankment volumes, the average end area method shall be used to compute volumes. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by volume in hauling vehicles or by other three-dimensional methods.

3. For Structures, they shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions.

4. For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, piping, utilities, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed.

5. For aggregates weighed for payment, the tonnage shall not be adjusted for moisture content, unless otherwise provided for.

6. For standard manufactured items (such as fence, wire, plates, rolled shapes, pipe conduits) identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.

7. For bituminous material, volumes will be measured at 60(F or will be corrected to the volume at 60(F by using ASTM D1250 for asphalts. Emulsified asphalt will be measured at 60(F, or measured by converting the gallonage at another temperature to gallonage at 60(F by means of the following formula:

Gallons at 60(F = Gallons at A(F

1+0.00025 (A(F - 60(F)

* A(F is the temperature of the material at the time the gallonage is measured.

a. For vehicular shipments, net certified scale weights or weights based on certified volumes will be used as a basis of measurement. Measurements will be adjusted when bituminous material has been lost from the vehicle or the distributor, has been wasted, or has otherwise not been incorporated into this work. Determining true weights of hauling vehicles shall be made by weighing the empty vehicles at least once a day at the times the CO directs. Each vehicle shall bear a plainly legible identification mark.

b. When bituminous materials are shipped, net certified weights, or volume corrected for loss of foaming, can be used for computing quantities.

B. Earthwork Tolerances - Adjustments of horizontal or vertical alignment, within the tolerances specified in this contract, or shifts of balance points up to 100 feet shall be made by the contractor as necessary to produce the designed sections and to balance earthwork. Such adjustments shall not be considered as "Changes."

7.3 UNITS OF MEASUREMENT

A. Payment shall be by units defined and determined according to U.S. Standard measure and by the following:

1. Acre: Make longitudinal and transverse measurements for area computations horizontally.

2. 50lb Bag: Measurement will be for the actual number of 50lb bags of standard bentonite grout.

3. 94lb Bag: Measurement will be for the actual number of 94lb bags of standard cement or grout.

4. Cubic Yard (CY): A measurement computed by one of the following methods:

a. Excavation, Embankment, or Borrow. The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.

b. Material in Place or Stockpile. The measurement computed using the dimensions of the in-place material.

c. Material in the Delivery Vehicle. The measurement computed using measurements of material in the hauling vehicles at the point of delivery. Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.

5. Each (EA): One complete unit, which may consist of one or more parts.

6. Gallons (GAL): The quantity shall be measured by any of the following methods:

a. Measured volume in container.

b. Metered volume by approved metering system.

c. Commercially package volume.

7. Hour (HR): Measurement will be for the actual number of hours (or fraction thereof) ordered by the Contracting Officer and performed by the contractor.

8. Linear Foot (LF): Measurement of work along its length from point-to-point; parallel to the base or foundation. Do not measure overlaps.

9. Lump Sum (LS): One complete unit.

10. Mile: Measured horizontally along the centerline of each roadway, approach, or ramp.

11. Pound (LB): For sacked or packaged material, measurement will be the net weight as packed by the manufacturer.

12. Square Foot (SF): Measured on a plane parallel to the surface being measured.

13. Square Yard (SY): Measured on a plane parallel to the surface being measured.

14. Ton: Measured as a short ton consisting of 2,000 pounds.

7.4 METHOD OF MEASUREMENT

A. One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:

1. ACTUAL QUANTITIES (AQ) - These quantities are determined from actual measurements of completed work.

2. DESIGNED QUANTITIES (DQ) - These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units shown in the Schedule of Items may be authorized under any of the following conditions:

a. As a result of changes in the work authorized by the CO.

b. As a result of the CO determining that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.

c. As a result of the Contractor submitting to the CO a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.

3. LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.

4. STAKED QUANTITIES (SQ) - These quantities are determined from staked measurements prior to construction.

5. VEHICLE QUANTITIES (VQ) - These quantities are measured or weighed in hauling vehicles.

7.5 PRICE ADJUSTMENT (for Out-of-Specification Bituminous Materials)

A. Bituminous materials are defined as all types and grades of asphalt cement, liquid asphalt, emulsified asphalt, and dust oil.

