AMENDMENT_2_(2).pdf
PDF 2 MB Posted
- Attached to
- Redfish Lake Road Phase 2 Project 2017 - Amended Federal contract opportunity
- Solicitation number
- AG-0261-S-17-0091
About this file
AMENDMENT 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Copy_of_3_SectionB_Schedule_of_Items_(Amendment_2).xlsx | XLSX spreadsheet | |
| AMENDMENT_1.pdf | ||
| SUPPORTING_DOCUMENT__C_-_TEST_HOLE_EXCAVATION_SUMMARY-GEO_TECH_REPORT.pdf | ||
| SUPPORTING_DOCUMENT_D_-__SCHEDULE_OF_ITEMS_SPREADSHEET.pdf | ||
| SUPPORT_DOCUMENT_E_-_WORKERS_COMP_VERIFICATION_AND_PAST_PERFORMANCE_QUESTIONAIRE.pdf | ||
| SUPPORT_DOCUMENT_B_-_SPECIFICATIONS.pdf | ||
| AG-0261-S-17-0091_REDFISH_LAKE_ROAD_PHASE_2-NUMBER_2_PROJECT_2017.pdf | ||
| SUPPORT_DOCUMENT_A_-_PROJECT_PLANS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 12
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NUMBER (if applic.)
Amendment No. 2 06-27-2017
6. ISSUED BY: CODE: 7. ADMINISTERED BY (If other than 6.): CODE:
USDA Forest Service SW Idaho/Nevada Acquisition Center 1249 South Vinnell Way, Suite 200 Boise, ID 83709-1663
8. NAME AND ADDRESS OF CONTRACTOR 9A. AMENDMENT OF SOLICITATION NUMBER
[X] AG-0261-S-17-0002
9B. DATED (see item 11) 06-02-2017
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (see item 13)
CODE FACILITY
11. THIS ITEM APPLIES ONLY TO AMENDMENTS OF SOLICITATIONS
[X] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [X ] is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copy(s) of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amend-ment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if applicable)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
[ ] A. THIS CHANGE ORDER IS PURSUANT TO: FAR 52.243-5 Changes and Changed Conditions
The changes set forth in Item 14 are made in the Contract Order Number in Item 10A.
[ ] B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
[ ] C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
[ ] D. OTHER (specify type of modification and authority)
E. Contractor [ ] is, [X ] is not required to sign this document and return _____ ___ copy(s) to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION
REFER TO REDFISH LAKE ROAD PHASE II NUMBER 2 PROJECT 2017, Sawtooth NRA, SOLICITATION DATED 006-02-2017-2017 and amend as follows:
1. SEE ATTACHED DOCUMENTS
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remain unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (type or print)
Karen L. Morthlland , Contracting Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
__________________________ BY:________________________
(Signature of authorized person to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 SF 30 (REV. 10/83)
AMENDMENT #2
Redfish Lake Road Improvements Phase 2 – Number 2 Project 2017
The following changes have been made to the plans and specifications for the above named project.
Please incorporate the following information into your bid.
Part I – The Schedule Section B – Supplies or Services and Prices
Pages 4 - 6 of 59
Replace this Section B – Supplies or Services and Prices bid schedule document in its entirety with a new Section B – Supplies or Services and Prices form as attached.
Part III – List of Documents, Exhibits, and Other Attachments Section J: Supporting Document D – Schedule of Items Spreadsheet
Replace this Supporting Document D – Schedule of Items Spreadsheet in its entirety with a new one, as attached.
Page 1 of 5 (Amendment #2)
PART I - THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICES
Redfish Lake Road Improvements (Phase 2) Project 2017
Sawtooth National Forest Stanley, Idaho
B.1 Schedule of Items
Base Bid
Item No. Description *Method
Of Measure
Unit Est.
