About this file
Project Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 02.doc | DOC document | |
| REVISED AE511.pdf | ||
| REVISED AE405.pdf | ||
| Geotechnical Report.doc | DOC document | |
| Amendment 01.doc | DOC document | |
| REVISED MS101_F.pdf | ||
| REVISED AE406.pdf | ||
| REVISED AE404.pdf | ||
| REVISED AE303_R.pdf | ||
| 05_D2_site_id_sign D2 | — | |
| REVISED MH 504.pdf | ||
| const_rfp_solicitation.doc | DOC document | |
| BigPiney.Drawings.Final.06.12.09.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA FOREST SERVICE, R-4
BIG PINEY OFFICE
SECTION 000501 - OFFICE BUILDING
PART 1 - GENERAL
1.1 SUMMARY
A. This work includes the construction of an Office Building.
1.2 REFERENCE SPECIFICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
2006 International Building Code
2006 International Residential Code
2006 International Plumbing Code
2006 International Mechanical Code
2006 International Fuel Gas Code
2006 International Energy Conservation Code
2005 National Electrical Code
2007 National Fire Protection Association Standards 13R and 13D.
2004 Americans with Disabilities Act/Architectural Barriers Act Guidelines (ADA/ABAG) (http://www.access-board.gov/adaag/html/adaag.htm)
1.3 MEASUREMENT AND PAYMENT
A. Office Building - Measurement and Payment shall be Lump Sum Quantity (LSQ) as shown in the Schedule of Items for the office building constructed and completed ready for use. Measurement shall include all work items within 10 feet outside the building and covered porch perimeter (including utilities within those limits); and includes the concrete slab porch, and all concrete work within 10 feet of the face of the building walls. Measurement also includes all finish grading around the building including areas beyond 10 feet from the building.
1.4 RELATED WORK
A. The work shall be in accordance with the contract drawings.
B. The work shall be in accordance with the following specifications. The subsidiary specifications are referred to in the text by the Section designation only.
DIVISION 1 – GENERAL REQUIREMENTS
010250 - CONSTRUCTION STAKING
011250 - MEASUREMENT AND PAYMENT WITH ASPHALT
011900 – MOBILIZATION
013300 - SUBMITTAL PROCEDURES
014100 – QUALITY CONTROL
019113 - GENERAL COMMISSIONING REQUIREMENTS
019114 - PLUMBING SYSTEMS COMMISSIONING REQUIREMENTS
019115 - HVAC SYSTEMS COMMISSIONING REQUIREMENTS
019116 - ELECTRICAL SYSTEMS COMMISSIONING REQUIREMENTS
DIVISION 2 – EXISTING CONDITIONS
023701 - SEDIMENT AND EROSION CONTROL MEASURES
024100 - WASTE MATERIAL DISPOSAL
DIVISION 3 – CONCRETE
033000 - CAST-IN-PLACE CONCRETE
034500 - ARCHITECTURAL PRECAST CONCRETE
DIVISION 4 - MASONRY
047200 - CAST STONE
DIVISION 5 - METALS
055000 - METAL FABRICATIONS
DIVISION 6 - WOOD AND PLASTICS
061000 - ROUGH CARPENTRY
061323 - HEAVY TIMBER CONSTRUCTION
061600 - SHEATHING
061753 - SHOP-FABRICATED WOOD TRUSSES
062013 - EXTERIOR FINISH CARPENTRY
064023 - INTERIOR ARCHITECTURAL WOODWORK
066610 - MANUFACTURED TRIM AND ORMIMENTS - URETHANE
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
071113 - BITUMINOUS DAMPROOFING
072100 - THERMAL INSULATION
074113 - METAL ROOF PANELS
074213 - METAL WALL PANELS
074600 – SIDING
076200 - SHEET METAL FLASHING AND TRIM
079200 - JOINT SEALANTS
Article I.
DIVISION 8 - DOORS AND WINDOWS
Article II. DIVISION 8 - DOORS AND WINDOWS
DIVISION 8 - DOORS AND WINDOWS
081416 - FLUSH WOOD DOORS
082143 - OUT-SWING ENTRY DOORS
083113 - ACCESS DOORS AND FRAMES
085200 - ALUMINUM CLAD WOOD WINDOWS
087100 - DOOR HARDWARE
088000 - GLAZING
DIVISION 9 - FINISHES
092216 - NON-STRUCTURAL METAL FRAMING
092900 - GYPSUM BOARD
093033 - STONE TILING
095110 - ACOUSTICAL PANEL CEILINGS
096511 - RESILIENT FLOOR TILE
096530 - RESILIENT WALL BASE AND ACCESSORIES
096810 - CARPET TILE
097700 - SPECIAL WALL FINISH
099120 - INTERIOR PAINTING
099300 - STAINING AND TRANSPARENT FINISHING
099600 - HIGH-PERFORMANCE COATINGS
DIVISION 10 – SPECIALTIES
101400 - SIGNAGE
101415 - SITE IDENTIFICATION SIGN AND BASE
101550 - TOILET COMPARTMENTS
102800 - TOILET AND BATH, ACCESSORIES
105201 - FIRE PROTECTION SPECIALTIES
DIVISION 11 - EQUIPMENT
111320 - PROJECTION SCREENS AND PROJECTOR CEILING MOUNTS
113500 - WOOD BURNING FIREPLACE INSERTS
DIVISION 12 - FURNISHINGS
122113 - HORIZONTAL LOUVER BLINDS
124813 - ENTRANCE FLOOR MATS AND FRAMES
DIVISION 22 - PLUMBING
220513 - COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT
220518 - ESCUTCHEONS FOR PLUMBING PIPING
220519 - METERS AND GAGES FOR PLUMBING PIPING
220523 - GENERAL-DUTY VALVES FOR PLUMBING PIPING
220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING & EQUIPMENT
220553 - IDENTIFICATION FOR PLUMBING PIPING & EQUIPMENT
220719 - PLUMBING PIPING INSULATION
221116 - DOMESTIC WATER PIPING
221119 - DOMESTIC WATER PIPING SPECIALTIES
221316 - SANITARY WASTE AND VENT PIPING
221319 - SANITARY WASTE PIPING SPECIALTIES
223300 - ELECTRIC-DOMESTIC/WATER HEATERS
224000 - PLUMBING FIXTURES
224700 - DRINKING FOUNTAINS AND WATER COOLERS
DIVISION 23 – HEATING, VENTILATINF, AND AIR CONDITIONING
230513 - COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
230518 - ESCUTCHEONS FOR HVAC
230519 - METERS AND GAGES FOR HVAC PIPING
230523 - GENERAL-DUTY VALVES FOR HVAC PIPING
230529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
230553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC
230713 - DUCT INSULATION
230719 - HVAC PIPING INSULATION
230900 - INSTRUMENTATION AND CONTROLS FOR HVAC
230993 - SEQUENCE OF OPERATIONS FOR HVAC CONTROLS
231123 - FACILITY NATURAL-GAS PIPING
232113 - GROUND-LOOP HEAT-PUMP PIPING
232123 - HYDRONIC PUMPS
233113 - METAL DUCTS
233000 - AIR DUCT ACCESSORIES
233423 - HVAC POWER VENTILATORS
233713 - DIFFUSERS, REGISTERS, AND GRILLES
234100 - PARTICULATE AIR FILTRATION
235100 - BREACHINGS, CHIMNEYS, AND STACKS
238146 - WATER-SOURCE UNITARY HEAT PUMPS
DIVISION 26 – ELECTRICAL
260500 - COMMON WORK RESULTS FOR ELECTRICAL
260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
260533 - RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS
260536 - CABLE TRAYS FOR ELECTRICAL SYSTEMS
260537 - FLEXTRAY WIRE BASKET SUPPORT SYSTEMS
260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS
260923 - LIGHTING CONTROL DEVICES
262416 – PANELBOARDS
262713 - ELECTRICITY METERING
262726 - WIRING DEVICES
264313 - TRANSIENT-VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS
265100 - INTERIOR LIGHTING
265600 - EXTERIOR LIGHTING
DIVISION 27 – COMMUNICATIONS
270500 - COMMON WORK RESULTS FOR COMMUNICATIONS
270700 – TELECOMMUNICATIONS WIRING SYSTEMS
DIVISION #31 - EARTHWORK
311000 - CLEARING AND GRUBBING OPEN
312000 – EARTHWORK
PART 2 - PRODUCTS - Not Applicable
PART 3 - EXECUTION – Not Applicable
END OF SECTION 000501
June 2009
USDA FOREST SERVICE, R-4
BIG PINEY OFFICE
SECTION 010250 - CONSTRUCTION STAKING
PART 4 - GENERAL
4.1 SUMMARY
A. This work shall consist of the construction staking of roads, parking lots, sidewalks, signs, concrete pads, culverts, buildings, and utilities in accordance with the drawings and specifications. The work includes the furnishing of all labor, equipment, instruments, materials, transportation and other incidentals necessary to complete the construction staking in accordance with these specifications and acceptable engineering practice.