B. If bituminous material fails one or more test requirements, and the Contracting Officer determines it is in the public interest to accept the material at a reduced price, the price reduction shall be based on the test results giving the largest percent price adjustment. The contractor may remove and replace the defective material or accept the adjustment.

C. The price reduction shall apply to all pay items affected.

D. Price adjustment will be based on samples taken in duplicate in accordance with AASHTO T40 under the supervision of the Contracting Officer. Samples shall be sent to an authorized laboratory. The laboratory shall test one of each duplicate sample and retain the other. When any test result is not within the specification limits, the laboratory shall immediately notify the Contractor, the supplier, and the Contracting Officer. The Contractor, after notifying the Contracting Officer, may check test the retained sample.

E. If the retained sample tests satisfactorily, the material will be accepted. If the retained sample also fails, the following schedule of price adjustments shall apply. The average of test values for the two samples will determine the basis for price adjustment, except when test results on the samples differ by more than the applicable AASHTO or ASTM Repeatability Unit; then, the test result numerically nearest the specification requirement will be used. (A repeatability unit is defined as D2S or D2S% limit for single operator precision described in ASTM C670.)

F. The schedule of price adjustments shall not apply to the following tests:

Test
AASHTO Test Method
Spot Test
T102
Particle Charge
T59
Ductility
T51

G. Bituminous materials failing to meet specifications for these tests shall be removed and replaced.

H. See Table 011250-1 for the schedule of price adjustments for bituminous materials that do not meet specifications.

Table 011250-1

Schedule of Price Adjustments for Out-of-Specification Bituminous Materials.

Application
Deviation from Specification Limit Measured in Reproducibility Units*.
Less than 1
1 but less than 2
2 but less than 3
3 or more
Price reduction applicable to bituminous base course and pavement mixture or to seal coat and bituminous material paid for as a separate item.
0%
5%
25%
Remove & Replace
Price reduction applicable to bituminous material paid for as a separate item.
0%
10%
25%
Remove & Replace

* A reproducibility unit is defined as D2S or D2S% limit for multi-laboratory precision described in ASTM recommended practice C670.

The Sieve Test (AASHTO T59) results may be exempt from the Schedule of Price Adjustments provided the contractor's quality assurance program includes checking the uniformity of bituminous spread rates in increments no greater than 1 foot over the width of the spray bar and variation between increments is no greater than 5 percent.

PART 8 - PRODUCTS (NOT APPLICABLE)

PART 9 - EXECUTION (NOT APPLICABLE)

REVISION HISTORY:

PRIMARY AUTHOR: ???

5/11/2006 D. WEWER – Added 50# Bags to list of units.

END OF SECTION 011250

MAY 2006

USDA FOREST SERVICE, R-4

BIG PINEY OFFICE

SECTION 011900 - MOBILIZATION

PART 10 - GENERAL

10.1 SUMMARY

A. This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.

B. The measurement shall be lump sum for mobilization.

C. Payment:

1. Bond premiums will be reimbursed after receipt of the evidence of payment.

2. 50% of the lump sum, not to exceed 5% of the original contract amount, will be paid following completion of 5% of the original contract amount not including mobilization and bond premiums.

3. Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not including mobilization and bond premiums.

4. Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance.

5. Progress payments for mobilization and preparatory work shall be subject to retainage.

PART 11 - PRODUCTS (NOT USED)

PART 12 - EXECUTION (NOT USED)

END OF SECTION 011900

July 2005

USDA FOREST SERVICE, R-4

BIG PINEY OFFICE

SECTION 013300 - SUBMITTAL PROCEDURES

PART 13 - GENERAL

13.1 SUMMARY

A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals. See Table 013300-1 for a summary of required submittals.

B. See other specification section within this package for additional requirements on submittal.

13.2 SUBMITTAL PROCEDURES

A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

a. The Contracting Officer (CO) reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

B. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.

1. Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.

2. If intermediate submittal is necessary, process it in same manner as initial submittal.

3. Allow 14 days for processing each re-submittal.

4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.

C. Identification: Place a permanent label or title block on each submittal for identification.

1. Indicate name of firm or entity that prepared each submittal on label or title block.

2. Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by CO.

3. Include the following information on label for processing and recording action taken:

a. Project name.

b. Date.

c. Name and address of Contractor.

d. Name of manufacturer.

e. Unique identifier, including revision number.

f. Number and title of appropriate Specification Section.

g. Drawing number and detail references, as appropriate.

h. If more than one item is shown on submittal sheet, identify item.

D. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.

E. Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.

F. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.

13.3 MEASUREMENT AND PAYMENT

A. No separate measurement and/or payment will be made for this section. Payment shall be included with work shown in the schedule of items.

PART 14 - PRODUCTS

14.1 ACTION SUBMITTALS – (Submittals requiring CO approval)

A. General: Prepare and submit Action Submittals required by individual Specification Sections.

1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document.

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

a. Manufacturer's written recommendations.

b. Manufacturer's product specifications.

c. Manufacturer's installation instructions.

d. Manufacturer's catalog cuts.

e. Wiring diagrams showing factory-installed wiring.

f. Compliance with recognized trade association standards.

g. Compliance with recognized testing agency standards.

C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.

1. Preparation: Include the following information, as applicable:

a. Dimensions.

b. Identification of products.

c. Fabrication and installation drawings.

d. Roughing-in and setting diagrams.

e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.

f. Notation of dimensions established by field measurement.

2. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.

D. Contractor's Construction Schedule: The contractor shall submit a Construction Schedule, for approval by CO, in accordance with the contract provisions within 5 day of commencement of work.

E. Samples: Prepare physical units of materials or products, including the following:

1. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.

14.2 INFORMATIONAL SUBMITTALS – (Submittals NOT requiring CO approval)

A. General: Prepare and submit Informational Submittals required by other Specification Sections.

1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will not return copies.

2. Certificates and Certifications: Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

3. Test and Inspection Reports: Comply with requirements in Section 014100 "Quality Control."

B. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.

C. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements.

D. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment.

E. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.

PART 15 - EXECUTION

15.1 GENERAL

A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.

B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

C. CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.

D. Submittals not required by the Contract Documents will not be reviewed and may be discarded.

E. Substitutions – Whenever materials, products, and equipment are listed by name or brand in the specifications and/or on the drawings, it is used as a measure of quality, utility, or standard. If the Contractor prefers to use any other brand or manufacturer of same quality, appearance and utility to that specified, he shall request substitution as provided below, not less than 30 days before the planned installation of the item. The Contracting Officer will approve or disapprove the request for substitution.

F. Requests for substitutions will only be considered if contractor submits the following:

1. Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution. Submit additional information if required by Contracting Officer. All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally specified item.

2. Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.

3. A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws.

4. The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.

15.2 SUBMITTAL SCHEDULE – Submittals shall be made as required by and called for in the drawings and specifications. The following table is a summary of the required submittals for the project - the table is to assist the Contractor and may not be all inclusive – additional submittals may be required by specific specifications:

