SUPPORTING_DOCUMENT_D_-__SCHEDULE_OF_ITEMS_SPREADSHEET.pdf

PDF 68 KB Posted

Attached to
Redfish Lake Road Phase 2 Project 2017 - Amended Federal contract opportunity
Solicitation number
AG-0261-S-17-0091
Issued by
Department of Agriculture Forest Service R4-Intermountain Region

About this file

SUPPORT DOCUMENT D

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPPORTING DOCUMENT – D

AG-0261-S-17-0091

REDFISH LAKE ROAD PHASE 2 – NUMBER 2

PROJECT 2017

SCHEDULE OF ITEMS SPREADSHEET

3 Pages (including this header page)

BASE BID

Item No. Description *Method of Measure Quantity Unit Unit Price Total Price 15101. Mobilization LSQ 1 Lump Sum $0.00 15201. Construction Staking, Precision Class A, Tolerance Class B LSQ 1 Lump Sum $0.00 15401. Contractor Testing LSQ 1 Lump Sum $0.00 15701. Silt Fence AQ 250 Lineal Foot $0.00 15702. Straw Wattles AQ 75 Lineal Foot $0.00 15703. Stabilized Construction Entrances CQ 3 Each $0.00 20101. Clearing and Grubbing LSQ 1 Lump Sum $0.00

20102.

Slash, Hauling and Spreading Over Staging Area, Waste Disposal Site, & Decommissioned Roadway LSQ 1 Lump Sum $0.00

20301. Removal of Structures and Obstructions LSQ 1 Lump Sum $0.00 20302. Fence Removal LSQ 424 Lump Sum $0.00

20401.

Roadway Excavation Including Haul, Subgrade Preparation, Scarification, Watering, and Compaction AQ 1 Lineal Foot $0.00

20402. Select Borrow Including Haul, Watering, and Compaction AQ 1500 Lineal Foot $0.00 20403. Rock Excavation CQ 250 Each $0.00

20404.

Roadway Embankment Including Haul, Subgrade Preparation, Scarification, Watering, and Compaction LSQ 1 Lump Sum $0.00

20405. Waste, Haul and Disposal of Unsuitable or Excess Material LSQ 2500 Lump Sum $0.00 20406. Barrier Rock Placement Complete LSQ 290 Lump Sum $0.00 20501. Controlled Rock Blasting LSQ 500 Lump Sum $0.00 20701. Earthwork Geotextile Type II-A AQ 19677 Cubic Yard $0.00 21101. Roadway Obliteration, Asphalt Pavement Removal AQ 6557 Cubic Yard $0.00 21102. Roadway Obliteration, Crushed Gravel Base Removal LSQ 730 Lump Sum $0.00 21103. Roadway Obliteration, Full Recontouring (Area 1) AQ 1 Cubic Yard $0.00 21104. Roadway Obliteration, Full Recontouring (Area 2) AQ 1 Each $0.00 21105. Roadway Obliteration, Full Recontouring (Area 3) AQ 1 Lineal Foot $0.00 25101. Placed Riprap, Class 3 CQ 115 Square Yard $0.00

30101.

3/4"-0" Crushed Aggregate Base, Including Haul, Watering, and Compaction CQ 3130 Square Yard $0.00

41801. Warm Mix Asphalt (WMA) Concrete Pavement CQ 3105 Cubic Yard $0.00

60201.

18-Inch Corrugated Steel Pipe, 0.079-Inch Thickness, Including Pre-Fab Flared End Sections, Excavation, Bedding, Backfill and Compaction LSQ 99 Lump Sum $0.00

60202.

24-Inch Corrugated Steel Pipe, 0.079-Inch Thickness, Including Pre-Fab Flared End Sections, Excavation, Bedding, Backfill and Compaction AQ 54 Cubic Yard $0.00