4.2 QUALITY CONTROL
A. Construction staking shall be accomplished under the direction of a Licensed Civil Engineer or Land Surveyor closely associated and familiar with construction staking; periodic visits to the project site are required.
4.3 MEASUREMENT AND PAYMENT
A. Measurement shall be lump sum for surveying and staking the project through all phases of construction.
PART 5 - PRODUCTS
5.1 GOVERNMENT-FURNISHED SURVEY CONTROL SHEETS
A. The Government will provide the contractor with a set of survey control sheets showing horizontal and vertical control for site to be staked. The Government will provide the Contractor with layout information that will include the Northing, Easting, and Elevations for centerline of roads and parking areas, edge of parking areas and corners of buildings and other structures.
5.2 STAKES
A. Identification stakes and hubs shall be of sufficient length and width to provide and solid set in the ground and to provide space for marking above ground when applicable. Other dimensions and materials may be used, such as steel reinforcing bars, wire flagging and markers, and metal pins, if approved in writing by the Contracting Officer (CO). The top 2 inches of all slope, guard, reference, clearing, and structure stakes shall be painted or marked with plastic flagging. Colors used on stakes or for flagging shall be as follows:
1. Roads and parking areas
-Orange
2. Waterlines, utilities, and culverts
-Blue
3. Sidewalks, stairs, and concrete pads
-Red
4. Buildings, excavation and grading
-Yellow
5.3 SURVEY NOTE PAPER AND BOOKS
A. Paper for survey notes shall be moisture-resistant paper. Notes shall be contained in books with covers that will protect the contents and retain the pages in numerical sequence during field use. Field notebooks or note paper shall be furnished by the contractor.
PART 6 - EXECUTION
6.1 GENERAL
A. The Contractor shall be required to provide all necessary staking and control for all phases of construction. The contractor shall use the data and information shown on the project drawings to establish the location of all facilities to be constructed under this contract. The Contractor may choose any method of establishing horizontal and vertical controls provided the following minimum precision and accuracy requirements are met.
B. Accuracy requirements:
1. Minimum position close; 1/1000
2. Vertical closure: 0.05 ft (vertical)/station (100 feet horizontal)
3. Cross section and slope stake precision:
C. Allowable deviation of cross section line projection from a true perpendicular to tangents, a true bisector of angle points, or a true radius of curves: +/-3 degrees.
D. Cross section topography measurements shall be taken so that variations in ground form a straight line connecting the cross section points will not exceed: 1.0 ft.
E. Horizontal and vertical accuracy for slope stake, slope stake references, and clearing limits. In feet or percentage of horizontal distance measured form centerline or reference stake, whichever is greater. Slope reference stakes and slope stakes: 0.15 ft or 0.6%. Clearing limits: 1.0 ft.
6.2 ESTABLISING AND REFERENCING IMPROVEMENT LOCATIONS
A. Roads and Parking Areas:
1. Slope stakes (cut and fill catch points), clearing limits, and slope stake references shall be established on both sides of the centerline at each station established. Slope stakes and slope stake references shall be located on a line at right angles to tangents and on radial lines or curves. Slope stake catch points shall be located by using the grading plans and/or profiles as shown on the drawings.
2. Slope stakes shall be set at 50-foot intervals, at significant breaks in the ground profile, culvert locations, and widening transition points. Slope stakes shall be set at 25 foot intervals around curves having a radius less than 100 feet.
B. Concrete Pads
1. Slope stakes shall be established at the corners of concrete pads. Slope stakes shall be written to reference the finish grade of the unit or pad being staked.
C. Sidewalks
1. Slope stakes (cut and fill catch points), clearing limits, and slope stake references shall be established on both sides of the centerline at each station established. Slope stakes and slope stake references shall be located on a line at right angles to tangents and on radial lines or curves. Slope stake catch points shall be located by using the grading plans and/or profiles as shown on the drawings.
2. Slope stakes shall be set at 10-foot intervals and at significant breaks in the ground profile or horizontal alignment.
D. Waterline, Sewerline, & other Utilities
1. Waterline, Sewerline, & other Utilities shall be staked at 25-foot intervals to the minimum burial depth specified on the drawings. Waterline and sewerline elevations shall be accurately staked to provide for drainage as indicated on the drawings. Grade stakes shall be established as necessary to provide the control for the construction work.
E. Buildings
1. Slope stakes and slope stake references shall be established at each corner and as necessary to provide adequate construction control.
6.3 DISCREPANCIES
A. The contractor shall compare the staked centerline horizontal and vertical alignment with the design data. Differences between previously recorded and observed elevations of bench marks shall be referred to the Contracting Officer. Differences in centerline profile elevations exceeding 1 foot at any two or more consecutive points shall be reported to the contracting Officer for evaluation and possible revision. Staking of these areas shall be deferred until the Contacting Officer resolves these differences.