TABLE 013000-1

Spec. Section
Subsection
Section Title
Required Submittal
014100
1.3 A
Quality Control
Contractor quality control plan
014100
1.3 B
Quality Control
Permits, Licenses, and Certificates
014100
1.3 C
Quality Control
Test and inspection reports
014100
1.3 D
Quality Control
As-Built drawings
019113
1.5A
General Commissioning Requirements
Product Data
019113
3.6 & 3.8
General Commissioning Requirements
Training Materials
019114
1.6A
Plumbing System Commissioning Requirements
Reports
019115
1.6A
HVAC System Commissioning Requirements
Reports
023701
1.2A
Sediment and Erosion Control Measures
Erosion and Sediment Control Plan
033000
1.3A
Cast-in-Place Concrete
Product Data
033000
1.3B
Cast-in-Place Concrete
Design Mix
033000
1.3C
Cast-in-Place Concrete
Steel Shop Drawings
033000
1.3D
Cast-in-Place Concrete
Vaport Retarder Samples
033000
1.3E
Cast-in-Place Concrete
Qualification Data
033000
1.3F
Cast-in-Place Concrete
Material Test Reports
033000
1.3G
Cast-in-Place Concrete
Material Certificates
033000
1.3H
Cast-in-Place Concrete
Floor Surface Flatness
033000
1.3I
Cast-in-Place Concrete
Field Quality Control Test Reports
034500
1.4A
Precast Architectural Concrete
Product Data
034500
1.4B
Precast Architectural Concrete
Design Mix
034500
1.4C
Precast Architectural Concrete
Shop Drawings
034500
1.4D
Precast Architectural Concrete
Reports
047200
1.3A
Cast Stone
Product Data
047200
1.3B
Cast Stone
Shop Drawings
047200
1.3C,D,E
Cast Stone
Samples
047200
1.3F
Cast Stone
Qualifications Data
047200
1.3G
Cast Stone
Reports
055000
1.3A
Metal Fabrications
Product Data
055000
1.3B
Metal Fabrications
Shop Drawings
061000
1.3A
Rough Carpentry
Product Data
061000
1.3B
Rough Carpentry
Fastener Pattern
061000
1.3C
Rough Carpentry
Certificates
061000
1.3D
Rough Carpentry
Reports
061323
1.3A
Heavy Timber Construction
Product Data
061323
1.3B
Heavy Timber Construction
Shop Drawings
061323
1.3C
Heavy Timber Construction
Samples
061323
1.3D,E
Heavy Timber Construction
Certificates
061600
1.2A
Sheathing
Product Data
061600
1.2B
Sheathing
Reports
061753
1.4A
Shop Fabricated Wood Trusses
Product Data
061753
1.4B
Shop Fabricated Wood Trusses
Shop Drawings
061753
1.4C,E
Shop Fabricated Wood Trusses
Certificated
061753
1.4D
Shop Fabricated Wood Trusses
Qualifications Data
061753
1.4F
Shop Fabricated Wood Trusses
Reports
062013
1.3A
Exterior Finish Carpentry
Product Data
062013
1.3B,C
Exterior Finish Carpentry
Samples
062013
1.3D
Exterior Finish Carpentry
Certificated
062013
1.3E
Exterior Finish Carpentry
Warranties
062013
1.3F
Exterior Finish Carpentry
Reports
064023
1.4A
Interior Architectural Wood Work
Product Data
064023
1.4B
Interior Architectural Wood Work
Shop Drawings
064023
1.4C,D,E
Interior Architectural Wood Work
Samples
064023
1.4F
Interior Architectural Wood Work
Qualifications Data
066610
1.3A
Manufactured Trim and Ornamental, Urethane
Product Data
072113
1.2A
Bituminous Damp Proofing
Product Data
072100
1.2A
Thermal Insulation
Product Data
072100
1.2B,C
Thermal Insulation
Reports
074114
1.4A
Metal Roof Panels
Product Data
074114
1.4B
Metal Roof Panels
Shop Drawings
074114
1.4C,D
Metal Roof Panels
Samples
074114
1.4E
Metal Roof Panels
Reports
