SCHEDULE OF ITEMS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMENDMENT_2_(2).pdf | ||
| AMENDMENT_1.pdf | ||
| SUPPORT_DOCUMENT_B_-_SPECIFICATIONS.pdf | ||
| SUPPORTING_DOCUMENT__C_-_TEST_HOLE_EXCAVATION_SUMMARY-GEO_TECH_REPORT.pdf | ||
| SUPPORTING_DOCUMENT_D_-__SCHEDULE_OF_ITEMS_SPREADSHEET.pdf | ||
| SUPPORT_DOCUMENT_E_-_WORKERS_COMP_VERIFICATION_AND_PAST_PERFORMANCE_QUESTIONAIRE.pdf | ||
| AG-0261-S-17-0091_REDFISH_LAKE_ROAD_PHASE_2-NUMBER_2_PROJECT_2017.pdf | ||
| SUPPORT_DOCUMENT_A_-_PROJECT_PLANS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Opinion of Cost
| PART I - THE SCHEDULE | ||||||
| SECTION B - SUPPLIES OR SERVICES AND PRICES | ||||||
| Phase 2 Redfish Lake Road Improvements Project 2017 | ||||||
| Sawtooth National Forest | ||||||
| Stanley, ID | ||||||
| BASE BID | ||||||
| Item No. | Description | *Method of Measure | Quantity | Unit | Unit Price | Total Price |
| 15101. | Mobilization | LSQ | 1 | Lump Sum | $0.00 | |
| 15201. | Construction Staking, Precision Class A, Tolerance Class B | LSQ | 1 | Lump Sum | $0.00 | |
| 15401. | Contractor Testing | LSQ | 1 | Lump Sum | $0.00 | |
| 15701. | Silt Fence | AQ | 250 | Lineal Foot | $0.00 | |
| 15702. | Straw Wattles | AQ | 75 | Lineal Foot | $0.00 | |
| 15703. | Stabilized Construction Entrances | CQ | 3 | Each | $0.00 | |
| 20101. | Clearing and Grubbing | LSQ | 1 | Lump Sum | $0.00 | |
| 20102. | Slash, Hauling and Spreading Over Staging Area, Waste Disposal Site, & Decommissioned Roadway | LSQ | 1 | Lump Sum | $0.00 | |
| 20301. | Removal of Structures and Obstructions | LSQ | 1 | Lump Sum | $0.00 | |
| 20302. | Fence Removal | CQ | 424 | Lineal Foot | $0.00 | |
| 20401. | Roadway Excavation Including Haul, Subgrade Preparation, Scarification, Watering, and Compaction | LSQ | 1 | Lump Sum | $0.00 | |
| 20402. | Select Borrow Including Haul, Watering, and Compaction | AQ | 1500 | Cubic Yard | $0.00 | |
| 20403. | Rock Excavation | AQ | 250 | Cubic Yard | $0.00 | |
| 20404. | Roadway Embankment Including Haul, Subgrade Preparation, Scarification, Watering, and Compaction | LSQ | 1 | Lump Sum | $0.00 | |
| 20405. | Waste, Haul and Disposal of Unsuitable or Excess Material | AQ | 2500 | Cubic Yard | $0.00 | |
| 20406. | Barrier Rock Placement Complete | AQ | 290 | Each | $0.00 | |
| 20501. | Controlled Rock Blasting | AQ | 500 | Square Foot | $0.00 | |
| 20701. | Earthwork Geotextile Type II-A | CQ | 19677 | Square Yard | $0.00 | |
| 21101. | Roadway Obliteration, Asphalt Pavement Removal | CQ | 6557 | Square Yard | $0.00 | |
| 21102. | Roadway Obliteration, Crushed Gravel Base Removal | CQ | 730 | Cubic Yard | $0.00 | |
| 21103. | Roadway Obliteration, Full Recontouring (Area 1) | LSQ | 1 | Lump Sum | $0.00 | |
| 21104. | Roadway Obliteration, Full Recontouring (Area 2) | LSQ | 1 | Lump Sum | $0.00 | |
| 21105. | Roadway Obliteration, Full Recontouring (Area 3) | LSQ | 1 | Lump Sum | $0.00 | |
| 25101. | Placed Riprap, Class 3 | AQ | 115 | Cubic Yard | $0.00 | |
| 30101. | 3/4"-0" Crushed Aggregate Base, Including Haul, Watering, and Compaction | AQ | 3130 | Cubic Yard | $0.00 | |
| 41801. | Warm Mix Asphalt (WMA) Concrete Pavement | AQ | 3105 | Ton | $0.00 | |
| 60201. | 18-Inch Corrugated Steel Pipe, 0.079-Inch Thickness, Including Pre-Fab Flared End Sections, Excavation, Bedding, Backfill and Compaction | AQ | 99 | Lineal Foot | $0.00 | |
| 60202. | 24-Inch Corrugated Steel Pipe, 0.079-Inch Thickness, Including Pre-Fab Flared End Sections, Excavation, Bedding, Backfill and Compaction | AQ | 54 | Lineal Foot | $0.00 | |