6.4 VERTICAL CONTROL
A. Vertical control for construction shall be as referenced on the Drawings.
6.5 MARKING STAKES
A. All stakes shall be legibly marked, in the format agreed upon with the Contracting Officer, with a stake pencil that leaves an imprinted or with waterproof ink. Marking shall conform to the nomenclature below;
PI
Point of Intersection of tangents
PC
Point of curvature
POC
Point on curve
Pt
Point of tangency
POT
Point on tangent
RP
Reference point
P
P-line (preliminary location line)
L
L-line (final location line)
BM
Bench mark
TBM
Temporary bench mark
BT
Begin taper (any)
ET
End taper (any)
C
Cut
F
Fill
L
Centerline
D
Ditch
W
Width
6.6 SURVEY NOTES
A. All survey data shall be neatly recorded in survey books. All survey notes shall become the property of the Forest Service. Errors shall be deleted by lining out. Date, crew names and positions, instrumentation, and weather shall be recorded in the notes at the beginning of each day’s work. The party chief shall sign or initial each page of the notes immediately after the last entry for each day’s work.
B. Electronically recorded survey notes shall be consecutively numbered and headed to identify the contents. The notes shall be supported and accompanied by a bound book that records the project name and for each day identifies date, crew names and positions, instrumentation, weather, type of survey, stationing of sections between which survey was performed, and survey data or sketched that cannot be electronically recorded. The party chief shall sign or initial the electronically recorded notes and Day Book immediately after the last entry for each day’s work.
END OF SECTION 010250
APRIL 2006
USDA FOREST SERVICE, R-4
BIG PINEY OFFICE
SECTION 011250 - MEASUREMENT AND PAYMENT WITH ASPHALT
PART 7 - GENERAL
7.1 SUMMARY
A. Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work, labor, materials, equipment, and incidentals necessary to successfully complete the project will be considered as included in the payment for items shown. This section defines the method of measurements and basis of payment for work items listed in the Schedule of Items.
B. When more than one class, size, type, thickness, etc. is specified in the Schedule of Items for any pay item, suffixes will be added to the item number to differentiate between the pay items.
7.2 DETERMINATION OF QUANTITIES
A. The following measurements and calculations shall be used to determine contract quantities for payment.
1. For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting and erosion control blankets shall be along slope lines.
2. For excavation or embankment volumes, the average end area method shall be used to compute volumes. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by volume in hauling vehicles or by other three-dimensional methods.
3. For Structures, they shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions.
4. For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, piping, utilities, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed.
5. For aggregates weighed for payment, the tonnage shall not be adjusted for moisture content, unless otherwise provided for.
6. For standard manufactured items (such as fence, wire, plates, rolled shapes, pipe conduits) identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.
7. For bituminous material, volumes will be measured at 60(F or will be corrected to the volume at 60(F by using ASTM D1250 for asphalts. Emulsified asphalt will be measured at 60(F, or measured by converting the gallonage at another temperature to gallonage at 60(F by means of the following formula:
Gallons at 60(F = Gallons at A(F
1+0.00025 (A(F - 60(F)
* A(F is the temperature of the material at the time the gallonage is measured.
a. For vehicular shipments, net certified scale weights or weights based on certified volumes will be used as a basis of measurement. Measurements will be adjusted when bituminous material has been lost from the vehicle or the distributor, has been wasted, or has otherwise not been incorporated into this work. Determining true weights of hauling vehicles shall be made by weighing the empty vehicles at least once a day at the times the CO directs. Each vehicle shall bear a plainly legible identification mark.
b. When bituminous materials are shipped, net certified weights, or volume corrected for loss of foaming, can be used for computing quantities.
B. Earthwork Tolerances - Adjustments of horizontal or vertical alignment, within the tolerances specified in this contract, or shifts of balance points up to 100 feet shall be made by the contractor as necessary to produce the designed sections and to balance earthwork. Such adjustments shall not be considered as "Changes."
7.3 UNITS OF MEASUREMENT
A. Payment shall be by units defined and determined according to U.S. Standard measure and by the following:
1. Acre: Make longitudinal and transverse measurements for area computations horizontally.
2. 50lb Bag: Measurement will be for the actual number of 50lb bags of standard bentonite grout.
3. 94lb Bag: Measurement will be for the actual number of 94lb bags of standard cement or grout.
4. Cubic Yard (CY): A measurement computed by one of the following methods:
a. Excavation, Embankment, or Borrow. The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.
b. Material in Place or Stockpile. The measurement computed using the dimensions of the in-place material.
c. Material in the Delivery Vehicle. The measurement computed using measurements of material in the hauling vehicles at the point of delivery. Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.
5. Each (EA): One complete unit, which may consist of one or more parts.
6. Gallons (GAL): The quantity shall be measured by any of the following methods:
a. Measured volume in container.
b. Metered volume by approved metering system.
c. Commercially package volume.
7. Hour (HR): Measurement will be for the actual number of hours (or fraction thereof) ordered by the Contracting Officer and performed by the contractor.
8. Linear Foot (LF): Measurement of work along its length from point-to-point; parallel to the base or foundation. Do not measure overlaps.
9. Lump Sum (LS): One complete unit.
10. Mile: Measured horizontally along the centerline of each roadway, approach, or ramp.
11. Pound (LB): For sacked or packaged material, measurement will be the net weight as packed by the manufacturer.
12. Square Foot (SF): Measured on a plane parallel to the surface being measured.
13. Square Yard (SY): Measured on a plane parallel to the surface being measured.
14. Ton: Measured as a short ton consisting of 2,000 pounds.
7.4 METHOD OF MEASUREMENT
A. One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:
1. ACTUAL QUANTITIES (AQ) - These quantities are determined from actual measurements of completed work.
2. DESIGNED QUANTITIES (DQ) - These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units shown in the Schedule of Items may be authorized under any of the following conditions:
a. As a result of changes in the work authorized by the CO.
b. As a result of the CO determining that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.
c. As a result of the Contractor submitting to the CO a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.
3. LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.
4. STAKED QUANTITIES (SQ) - These quantities are determined from staked measurements prior to construction.
5. VEHICLE QUANTITIES (VQ) - These quantities are measured or weighed in hauling vehicles.
7.5 PRICE ADJUSTMENT (for Out-of-Specification Bituminous Materials)
A. Bituminous materials are defined as all types and grades of asphalt cement, liquid asphalt, emulsified asphalt, and dust oil.
B. If bituminous material fails one or more test requirements, and the Contracting Officer determines it is in the public interest to accept the material at a reduced price, the price reduction shall be based on the test results giving the largest percent price adjustment. The contractor may remove and replace the defective material or accept the adjustment.
C. The price reduction shall apply to all pay items affected.
D. Price adjustment will be based on samples taken in duplicate in accordance with AASHTO T40 under the supervision of the Contracting Officer. Samples shall be sent to an authorized laboratory. The laboratory shall test one of each duplicate sample and retain the other. When any test result is not within the specification limits, the laboratory shall immediately notify the Contractor, the supplier, and the Contracting Officer. The Contractor, after notifying the Contracting Officer, may check test the retained sample.