074114
1.4F
Metal Roof Panels
Maintenance Data
074114
1.4G
Metal Roof Panels
Warranties
074213
1.4A
Metal Wall Panels
Product Data
074213
1.4B
Metal Wall Panels
Shop Drawings
074213
1.4C,D
Metal Wall Panels
Samples
074213
1.4E
Metal Wall Panels
Qualifications Data
074213
1.4F,G
Metal Wall Panels
Reports
074213
1.4H
Metal Wall Panels
Maintenance Data
074213
1.4I
Metal Wall Panels
Warranties
074600
1.2A
Siding
Product Data
074600
1.2B,C
Siding
Samples
074600
1.2D
Siding
Reports
074600
1.2E
Siding
Maintenance Data
074600
1.2F
Siding
Warranties
076200
1.3A
Sheet Metal Flashing and Trim
Product Data
076200
1.3B
Sheet Metal Flashing and Trim
Shop Drawing
076200
1.3C
Sheet Metal Flashing and Trim
Samples
079200
1.2A
Joint Sealants
Product Data
079200
1.2B,C
Joint Sealants
Samples
079200
1.2D
Joint Sealants
Schedule
079200
1.2E
Joint Sealants
Qualifications Data
079200
1.2F
Joint Sealants
Certification
079200
1.2G,H
Joint Sealants
Reports
079200
1.2I
Joint Sealants
Warranties
081416
1.2A
Flush Wood Doors
Product Data
081416
1.2B,D,E
Flush Wood Doors
Material Submittal
081416
1.2C
Flush Wood Doors
Shop Drawings
081416
1.2F
Flush Wood Doors
Warranty
082143
1.2A
Out-Swing Entry Doors
Product Data
082143
1.2B
Out-Swing Entry Doors
Shop Drawings
082143
1.2C
Out-Swing Entry Doors
Samples
082143
1.2D
Out-Swing Entry Doors
Warranty
083113
1.2A
Access Doors and Frames
Product Data
083113
1.2B
Access Doors and Frames
Shop Drawings
085200
1.4A
Aluminum Clad Wood Window
Product Data
085200
1.4B
Aluminum Clad Wood Window
Shop Drawings
085200
1.4C
Aluminum Clad Wood Window
Product Schedule
085200
1.4D
Aluminum Clad Wood Window
Samples
085200
1.4E
Aluminum Clad Wood Window
Product Reports
085200
1.4F
Aluminum Clad Wood Window
Maintenance Data
085200
1.4G
Aluminum Clad Wood Window
Warranty
087100
1.2A
Door Hardware
Product Data
087100
1.2B,C,D
Door Hardware
Samples
087100
1.2E
Door Hardware
Product Test Report
087100
1.2F
Door Hardware
Maintenance Data
087100
1.2G
Door Hardware
Warranty
088000
1.4A
Glazing
Product Data
088000
1.4B
Glazing
Samples
088000
1.4C
Glazing
Glazing Schedule
088000
1.4D
Glazing
Product Certificates
088000
1.4E,F,G
Glazing
Reports
088000
1.4H
Glazing
Warranties
092216
1.2A
Non-Structural Metal Framing
Product Data
092900
1.2A
Gypsum Board
Product Data
093033
1.4A
Stone Tiling
Product Data
093033
1.4B
Stone Tiling
Shop Drawings
093033
1.4C,D
Stone Tiling
Samples
093033
1.4E
Stone Tiling
Qualifications Data
093033
1.4F,G
Stone Tiling
Certificates
093033
1.4H
Stone Tiling
Test Reports
095110
1.4A
Acoustical Panel Ceilings
Product Data
095110
1.4B
Acoustical Panel Ceilings
Coord. Drawings
095110
1.4C,D
Acoustical Panel Ceilings
Samples
095110
1.4E,F
Acoustical Panel Ceilings
Reports
095110
1.4G
Acoustical Panel Ceilings
Maintenance Data
096511
1.2A
Resilient Floor Tile
Product Data
096511
1.2B
Resilient Floor Tile
Samples
096511
1.2C
Resilient Floor Tile
Maintenance Data
096530
1.2A
Resilient Wall Base and Accessories
Product Data
096530
1.2B
Resilient Wall Base and Accessories
Samples
096810
1.2A
Carpet Tile
Product Data
096810
1.2B
Carpet Tile
Samples
096810
1.2C
Carpet Tile
Maintenance Data
097700
1.2A
Special Wall Finishes
Product Data