| 60901. | Precast Colored Concrete Wheel Stop | CQ | 32 | Each | $0.00 | |
| 61101. | Cut & Cap Existing Waterline | LSQ | 1 | Lump Sum | $0.00 | |
| 61801. | Resetting Precast Concrete Barrier | CQ | 2 | Each | $0.00 | |
| 61901. | Steel Gate, Type 1 | CQ | 1 | Each | $0.00 | |
| 61902. | Steel Gate, Type 2 | CQ | 1 | Each | $0.00 | |
| 62501. | Seeding (Upland) | CQ | 8.4 | Acre | $0.00 | |
| 62502. | Seeding (Wetland) | CQ | 0.6 | Acre | $0.00 | |
| 63301. | Permanent Signing | LSQ | 1 | Lump Sum | $0.00 | |
| 63302. | Removing and Resetting Bulletin Board Complete | LSQ | 1 | Lump Sum | $0.00 | |
| 63303. | Removing and Resetting Fee Tube Complete | LSQ | 1 | Lump Sum | $0.00 | |
| 63401. | Permanent Pavement Striping | LSQ | 1 | Lump Sum | $0.00 | |
| 63501. | Temporary Traffic Control | LSQ | 1 | Lump Sum | $0.00 | |
| TOTAL PRICE (ALL ITEMS - Base Bid) | $0.00 |
| Option Item #1 (Paved Trail) | ||||||
| Item No. | Description | *Method of Measure | Quantity | Unit | Unit Price | Total Price |
| 15101(1). | Mobilization | LSQ | 1 | Lump Sum | $0.00 | |
| 15201(1). | Construction Staking, Precision Class A, Tolerance Class B | LSQ | 1 | Lump Sum | $0.00 | |
| 15401(1). | Contractor Testing | LSQ | 1 | Lump Sum | $0.00 | |
| 20101(1). | Clearing and Grubbing | LSQ | 1 | Lump Sum | $0.00 | |
| 20102(1). | Slash, Hauling and Spreading over Decommissioned Roadways | LSQ | 1 | Lump Sum | $0.00 | |
| 20301(1). | Fence Removal | CQ | 380 | Lineal Foot | $0.00 | |
| 20401(1). | Roadway Excavation Including Haul, Subgrade Preparation, Scarification, Watering, and Compaction | LSQ | 1 | Lump Sum | $0.00 | |
| 20402(1). | Select Borrow Including Haul, Watering, and Compaction | AQ | 50 | Cubic Yard | $0.00 | |
| 20403(1). | Roadway Embankment Including Haul, Subgrade Preparation, Scarification, Watering, and Compaction | LSQ | 1 | Lump Sum | $0.00 | |
| 20701(1). | Earthwork Geotextile Type II-A | CQ | 1260 | Square Yard | $0.00 | |
| 21101(1). | Roadway Obliteration - Full Recontouring (Trail) | LSQ | 1 | Lump Sum | $0.00 | |
| 25101(1). | Placed Riprap, Class 3 | AQ | 10 | Cubic Yard | $0.00 | |
| 30101(1). | 3/4"-0" Crushed Aggregate Base, Including Haul, Watering, and Compaction | AQ | 155 | Cubic Yard | $0.00 | |
| 41801(1). | Warm Mix Asphalt (WMA) Concrete Pavement | AQ | 162 | Ton | $0.00 | |
| 60201(1). | 18-Inch Corrugated Steel Pipe, 0.079-Inch Thickness, Including Pre-Fab Flared End Sections, Excavation, Bedding, Backfill and Compaction | AQ | 39 | Lineal Foot | $0.00 | |
| 62501(1). | Seeding (Upland) | CQ | 0.25 | Acre | $0.00 | |
| 62502(1). | Seeding (Wetland) | CQ | 0.30 | Acre | $0.00 | |
| TOTAL PRICE (ALL ITEMS - Option Item #1) | $0.00 | |||||
| GRAND TOTAL PRICE (ALL ITEMS - Base Bid PLUS Option Item #1) | $0.00 |
| Option Item #2 (Existing Pavement Repair) | ||||||
| Item No. | Description | *Method of Measure | Quantity | Unit | Unit Price | Total Price |
| 15101(2). | Mobilization | LSQ | 1 | Lump Sum | $0.00 | |
| 21101(2). | Roadway Obliteration - Asphalt Removal | AQ | 242 | Square Yard | $0.00 | |
| 30101(2). | 3/4"-0" Crushed Aggregate Base, Including Haul, Watering, and Compaction | AQ | 25 | Cubic Yard | $0.00 | |
| 41801(2). | Warm Mix Asphalt (WMA) Concrete Pavement | AQ | 45 | Ton | $0.00 | |
| 63501(2). | Temporary Traffic Control | LSQ | 1 | Lump Sum | $0.00 | |
| TOTAL PRICE (ALL ITEMS - Option Item #2) | $0.00 | |||||
| GRAND TOTAL PRICE (ALL ITEMS - Base Bid PLUS Option Item #1 PLUS Option Item #2) | $0.00 | |||||
| * Designated Method of Measurement | ||||||
| AQ - Actual Quantities; CQ - Contract Quantities; LSQ - Lump Sum Quantities |