E. If the retained sample tests satisfactorily, the material will be accepted. If the retained sample also fails, the following schedule of price adjustments shall apply. The average of test values for the two samples will determine the basis for price adjustment, except when test results on the samples differ by more than the applicable AASHTO or ASTM Repeatability Unit; then, the test result numerically nearest the specification requirement will be used. (A repeatability unit is defined as D2S or D2S% limit for single operator precision described in ASTM C670.)
F. The schedule of price adjustments shall not apply to the following tests:
| Test |
| AASHTO Test Method |
| Spot Test |
| T102 |
| Particle Charge |
| T59 |
| Ductility |
| T51 |
G. Bituminous materials failing to meet specifications for these tests shall be removed and replaced.
H. See Table 011250-1 for the schedule of price adjustments for bituminous materials that do not meet specifications.
Table 011250-1
Schedule of Price Adjustments for Out-of-Specification Bituminous Materials.
| Application |
| Deviation from Specification Limit Measured in Reproducibility Units*. |
| Less than 1 |
| 1 but less than 2 |
| 2 but less than 3 |
| 3 or more |
| Price reduction applicable to bituminous base course and pavement mixture or to seal coat and bituminous material paid for as a separate item. |
| 0% |
| 5% |
| 25% |
| Remove & Replace |
| Price reduction applicable to bituminous material paid for as a separate item. |
| 0% |
| 10% |
| 25% |
| Remove & Replace |
* A reproducibility unit is defined as D2S or D2S% limit for multi-laboratory precision described in ASTM recommended practice C670.
The Sieve Test (AASHTO T59) results may be exempt from the Schedule of Price Adjustments provided the contractor's quality assurance program includes checking the uniformity of bituminous spread rates in increments no greater than 1 foot over the width of the spray bar and variation between increments is no greater than 5 percent.
PART 8 - PRODUCTS (NOT APPLICABLE)
PART 9 - EXECUTION (NOT APPLICABLE)
REVISION HISTORY:
PRIMARY AUTHOR: ???
5/11/2006 D. WEWER – Added 50# Bags to list of units.
END OF SECTION 011250
MAY 2006
USDA FOREST SERVICE, R-4
BIG PINEY OFFICE
SECTION 011900 - MOBILIZATION
PART 10 - GENERAL
10.1 SUMMARY
A. This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.
B. The measurement shall be lump sum for mobilization.
C. Payment:
1. Bond premiums will be reimbursed after receipt of the evidence of payment.
2. 50% of the lump sum, not to exceed 5% of the original contract amount, will be paid following completion of 5% of the original contract amount not including mobilization and bond premiums.
3. Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not including mobilization and bond premiums.
4. Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance.
5. Progress payments for mobilization and preparatory work shall be subject to retainage.
PART 11 - PRODUCTS (NOT USED)
PART 12 - EXECUTION (NOT USED)
END OF SECTION 011900
July 2005
USDA FOREST SERVICE, R-4
BIG PINEY OFFICE
SECTION 013300 - SUBMITTAL PROCEDURES
PART 13 - GENERAL
13.1 SUMMARY
A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals. See Table 013300-1 for a summary of required submittals.
B. See other specification section within this package for additional requirements on submittal.
13.2 SUBMITTAL PROCEDURES
A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
1. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.
a. The Contracting Officer (CO) reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
B. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.
1. Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.
2. If intermediate submittal is necessary, process it in same manner as initial submittal.
3. Allow 14 days for processing each re-submittal.
4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.
C. Identification: Place a permanent label or title block on each submittal for identification.
1. Indicate name of firm or entity that prepared each submittal on label or title block.
2. Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by CO.
3. Include the following information on label for processing and recording action taken:
a. Project name.
b. Date.
c. Name and address of Contractor.
d. Name of manufacturer.
e. Unique identifier, including revision number.
f. Number and title of appropriate Specification Section.
g. Drawing number and detail references, as appropriate.
h. If more than one item is shown on submittal sheet, identify item.
D. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.
E. Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.
F. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.
13.3 MEASUREMENT AND PAYMENT
A. No separate measurement and/or payment will be made for this section. Payment shall be included with work shown in the schedule of items.
PART 14 - PRODUCTS
14.1 ACTION SUBMITTALS – (Submittals requiring CO approval)
A. General: Prepare and submit Action Submittals required by individual Specification Sections.
1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document.
B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.
2. Mark each copy of each submittal to show which products and options are applicable.
3. Include the following information, as applicable:
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
c. Manufacturer's installation instructions.
d. Manufacturer's catalog cuts.
e. Wiring diagrams showing factory-installed wiring.
f. Compliance with recognized trade association standards.
g. Compliance with recognized testing agency standards.
C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.
1. Preparation: Include the following information, as applicable:
a. Dimensions.
b. Identification of products.
c. Fabrication and installation drawings.
d. Roughing-in and setting diagrams.
e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.
f. Notation of dimensions established by field measurement.
2. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.
D. Contractor's Construction Schedule: The contractor shall submit a Construction Schedule, for approval by CO, in accordance with the contract provisions within 5 day of commencement of work.
E. Samples: Prepare physical units of materials or products, including the following:
1. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.
14.2 INFORMATIONAL SUBMITTALS – (Submittals NOT requiring CO approval)
A. General: Prepare and submit Informational Submittals required by other Specification Sections.
1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will not return copies.
2. Certificates and Certifications: Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.
3. Test and Inspection Reports: Comply with requirements in Section 014100 "Quality Control."
B. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.
C. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements.
D. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment.
E. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.
PART 15 - EXECUTION
15.1 GENERAL
A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.
B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.
C. CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.
D. Submittals not required by the Contract Documents will not be reviewed and may be discarded.
E. Substitutions – Whenever materials, products, and equipment are listed by name or brand in the specifications and/or on the drawings, it is used as a measure of quality, utility, or standard. If the Contractor prefers to use any other brand or manufacturer of same quality, appearance and utility to that specified, he shall request substitution as provided below, not less than 30 days before the planned installation of the item. The Contracting Officer will approve or disapprove the request for substitution.
F. Requests for substitutions will only be considered if contractor submits the following:
1. Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution. Submit additional information if required by Contracting Officer. All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally specified item.
2. Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.