097700
1.2B
Special Wall Finishes
Samples
097700
1.2C
Special Wall Finishes
Reports
097700
1.2D
Special Wall Finishes
Maintenance Data
099120
1.2A
Interior Painting
Product Data
099120
1.2B,C
Interior Painting
Samples
099120
1.2D
Interior Painting
Product List
099300
1.2A
Staining and Transparent Finishing
Product Data
099300
1.2B,C
Staining and Transparent Finishing
Samples
099300
1.2D
Staining and Transparent Finishing
Product List
099600
1.2A
High-Performance Coatings
Product Data
099600
1.2B,C
High-Performance Coatings
Samples
099600
1.2D
High-Performance Coatings
Product List
101400
1.3A
Signage
Product Data
101400
1.3B
Signage
Shop Drawings
101400
1.3C,D
Signage
Samples
101400
1.3E
Signage
Sign Schedule
101400
1.3F
Signage
Maintenance Data
101400
1.3G
Signage
Warranty
101401
1.3A
Signs (Exterior)
Sign List
101550
1.3A
Toilet Compartments
Product Data
101550
1.3B
Toilet Compartments
Shop Drawings
101550
1.3C,D
Toilet Compartments
Samples
102800
1.2A
Toilet and Bath Accessories
Product Data
102800
1.2B
Toilet and Bath Accessories
Product Schedule
102800
1.2C
Toilet and Bath Accessories
Maintenance Data
105201
1.2A
Fire-Protection Specialties
Product Data
105201
1.2B
Fire-Protection Specialties
Samples
105201
1.2C
Fire-Protection Specialties
Maintenance Data
111320
1.3A
Projection Screens and Projector Ceiling Mounts
Product Data
111320
1.3B
Projection Screens and Projector Ceiling Mounts
Shop Drawings
111320
1.3C
Projection Screens and Projector Ceiling Mounts
Samples
111320
1.3D
Projection Screens and Projector Ceiling Mounts
Maintenance Data
113500
1.2A
Wood Burning Fireplace Insert
Product Data
113500
1.2B
Wood Burning Fireplace Insert
Product Schedule
113500
1.2C
Wood Burning Fireplace Insert
Qualifications Data
113500
1.2D
Wood Burning Fireplace Insert
Product Certificate
113500
1.2E
Wood Burning Fireplace Insert
Reports
113500
1.2F
Wood Burning Fireplace Insert
O&M Data
113500
1.2G
Wood Burning Fireplace Insert
Warranties
122113
1.2A
Horizontal Louver Blinds
Product Data
122113
1.2B
Horizontal Louver Blinds
Shop Drawings
122113
1.2C,D
Horizontal Louver Blinds
Samples
122113
1.2E
Horizontal Louver Blinds
Schedule
122113
1.2F
Horizontal Louver Blinds
Maintenance Data
124813
1.3A
Entrance Floor Mats and Frames
Product Data
124813
1.2B
Entrance Floor Mats and Frames
Shop Drawings
124813
1.2C,D
Entrance Floor Mats and Frames
Samples
124813
1.2E
Entrance Floor Mats and Frames
Maintenance Data
129300
1.2A
Site Furnishing
Product Data
133400
1.2A
Precast Concrete Utility Building
Manu. Literature
133400
1.2B
Precast Concrete Utility Building
Shop Drawings
133400
1.2C
Precast Concrete Utility Building
Design Calculations
133400
1.2D
Precast Concrete Utility Building
Concrete Delivery Certificates
220518
1.2A
Escutcheon for Plumbing Piping
Product Data
220519
1.2A
Meters and Gages for Plumbing Pipe
Product Data
220519
1.2B
Meters and Gages for Plumbing Pipe
Certificates
220519
1.2C
Meters and Gages for Plumbing Pipe
O&M Data
220523
1.3A
General-Duty Valves for Plumbing Piping
Product Data
220529
1.4A
Hangers and Supports for Plumbing Piping and Equipment
Product Data
220529
1.4B
Hangers and Supports for Plumbing Piping and Equipment