Quantity Unit Price Total
15101 Mobilization LSQ Lump Sum 1
15201 Construction Staking, Precision Class A, Tolerance Class B
LSQ Lump Sum 1
15401 Contractor Testing LSQ Lump Sum 1
15701 Silt Fence AQ Lineal Foot 250
15702 Straw Wattles AQ Lineal Foot 75
15703 Stabilized Construction Entrances
CQ Each 3
20101 Clearing and Grubbing LSQ Lump Sum 1
20102
Slash, Hauling and Spreading Over Staging Area, Waste Disposal Site, & Decommissioned Roadways
LSQ Lump Sum 1
20301 Removal of Structures and Obstructions LSQ Lump
Sum 1
20302 Fence Removal CQ Lineal Foot 424
20401
Roadway Excavation Including Haul, Subgrade Preparation, Scarification, Watering, and Compaction
LSQ Lump Sum 1
20402
Select Borrow Including Haul, Watering, and Compaction
AQ Cubic Yard 1500
20403 Rock Excavation AQ Cubic Yard
Page 2 of 5 (Amendment #2)
20404
Roadway Embankment Including Haul, Subgrade Preparation, Scarification, Watering, and Compaction
LSQ Lump Sum 1
20405 Waste, Haul and Disposal of Unsuitable or Excess Material
AQ Cubic Yard 2500
20406 Barrier Rock Placement Complete AQ Each 290
20501 Controlled Rock Blasting AQ Square
Foot 500
20701 Earthwork Geotextile Type II-A CQ Square
Yard 19677
21101 Roadway Obliteration, Asphalt Pavement Removal
CQ Square Yard 6557
21102 Roadway Obliteration, Crushed Gravel Base Removal
CQ Cubic Yard 730
21103 Roadway Obliteration, Full Recontouring (Area 1)
LSQ Lump Sum 1
21104 Roadway Obliteration, Full Recontouring (Area 2)
LSQ Lump Sum 1
21105 Roadway Obliteration, Full Recontouring (Area 3)
LSQ Lump Sum 1
25101 Placed Riprap, Class 3 AQ Cubic Yard 115
30101
3/4"-0” Crushed Aggregate Base, Including Haul, Watering, and Compaction
AQ Cubic Yard 3130
41801 Warm Mix Asphalt (WMA) Concrete Pavement
AQ Ton 3105
60201
18-Inch Corrugated Steel Pipe, 0.079-Inch Thickness, Including Pre-Fab Flared End Sections, Excavation, Bedding, Backfill and Compaction
AQ Lineal Foot 99
Page 3 of 5 (Amendment #2)
60202
24-Inch Corrugated Steel Pipe, 0.079-Inch Thickness, Including Pre-Fab Flared End Sections, Excavation, Bedding, Backfill and Compaction
AQ Lineal Foot 54
60901 Precast Colored Concrete Wheel Stop CQ Each 32
61101 Cut & Cap Existing Waterline LSQ Lump
Sum 1
61801 Resetting Precast Concrete Barrier CQ Each 2
61901 Steel Gate, Type 1 CQ Each 1 $__________ $______________ 61902 Steel Gate, Type 2 CQ Each 1 $__________ $______________
62501 Seeding (Upland) CQ Acre 8.4 $__________ $______________
62502 Seeding (Wetland) CQ Acre 0.6 $__________ $______________
63301 Permanent Signing LSQ Lump Sum 1
63302 Removing and Resetting Bulletin Board Complete
LSQ Lump Sum 1
63303 Removing and Resetting Fee Tube Complete
LSQ Lump Sum 1
63401 Permanent Pavement Striping LSQ Lump
Sum 1
63501 Temporary Traffic Control LSQ Lump
Sum 1
TOTAL PRICE (ALL ITEMS – Base Bid) $________________________
Option Item #1 – Paved Trail
Item No. Description *Method
Of Measure
Unit Est.
Quantity Unit Price Total
15101(1) Mobilization LSQ Lump Sum 1
15201(1) Construction Staking, Precision Class A, Tolerance Class B
LSQ Lump Sum 1
15401(1) Contractor Testing LSQ Lump Sum 1
20101(1) Clearing and Grubbing LSQ Lump
Page 4 of 5 (Amendment #2)
20102(1)
Slash, Hauling and Spreading over Decommissioned Roadways
LSQ Lump Sum 1
20301(1) Fence Removal CQ Lineal Foot 380
20401(1)
Roadway Excavation Including Haul, Subgrade Preparation, Scarification, Watering, and Compaction
LSQ Lump Sum 1
20402(1)
Select Borrow Including Haul, Watering, and Compaction
AQ Cubic Yard 50
20403(1)
Roadway Embankment Including Haul, Subgrade Preparation, Scarification, Watering, and Compaction
LSQ Lump Sum 1
20701(1) Earthwork Geotextile Type II-A CQ Square
Yard 1260
21101(1) Roadway Obliteration, Full Recontouring (Trail)
LSQ Lump Sum 1
25101(1) Placed Riprap, Class 3 AQ Cubic Yard 10
30101(1)
3/4"-0” Crushed Aggregate Base, Including Haul, Watering, and Compaction
AQ Cubic Yard 155
41801(1) Warm Mix Asphalt (WMA) Concrete Pavement
AQ Ton 162
60201(1)
18-Inch Corrugated Steel Pipe, 0.079-Inch Thickness, Including Pre-Fab Flared End Sections, Excavation, Bedding, Backfill and Compaction
AQ Lineal Foot 39
62501(1) Seeding (Upland) CQ Acre 0.25 $__________ $______________ 62502(1) Seeding (Wetland) CQ Acre 0.30 $__________ $______________
TOTAL PRICE (ALL ITEMS – Option Item #1) $________________________
GRAND TOTAL PRICE (ALL ITEMS – Base Bid PLUS Option Item #1)
Page 5 of 5 (Amendment #2)
Option Item #2 – Existing Pavement Repair
Item No. Description *Method
Of Measure
Unit Est.
Quantity Unit Price Total
15101(2) Mobilization LSQ Lump Sum 1
21101(2) Roadway Obliteration, Asphalt Pavement Removal
AQ Square Yard 242
30101(2)
3/4"-0” Crushed Aggregate Base, Including Haul, Watering, and Compaction
AQ Cubic Yard 25
41801(2) Warm Mix Asphalt (WMA) Concrete Pavement
AQ Ton 45
63501(2) Temporary Traffic Control LSQ Lump
TOTAL PRICE (ALL ITEMS – Option Item #2)
GRAND TOTAL PRICE (ALL ITEMS – Base Bid PLUS Option Item #1 PLUS Option Item #2) $________________________
* Designated Method of Measurement:
AQ – Actual Quanties; CQ – Contract Quantities; LSQ - Lump Sum Quantities