3. A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws.
4. The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.
15.2 SUBMITTAL SCHEDULE – Submittals shall be made as required by and called for in the drawings and specifications. The following table is a summary of the required submittals for the project - the table is to assist the Contractor and may not be all inclusive – additional submittals may be required by specific specifications:
TABLE 013000-1
| Spec. Section |
| Subsection |
| Section Title |
| Required Submittal |
| 014100 |
| 1.3 A |
| Quality Control |
| Contractor quality control plan |
| 014100 |
| 1.3 B |
| Quality Control |
| Permits, Licenses, and Certificates |
| 014100 |
| 1.3 C |
| Quality Control |
| Test and inspection reports |
| 014100 |
| 1.3 D |
| Quality Control |
| As-Built drawings |
| 019113 |
| 1.5A |
| General Commissioning Requirements |
| Product Data |
| 019113 |
| 3.6 & 3.8 |
| General Commissioning Requirements |
| Training Materials |
| 019114 |
| 1.6A |
| Plumbing System Commissioning Requirements |
| Reports |
| 019115 |
| 1.6A |
| HVAC System Commissioning Requirements |
| Reports |
| 023701 |
| 1.2A |
| Sediment and Erosion Control Measures |
| Erosion and Sediment Control Plan |
| 033000 |
| 1.3A |
| Cast-in-Place Concrete |
| Product Data |
| 033000 |
| 1.3B |
| Cast-in-Place Concrete |
| Design Mix |
| 033000 |
| 1.3C |
| Cast-in-Place Concrete |
| Steel Shop Drawings |
| 033000 |
| 1.3D |
| Cast-in-Place Concrete |
| Vaport Retarder Samples |
| 033000 |
| 1.3E |
| Cast-in-Place Concrete |
| Qualification Data |
| 033000 |
| 1.3F |
| Cast-in-Place Concrete |
| Material Test Reports |
| 033000 |
| 1.3G |
| Cast-in-Place Concrete |
| Material Certificates |
| 033000 |
| 1.3H |
| Cast-in-Place Concrete |
| Floor Surface Flatness |
| 033000 |
| 1.3I |
| Cast-in-Place Concrete |
| Field Quality Control Test Reports |
| 034500 |
| 1.4A |
| Precast Architectural Concrete |
| Product Data |
| 034500 |
| 1.4B |
| Precast Architectural Concrete |
| Design Mix |
| 034500 |
| 1.4C |
| Precast Architectural Concrete |
| Shop Drawings |
| 034500 |
| 1.4D |
| Precast Architectural Concrete |
| Reports |
| 047200 |
| 1.3A |
| Cast Stone |
| Product Data |
| 047200 |
| 1.3B |
| Cast Stone |
| Shop Drawings |
| 047200 |
| 1.3C,D,E |
| Cast Stone |
| Samples |
| 047200 |
| 1.3F |
| Cast Stone |
| Qualifications Data |
| 047200 |
| 1.3G |
| Cast Stone |
| Reports |
| 055000 |
| 1.3A |
| Metal Fabrications |
| Product Data |
| 055000 |
| 1.3B |
| Metal Fabrications |
| Shop Drawings |
| 061000 |
| 1.3A |
| Rough Carpentry |
| Product Data |
| 061000 |
| 1.3B |
| Rough Carpentry |
| Fastener Pattern |
| 061000 |
| 1.3C |
| Rough Carpentry |
| Certificates |
| 061000 |
| 1.3D |
| Rough Carpentry |
| Reports |
| 061323 |
| 1.3A |
| Heavy Timber Construction |
| Product Data |
| 061323 |
| 1.3B |
| Heavy Timber Construction |
| Shop Drawings |
| 061323 |
| 1.3C |
| Heavy Timber Construction |
| Samples |
| 061323 |
| 1.3D,E |
| Heavy Timber Construction |
| Certificates |
| 061600 |
| 1.2A |
| Sheathing |
| Product Data |
| 061600 |
| 1.2B |
| Sheathing |
| Reports |
| 061753 |
| 1.4A |
| Shop Fabricated Wood Trusses |
| Product Data |
| 061753 |
| 1.4B |
| Shop Fabricated Wood Trusses |
| Shop Drawings |
| 061753 |
| 1.4C,E |
| Shop Fabricated Wood Trusses |
| Certificated |
| 061753 |
| 1.4D |
| Shop Fabricated Wood Trusses |
| Qualifications Data |
| 061753 |
| 1.4F |
| Shop Fabricated Wood Trusses |
| Reports |
| 062013 |
| 1.3A |
| Exterior Finish Carpentry |
| Product Data |
| 062013 |
| 1.3B,C |
| Exterior Finish Carpentry |
| Samples |
| 062013 |
| 1.3D |
| Exterior Finish Carpentry |
| Certificated |
| 062013 |
| 1.3E |
| Exterior Finish Carpentry |
| Warranties |
| 062013 |
| 1.3F |
| Exterior Finish Carpentry |
| Reports |
| 064023 |
| 1.4A |
| Interior Architectural Wood Work |
| Product Data |
| 064023 |
| 1.4B |
| Interior Architectural Wood Work |
| Shop Drawings |
| 064023 |
| 1.4C,D,E |
| Interior Architectural Wood Work |
| Samples |
| 064023 |
| 1.4F |
| Interior Architectural Wood Work |
| Qualifications Data |
| 066610 |
| 1.3A |
| Manufactured Trim and Ornamental, Urethane |
| Product Data |
| 072113 |
| 1.2A |
| Bituminous Damp Proofing |
| Product Data |
| 072100 |
| 1.2A |
| Thermal Insulation |
| Product Data |
| 072100 |
| 1.2B,C |
| Thermal Insulation |
| Reports |
| 074114 |
| 1.4A |
| Metal Roof Panels |
| Product Data |
| 074114 |
| 1.4B |
| Metal Roof Panels |
| Shop Drawings |
| 074114 |
| 1.4C,D |
| Metal Roof Panels |
| Samples |
| 074114 |
| 1.4E |
| Metal Roof Panels |
| Reports |
| 074114 |
| 1.4F |
| Metal Roof Panels |
| Maintenance Data |
| 074114 |
| 1.4G |
| Metal Roof Panels |
| Warranties |
| 074213 |
| 1.4A |
| Metal Wall Panels |
| Product Data |
| 074213 |
| 1.4B |
| Metal Wall Panels |
| Shop Drawings |
| 074213 |
| 1.4C,D |
| Metal Wall Panels |
| Samples |
| 074213 |
| 1.4E |
| Metal Wall Panels |
| Qualifications Data |
| 074213 |
| 1.4F,G |
| Metal Wall Panels |
| Reports |
| 074213 |
| 1.4H |
| Metal Wall Panels |
| Maintenance Data |
| 074213 |
| 1.4I |
| Metal Wall Panels |
| Warranties |
| 074600 |
| 1.2A |
| Siding |
| Product Data |
| 074600 |
| 1.2B,C |
| Siding |
| Samples |
| 074600 |
| 1.2D |
| Siding |
| Reports |
| 074600 |
| 1.2E |
| Siding |
| Maintenance Data |