Welding Certificates
220553
1.2A
Identification for Plumbing Piping and Equipment
Product Data
220553
1.2B
Identification for Plumbing Piping and Equipment
Samples
220553
1.2C
Identification for Plumbing Piping and Equipment
Label Schedule
220553
1.2D,E
Identification for Plumbing Piping and Equipment
Valve Numbering Scheme & Schedule
220719
1.2A
Plumbing Piping Insulation
Product Data
220719
1.2B
Plumbing Piping Insulation
Shop Drawings
220719
1.2C
Plumbing Piping Insulation
Qualifications Data
221100
1.3A
Water Distribution Systems
Product Data
221100
1.3B
Water Distribution Systems
Plan for Disposal of Test Water
221102
1.2A
Curb Valves and Boxes
Product Data
221103
1.2A
Plumbing Appurtenances
Product Data
221103
1.2B
Plumbing Appurtenances
O&M Data
221116
1.3A
Domestic Water Piping
Product Data
221116
1.3B
Domestic Water Piping
Water Samples
221116
1.3C
Domestic Water Piping
QC Reports
221119
1.3A
Domestic Water Piping Specialties
Product Data
221119
1.3B
Domestic Water Piping Specialties
Shop Drawings
221119
1.3C
Domestic Water Piping Specialties
Test Reports
221119
1.3D
Domestic Water Piping Specialties
O&M Data
221120
1.2A
Well Equipping
Product Data
221300
1.3A
Onsite Wastewater Treatment System
Product Data
221300
1.3B
Onsite Wastewater Treatment System
Shop Drawings
221300
1.3C
Onsite Wastewater Treatment System
Coordination Drawings
221300
1.3D
Onsite Wastewater Treatment System
Tank Certificate
221316
1.3A
Sanitary Waste and Vent Piping
Product Data
221316
1.3B
Sanitary Waste and Vent Piping
Certificates
221316
1.3C
Sanitary Waste and Vent Piping
Reports
221319
1.3A
Sanitary Waste Piping Specialties
Shop Drawings
221319
1.3B
Sanitary Waste Piping Specialties
Test Reports
221319
1.3C
Sanitary Waste Piping Specialties
O&M Data
223300
1.3A
Electric, Domestic-Water Heaters
Product Data
223300
1.3B
Electric, Domestic-Water Heaters
Shop Drawings
223300
1.3C
Electric, Domestic-Water Heaters
Certificates
223300
1.3D
Electric, Domestic-Water Heaters
Labeling
223300
1.3E,F
Electric, Domestic-Water Heaters
Reports
223300
1.3G
Electric, Domestic-Water Heaters
O&M Data
223300
1.3H
Electric, Domestic-Water Heaters
Warranty
224000
1.3A
Plumbing Fixtures
Product Data
224000
1.3B
Plumbing Fixtures
Shop Drawings
224000
1.3C
Plumbing Fixtures
O&M Data
224000
1.3D
Plumbing Fixtures
Warranty
224700
1.3A
Drinking Fountains and Water Coolers
Product Data
224700
1.3B
Drinking Fountains and Water Coolers
Shop Drawings
224700
1.3C
Drinking Fountains and Water Coolers
Reports
224700
1.3D
Drinking Fountains and Water Coolers
O&M Data
230518
1.2A
Escutcheons for HVAC
Product Data
230519
1.2A
Meters and Gages for HVAC Piping
Product Data
230519
1.2B
Meters and Gages for HVAC Piping
Certificates
230519
1.2C
Meters and Gages for HVAC Piping
O&M Data
230523
1.3A
General-Duty Valves for HVAC Piping
Product Data
230529
1.4A
Hangers and Supports for Plumbing Piping and Equipment
Product Data
230529
1.4B
Hangers and Supports for Plumbing Piping and Equipment
Welding Certificate
230553
1.2A
Identification for Plumbing Piping and Equipment
Product Data
230553
1.2B
Identification for Plumbing Piping and Equipment
Samples
230553
1.2C,D,E
Identification for Plumbing Piping and Equipment