60901. Precast Colored Concrete Wheel Stop AQ 32 Cubic Yard $0.00 61101. Cut & Cap Existing Waterline AQ 1 Ton $0.00 61801. Resetting Precast Concrete Barrier AQ 2 Lineal Foot $0.00 61901. Steel Gate, Type 1 AQ 1 Lineal Foot $0.00 61902. Steel Gate, Type 2 LSQ 1 Lump Sum $0.00 62501. Seeding (Upland) CQ 8.4 Each $0.00 62502. Seeding (Wetland) CQ 0.6 Each $0.00 63301. Permanent Signing CQ 1 Each $0.00 63302. Removing and Resetting Bulletin Board Complete CQ 1 Acre $0.00 63303. Removing and Resetting Fee Tube Complete LSQ 1 Lump Sum $0.00 63401. Permanent Pavement Striping LSQ 1 Lump Sum $0.00 63501. Temporary Traffic Control LSQ 1 Lump Sum $0.00

$0.00

Option Item #1 (Paved Trail) Item No. Description *Method of Measure Quantity Unit Unit Price Total Price 15101(1). Mobilization LSQ 1 Lump Sum $0.00 15201(1). Construction Staking, Precision Class A, Tolerance Class B LSQ 1 Lump Sum $0.00 15401(1). Contractor Testing LSQ 1 Lump Sum $0.00 20101(1). Clearing and Grubbing LSQ 1 Lump Sum $0.00

20102(1).

Slash, Hauling and Spreading over Decommissioned Roadways LSQ 1 Lump Sum $0.00

20301(1). Fence Removal CQ 380 Lineal Foot $0.00

20401(1).

Roadway Excavation Including Haul, Subgrade Preparation, Scarification, Watering, and Compaction LSQ 1 Lump Sum $0.00

20402(1). Select Borrow Including Haul, Watering, and Compaction AQ 50 Cubic Yard $0.00

20403(1).

Roadway Embankment Including Haul, Subgrade Preparation, Scarification, Watering, and Compaction LSQ 1 Lump Sum $0.00

TOTAL PRICE (ALL ITEMS - Base Bid)

PART I - THE SCHEDULE

SECTION B - SUPPLIES OR SERVICES AND PRICES

Sawtooth National Forest Stanley, ID

Phase 2 Redfish Lake Road Improvements Project 2017

20701(1). Earthwork Geotextile Type II-A CQ 1260 Square Yard $0.00 21101(1). Roadway Obliteration - Full Recontouring (Trail) LSQ 1 Lump Sum $0.00 25101(1). Placed Riprap, Class 3 AQ 10 Cubic Yard $0.00

30101(1).

3/4"-0" Crushed Aggregate Base, Including Haul, Watering, and Compaction AQ 155 Cubic Yard $0.00

41801(1). Warm Mix Asphalt (WMA) Concrete Pavement AQ 162 Ton $0.00

60201(1).

18-Inch Corrugated Steel Pipe, 0.079-Inch Thickness, Including Pre-Fab Flared End Sections, Excavation, Bedding, Backfill and Compaction AQ 39 Lineal Foot $0.00

62501(1). Seeding (Upland) CQ 0.25 Acre $0.00 62502(1). Seeding (Wetland) CQ 0.30 Acre $0.00

$0.00 $0.00

Option Item #2 (Existing Pavement Repair) Item No. Description *Method of Measure Quantity Unit Unit Price Total Price 15101(2). Mobilization LSQ 1 Lump Sum $0.00 21101(2). Roadway Obliteration - Asphalt Removal AQ 242 Square Yard $0.00

30101(2).

3/4"-0" Crushed Aggregate Base, Including Haul, Watering, and Compaction AQ 25 Cubic Yard $0.00

41801(2). Warm Mix Asphalt (WMA) Concrete Pavement AQ 45 Ton $0.00 63501(2). Temporary Traffic Control LSQ 1 Lump Sum $0.00

$0.00 $0.00

TOTAL PRICE (ALL ITEMS - Option Item #1) GRAND TOTAL PRICE (ALL ITEMS - Base Bid PLUS Option Item #1)

* Designated Method of Measurement AQ - Actual Quantities; CQ - Contract Quantities; LSQ - Lump Sum Quantities

TOTAL PRICE (ALL ITEMS - Option Item #2) GRAND TOTAL PRICE (ALL ITEMS - Base Bid PLUS Option Item #1 PLUS Option Item #2)

SUPPORTING DOCUMENT D - SCHEDULE OF ITEMS SPREADSHEET
3_SectionB_Schedule of Items
Opinion of Cost

File details come from the government source that posted it. Updated .