| 074600 |
| 1.2F |
| Siding |
| Warranties |
| 076200 |
| 1.3A |
| Sheet Metal Flashing and Trim |
| Product Data |
| 076200 |
| 1.3B |
| Sheet Metal Flashing and Trim |
| Shop Drawing |
| 076200 |
| 1.3C |
| Sheet Metal Flashing and Trim |
| Samples |
| 079200 |
| 1.2A |
| Joint Sealants |
| Product Data |
| 079200 |
| 1.2B,C |
| Joint Sealants |
| Samples |
| 079200 |
| 1.2D |
| Joint Sealants |
| Schedule |
| 079200 |
| 1.2E |
| Joint Sealants |
| Qualifications Data |
| 079200 |
| 1.2F |
| Joint Sealants |
| Certification |
| 079200 |
| 1.2G,H |
| Joint Sealants |
| Reports |
| 079200 |
| 1.2I |
| Joint Sealants |
| Warranties |
| 081416 |
| 1.2A |
| Flush Wood Doors |
| Product Data |
| 081416 |
| 1.2B,D,E |
| Flush Wood Doors |
| Material Submittal |
| 081416 |
| 1.2C |
| Flush Wood Doors |
| Shop Drawings |
| 081416 |
| 1.2F |
| Flush Wood Doors |
| Warranty |
| 082143 |
| 1.2A |
| Out-Swing Entry Doors |
| Product Data |
| 082143 |
| 1.2B |
| Out-Swing Entry Doors |
| Shop Drawings |
| 082143 |
| 1.2C |
| Out-Swing Entry Doors |
| Samples |
| 082143 |
| 1.2D |
| Out-Swing Entry Doors |
| Warranty |
| 083113 |
| 1.2A |
| Access Doors and Frames |
| Product Data |
| 083113 |
| 1.2B |
| Access Doors and Frames |
| Shop Drawings |
| 085200 |
| 1.4A |
| Aluminum Clad Wood Window |
| Product Data |
| 085200 |
| 1.4B |
| Aluminum Clad Wood Window |
| Shop Drawings |
| 085200 |
| 1.4C |
| Aluminum Clad Wood Window |
| Product Schedule |
| 085200 |
| 1.4D |
| Aluminum Clad Wood Window |
| Samples |
| 085200 |
| 1.4E |
| Aluminum Clad Wood Window |
| Product Reports |
| 085200 |
| 1.4F |
| Aluminum Clad Wood Window |
| Maintenance Data |
| 085200 |
| 1.4G |
| Aluminum Clad Wood Window |
| Warranty |
| 087100 |
| 1.2A |
| Door Hardware |
| Product Data |
| 087100 |
| 1.2B,C,D |
| Door Hardware |
| Samples |
| 087100 |
| 1.2E |
| Door Hardware |
| Product Test Report |
| 087100 |
| 1.2F |
| Door Hardware |
| Maintenance Data |
| 087100 |
| 1.2G |
| Door Hardware |
| Warranty |
| 088000 |
| 1.4A |
| Glazing |
| Product Data |
| 088000 |
| 1.4B |
| Glazing |
| Samples |
| 088000 |
| 1.4C |
| Glazing |
| Glazing Schedule |
| 088000 |
| 1.4D |
| Glazing |
| Product Certificates |
| 088000 |
| 1.4E,F,G |
| Glazing |
| Reports |
| 088000 |
| 1.4H |
| Glazing |
| Warranties |
| 092216 |
| 1.2A |
| Non-Structural Metal Framing |
| Product Data |
| 092900 |
| 1.2A |
| Gypsum Board |
| Product Data |
| 093033 |
| 1.4A |
| Stone Tiling |
| Product Data |
| 093033 |
| 1.4B |
| Stone Tiling |
| Shop Drawings |
| 093033 |
| 1.4C,D |
| Stone Tiling |
| Samples |
| 093033 |
| 1.4E |
| Stone Tiling |
| Qualifications Data |
| 093033 |
| 1.4F,G |
| Stone Tiling |
| Certificates |
| 093033 |
| 1.4H |
| Stone Tiling |
| Test Reports |
| 095110 |
| 1.4A |
| Acoustical Panel Ceilings |
| Product Data |
| 095110 |
| 1.4B |
| Acoustical Panel Ceilings |
| Coord. Drawings |
| 095110 |
| 1.4C,D |
| Acoustical Panel Ceilings |
| Samples |
| 095110 |
| 1.4E,F |
| Acoustical Panel Ceilings |
| Reports |
| 095110 |
| 1.4G |
| Acoustical Panel Ceilings |
| Maintenance Data |
| 096511 |
| 1.2A |
| Resilient Floor Tile |
| Product Data |
| 096511 |
| 1.2B |
| Resilient Floor Tile |
| Samples |
| 096511 |
| 1.2C |
| Resilient Floor Tile |
| Maintenance Data |
| 096530 |
| 1.2A |
| Resilient Wall Base and Accessories |
| Product Data |
| 096530 |
| 1.2B |
| Resilient Wall Base and Accessories |
| Samples |
| 096810 |
| 1.2A |
| Carpet Tile |
| Product Data |
| 096810 |
| 1.2B |
| Carpet Tile |
| Samples |
| 096810 |
| 1.2C |
| Carpet Tile |
| Maintenance Data |
| 097700 |
| 1.2A |
| Special Wall Finishes |
| Product Data |
| 097700 |
| 1.2B |
| Special Wall Finishes |
| Samples |
| 097700 |
| 1.2C |
| Special Wall Finishes |
| Reports |
| 097700 |
| 1.2D |
| Special Wall Finishes |
| Maintenance Data |
| 099120 |
| 1.2A |
| Interior Painting |
| Product Data |
| 099120 |
| 1.2B,C |
| Interior Painting |
| Samples |
| 099120 |
| 1.2D |
| Interior Painting |
| Product List |
| 099300 |
| 1.2A |
| Staining and Transparent Finishing |
| Product Data |
| 099300 |
| 1.2B,C |
| Staining and Transparent Finishing |
| Samples |
| 099300 |
| 1.2D |
| Staining and Transparent Finishing |
| Product List |
| 099600 |
| 1.2A |
| High-Performance Coatings |
| Product Data |
| 099600 |
| 1.2B,C |
| High-Performance Coatings |
| Samples |
| 099600 |
| 1.2D |
| High-Performance Coatings |
| Product List |
| 101400 |
| 1.3A |
| Signage |
| Product Data |
| 101400 |
| 1.3B |
| Signage |
| Shop Drawings |
| 101400 |
| 1.3C,D |
| Signage |
| Samples |
| 101400 |
| 1.3E |
| Signage |
| Sign Schedule |
| 101400 |
| 1.3F |
| Signage |
| Maintenance Data |
| 101400 |
| 1.3G |
| Signage |
| Warranty |
| 101401 |
| 1.3A |
| Signs (Exterior) |
| Sign List |
| 101550 |
| 1.3A |
| Toilet Compartments |
| Product Data |
| 101550 |
| 1.3B |
| Toilet Compartments |
| Shop Drawings |
| 101550 |
| 1.3C,D |
| Toilet Compartments |
| Samples |
| 102800 |
| 1.2A |
| Toilet and Bath Accessories |
| Product Data |
| 102800 |
| 1.2B |
| Toilet and Bath Accessories |
| Product Schedule |
| 102800 |
| 1.2C |
| Toilet and Bath Accessories |
| Maintenance Data |
| 105201 |
| 1.2A |
| Fire-Protection Specialties |
| Product Data |
| 105201 |
| 1.2B |
| Fire-Protection Specialties |
| Samples |
| 105201 |
| 1.2C |