Schedule & Scheme
230593
1.3A
Testing, Adjusting, and Balancing for HVAC
Qualifications Data
230593
1.3B
Testing, Adjusting, and Balancing for HVAC
Document Examination Report
230593
1.3C
Testing, Adjusting, and Balancing for HVAC
Plan
230593
1.3D,E
Testing, Adjusting, and Balancing for HVAC
TAB Report & Sample Forms
230593
1.3F
Testing, Adjusting, and Balancing for HVAC
Calibration Reports
230713
1.2A
Duct Insulation
Product Data
230719
1.2A
HVAC Piping Insulation
Product Data
230719
1.2B
HVAC Piping Insulation
Shop Drawings
230719
1.2C
HVAC Piping Insulation
Qualifications Data
230719
1.2D,E
HVAC Piping Insulation
Reports
230900
1.4A
Instrumentation and Control for HVAC
Product Data
230900
1.4B
Instrumentation and Control for HVAC
Shop Drawings
230900
1.4C
Instrumentation and Control for HVAC
Certificates
230900
1.4D
Instrumentation and Control for HVAC
Documentation
230900
1.4E
Instrumentation and Control for HVAC
Software Upgrade Kit
230900
1.4F
Instrumentation and Control for HVAC
Qualifications Data
230900
1.4G
Instrumentation and Control for HVAC
Reports
230900
1.4H
Instrumentation and Control for HVAC
O&M Data
231123
1.4A
Facility Natural-Gas Piping
Product Data
231123
1.4B
Facility Natural-Gas Piping
Welding Certificates
231123
1.4C
Facility Natural-Gas Piping
Reports
232113
1.3A
Ground-Loop Heat Pump Piping
Product Data
232113
1.3B
Ground-Loop Heat Pump Piping
Reports
232123
1.3A
Hydronic Pumps
Product Data
232123
1.3B
Hydronic Pumps
Shop Drawings
232123
1.3C
Hydronic Pumps
O&M Data
233113
1.3A
Metal Duct
Product Data
233300
1.3A
Air Duct Accessories
Product Data
233300
1.3B
Air Duct Accessories
Shop Drawings
233300
1.3C
Air Duct Accessories
Coor. Drawings
233300
1.3D
Air Duct Accessories
Reports
233300
1.3E
Air Duct Accessories
O&M Data
233423
1.3A
HVAC Power Ventilators
Product Data
233423
1.3B
HVAC Power Ventilators
Shop Drawings
233423
1.3C
HVAC Power Ventilators
Coord. Drawings
233423
1.3D
HVAC Power Ventilators
Reports
233423
1.3E
HVAC Power Ventilators
O&M Data
233713
1.2A
Diffusers, Registers, and Grilles
Product Data
233713
1.2B
Diffusers, Registers, and Grilles
Coor. Drawings
233713
1.2C
Diffusers, Registers, and Grilles
Reports
234100
1.2A
Particulate Air Filtration
Product Data
234100
1.2B
Particulate Air Filtration
Shop Drawings
234100
1.2C
Particulate Air Filtration
O&M Data
235100
1.2A
Breechings, Chimneys, and Stacks
Product Data
235100
1.2B
Breechings, Chimneys, and Stacks
Shop Drawings
235100
1.2C
Breechings, Chimneys, and Stacks
Warranty
238146
1.2A
Water-Source Unitary Heat Pumps
Product Data
238146
1.2B
Water-Source Unitary Heat Pumps
Shop Drawings
238146
1.2C
Water-Source Unitary Heat Pumps
Certificates
238146
1.2D
Water-Source Unitary Heat Pumps
Reports
238146
1.2E
Water-Source Unitary Heat Pumps
O&M Data
238146
1.2F
Water-Source Unitary Heat Pumps
Warranty
260500
1.2A
Common Work Results for Electrical Systems
Product Data
260500
1.2B
Common Work Results for Electrical Systems
As-builts
260533
1.3A
Raceway and Boxes for Electrical Systems
Product Data
260536
1.2A
Cable Trays for Electrical Systems
Product Data
260536
1.2B
Cable Trays for Electrical Systems
Shop Drawings
260537
1.4A