| Fire-Protection Specialties |
| Maintenance Data |
| 111320 |
| 1.3A |
| Projection Screens and Projector Ceiling Mounts |
| Product Data |
| 111320 |
| 1.3B |
| Projection Screens and Projector Ceiling Mounts |
| Shop Drawings |
| 111320 |
| 1.3C |
| Projection Screens and Projector Ceiling Mounts |
| Samples |
| 111320 |
| 1.3D |
| Projection Screens and Projector Ceiling Mounts |
| Maintenance Data |
| 113500 |
| 1.2A |
| Wood Burning Fireplace Insert |
| Product Data |
| 113500 |
| 1.2B |
| Wood Burning Fireplace Insert |
| Product Schedule |
| 113500 |
| 1.2C |
| Wood Burning Fireplace Insert |
| Qualifications Data |
| 113500 |
| 1.2D |
| Wood Burning Fireplace Insert |
| Product Certificate |
| 113500 |
| 1.2E |
| Wood Burning Fireplace Insert |
| Reports |
| 113500 |
| 1.2F |
| Wood Burning Fireplace Insert |
| O&M Data |
| 113500 |
| 1.2G |
| Wood Burning Fireplace Insert |
| Warranties |
| 122113 |
| 1.2A |
| Horizontal Louver Blinds |
| Product Data |
| 122113 |
| 1.2B |
| Horizontal Louver Blinds |
| Shop Drawings |
| 122113 |
| 1.2C,D |
| Horizontal Louver Blinds |
| Samples |
| 122113 |
| 1.2E |
| Horizontal Louver Blinds |
| Schedule |
| 122113 |
| 1.2F |
| Horizontal Louver Blinds |
| Maintenance Data |
| 124813 |
| 1.3A |
| Entrance Floor Mats and Frames |
| Product Data |
| 124813 |
| 1.2B |
| Entrance Floor Mats and Frames |
| Shop Drawings |
| 124813 |
| 1.2C,D |
| Entrance Floor Mats and Frames |
| Samples |
| 124813 |
| 1.2E |
| Entrance Floor Mats and Frames |
| Maintenance Data |
| 129300 |
| 1.2A |
| Site Furnishing |
| Product Data |
| 133400 |
| 1.2A |
| Precast Concrete Utility Building |
| Manu. Literature |
| 133400 |
| 1.2B |
| Precast Concrete Utility Building |
| Shop Drawings |
| 133400 |
| 1.2C |
| Precast Concrete Utility Building |
| Design Calculations |
| 133400 |
| 1.2D |
| Precast Concrete Utility Building |
| Concrete Delivery Certificates |
| 220518 |
| 1.2A |
| Escutcheon for Plumbing Piping |
| Product Data |
| 220519 |
| 1.2A |
| Meters and Gages for Plumbing Pipe |
| Product Data |
| 220519 |
| 1.2B |
| Meters and Gages for Plumbing Pipe |
| Certificates |
| 220519 |
| 1.2C |
| Meters and Gages for Plumbing Pipe |
| O&M Data |
| 220523 |
| 1.3A |
| General-Duty Valves for Plumbing Piping |
| Product Data |
| 220529 |
| 1.4A |
| Hangers and Supports for Plumbing Piping and Equipment |
| Product Data |
| 220529 |
| 1.4B |
| Hangers and Supports for Plumbing Piping and Equipment |
| Welding Certificates |
| 220553 |
| 1.2A |
| Identification for Plumbing Piping and Equipment |
| Product Data |
| 220553 |
| 1.2B |
| Identification for Plumbing Piping and Equipment |
| Samples |
| 220553 |
| 1.2C |
| Identification for Plumbing Piping and Equipment |
| Label Schedule |
| 220553 |
| 1.2D,E |
| Identification for Plumbing Piping and Equipment |
| Valve Numbering Scheme & Schedule |
| 220719 |
| 1.2A |
| Plumbing Piping Insulation |
| Product Data |
| 220719 |
| 1.2B |
| Plumbing Piping Insulation |
| Shop Drawings |
| 220719 |
| 1.2C |
| Plumbing Piping Insulation |
| Qualifications Data |
| 221100 |
| 1.3A |
| Water Distribution Systems |
| Product Data |
| 221100 |
| 1.3B |
| Water Distribution Systems |
| Plan for Disposal of Test Water |
| 221102 |
| 1.2A |
| Curb Valves and Boxes |
| Product Data |
| 221103 |
| 1.2A |
| Plumbing Appurtenances |
| Product Data |
| 221103 |
| 1.2B |
| Plumbing Appurtenances |
| O&M Data |
| 221116 |
| 1.3A |
| Domestic Water Piping |
| Product Data |
| 221116 |
| 1.3B |
| Domestic Water Piping |
| Water Samples |
| 221116 |
| 1.3C |
| Domestic Water Piping |
| QC Reports |
| 221119 |
| 1.3A |
| Domestic Water Piping Specialties |
| Product Data |
| 221119 |
| 1.3B |
| Domestic Water Piping Specialties |
| Shop Drawings |
| 221119 |
| 1.3C |
| Domestic Water Piping Specialties |
| Test Reports |
| 221119 |
| 1.3D |
| Domestic Water Piping Specialties |
| O&M Data |
| 221120 |
| 1.2A |
| Well Equipping |
| Product Data |
| 221300 |
| 1.3A |
| Onsite Wastewater Treatment System |
| Product Data |
| 221300 |
| 1.3B |
| Onsite Wastewater Treatment System |
| Shop Drawings |
| 221300 |
| 1.3C |
| Onsite Wastewater Treatment System |
| Coordination Drawings |
| 221300 |
| 1.3D |
| Onsite Wastewater Treatment System |
| Tank Certificate |
| 221316 |
| 1.3A |
| Sanitary Waste and Vent Piping |
| Product Data |
| 221316 |
| 1.3B |
| Sanitary Waste and Vent Piping |
| Certificates |
| 221316 |
| 1.3C |
| Sanitary Waste and Vent Piping |
| Reports |
| 221319 |
| 1.3A |
| Sanitary Waste Piping Specialties |
| Shop Drawings |
| 221319 |
| 1.3B |
| Sanitary Waste Piping Specialties |
| Test Reports |
| 221319 |
| 1.3C |
| Sanitary Waste Piping Specialties |
| O&M Data |
| 223300 |
| 1.3A |
| Electric, Domestic-Water Heaters |
| Product Data |
| 223300 |
| 1.3B |
| Electric, Domestic-Water Heaters |
| Shop Drawings |
| 223300 |
| 1.3C |
| Electric, Domestic-Water Heaters |
| Certificates |
| 223300 |
| 1.3D |
| Electric, Domestic-Water Heaters |
| Labeling |
| 223300 |
| 1.3E,F |
| Electric, Domestic-Water Heaters |
| Reports |
| 223300 |
| 1.3G |
| Electric, Domestic-Water Heaters |
| O&M Data |
| 223300 |
| 1.3H |
| Electric, Domestic-Water Heaters |
| Warranty |
| 224000 |
| 1.3A |
| Plumbing Fixtures |
| Product Data |
| 224000 |
| 1.3B |
| Plumbing Fixtures |
| Shop Drawings |
| 224000 |
| 1.3C |
| Plumbing Fixtures |
| O&M Data |
| 224000 |
| 1.3D |
| Plumbing Fixtures |
| Warranty |
| 224700 |
| 1.3A |
| Drinking Fountains and Water Coolers |
| Product Data |
| 224700 |
| 1.3B |
| Drinking Fountains and Water Coolers |
| Shop Drawings |
| 224700 |
| 1.3C |
| Drinking Fountains and Water Coolers |
| Reports |
| 224700 |
| 1.3D |
| Drinking Fountains and Water Coolers |
| O&M Data |
| 230518 |
| 1.2A |
| Escutcheons for HVAC |
| Product Data |
| 230519 |
| 1.2A |
| Meters and Gages for HVAC Piping |
| Product Data |
| 230519 |
| 1.2B |
| Meters and Gages for HVAC Piping |
| Certificates |
| 230519 |
| 1.2C |
| Meters and Gages for HVAC Piping |
| O&M Data |
| 230523 |
| 1.3A |
| General-Duty Valves for HVAC Piping |
| Product Data |
| 230529 |
| 1.4A |
| Hangers and Supports for Plumbing Piping and Equipment |
| Product Data |
| 230529 |
| 1.4B |
| Hangers and Supports for Plumbing Piping and Equipment |
| Welding Certificate |
| 230553 |
| 1.2A |
| Identification for Plumbing Piping and Equipment |
| Product Data |
| 230553 |
| 1.2B |
| Identification for Plumbing Piping and Equipment |
| Samples |
| 230553 |
| 1.2C,D,E |
| Identification for Plumbing Piping and Equipment |
| Schedule & Scheme |
| 230593 |
| 1.3A |
| Testing, Adjusting, and Balancing for HVAC |
| Qualifications Data |
| 230593 |
| 1.3B |
| Testing, Adjusting, and Balancing for HVAC |
| Document Examination Report |
| 230593 |
| 1.3C |
| Testing, Adjusting, and Balancing for HVAC |
| Plan |
| 230593 |
| 1.3D,E |
| Testing, Adjusting, and Balancing for HVAC |
| TAB Report & Sample Forms |
| 230593 |
| 1.3F |
| Testing, Adjusting, and Balancing for HVAC |
| Calibration Reports |
| 230713 |
| 1.2A |
| Duct Insulation |
| Product Data |
| 230719 |
| 1.2A |
| HVAC Piping Insulation |
| Product Data |
| 230719 |
| 1.2B |
| HVAC Piping Insulation |
| Shop Drawings |
| 230719 |
| 1.2C |
| HVAC Piping Insulation |
| Qualifications Data |
| 230719 |
| 1.2D,E |
| HVAC Piping Insulation |
| Reports |
| 230900 |
| 1.4A |
| Instrumentation and Control for HVAC |
| Product Data |
| 230900 |
| 1.4B |
| Instrumentation and Control for HVAC |
| Shop Drawings |
| 230900 |
| 1.4C |
| Instrumentation and Control for HVAC |
| Certificates |
| 230900 |
| 1.4D |
| Instrumentation and Control for HVAC |
| Documentation |
| 230900 |
| 1.4E |
| Instrumentation and Control for HVAC |
| Software Upgrade Kit |
| 230900 |
| 1.4F |
| Instrumentation and Control for HVAC |
| Qualifications Data |
| 230900 |
| 1.4G |
| Instrumentation and Control for HVAC |
| Reports |
| 230900 |
| 1.4H |
| Instrumentation and Control for HVAC |
| O&M Data |
| 231123 |
| 1.4A |
| Facility Natural-Gas Piping |
| Product Data |
| 231123 |
| 1.4B |
| Facility Natural-Gas Piping |
| Welding Certificates |
| 231123 |
| 1.4C |
| Facility Natural-Gas Piping |
| Reports |
| 232113 |
| 1.3A |
| Ground-Loop Heat Pump Piping |
| Product Data |
| 232113 |
| 1.3B |
| Ground-Loop Heat Pump Piping |
| Reports |
| 232123 |
| 1.3A |
| Hydronic Pumps |
| Product Data |
| 232123 |
| 1.3B |
| Hydronic Pumps |
| Shop Drawings |
| 232123 |
| 1.3C |
| Hydronic Pumps |
| O&M Data |
| 233113 |
| 1.3A |
| Metal Duct |
| Product Data |
| 233300 |
| 1.3A |
| Air Duct Accessories |
| Product Data |
| 233300 |
| 1.3B |
| Air Duct Accessories |
| Shop Drawings |
| 233300 |
| 1.3C |
| Air Duct Accessories |
| Coor. Drawings |
| 233300 |
| 1.3D |
| Air Duct Accessories |
| Reports |
| 233300 |
| 1.3E |
| Air Duct Accessories |
| O&M Data |
| 233423 |
| 1.3A |
| HVAC Power Ventilators |
| Product Data |
| 233423 |
| 1.3B |
| HVAC Power Ventilators |
| Shop Drawings |
| 233423 |
| 1.3C |
| HVAC Power Ventilators |
| Coord. Drawings |
| 233423 |
| 1.3D |
| HVAC Power Ventilators |
| Reports |
| 233423 |
| 1.3E |
| HVAC Power Ventilators |
| O&M Data |
| 233713 |
| 1.2A |
| Diffusers, Registers, and Grilles |
| Product Data |
| 233713 |
| 1.2B |
| Diffusers, Registers, and Grilles |
| Coor. Drawings |
| 233713 |
| 1.2C |
| Diffusers, Registers, and Grilles |
| Reports |
| 234100 |
| 1.2A |
| Particulate Air Filtration |
| Product Data |
| 234100 |
| 1.2B |
| Particulate Air Filtration |
| Shop Drawings |
| 234100 |
| 1.2C |
| Particulate Air Filtration |
| O&M Data |
| 235100 |
| 1.2A |
| Breechings, Chimneys, and Stacks |
| Product Data |
| 235100 |
| 1.2B |
| Breechings, Chimneys, and Stacks |
| Shop Drawings |
| 235100 |
| 1.2C |
| Breechings, Chimneys, and Stacks |
| Warranty |
| 238146 |
| 1.2A |
| Water-Source Unitary Heat Pumps |
| Product Data |
| 238146 |
| 1.2B |
| Water-Source Unitary Heat Pumps |
| Shop Drawings |
| 238146 |
| 1.2C |
| Water-Source Unitary Heat Pumps |
| Certificates |
| 238146 |
| 1.2D |
| Water-Source Unitary Heat Pumps |
| Reports |
| 238146 |
| 1.2E |
| Water-Source Unitary Heat Pumps |
| O&M Data |
| 238146 |
| 1.2F |
| Water-Source Unitary Heat Pumps |
| Warranty |
| 260500 |
| 1.2A |
| Common Work Results for Electrical Systems |
| Product Data |
| 260500 |
| 1.2B |
| Common Work Results for Electrical Systems |
| As-builts |
| 260533 |
| 1.3A |
| Raceway and Boxes for Electrical Systems |
| Product Data |
| 260536 |
| 1.2A |
| Cable Trays for Electrical Systems |
| Product Data |
| 260536 |
| 1.2B |
| Cable Trays for Electrical Systems |
| Shop Drawings |
| 260537 |
| 1.4A |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .