nak_wtcp_const_150128_jjp.pdf

PDF 277 KB Posted

Attached to
Dry Dock and Maintain Chickiman and Nakwasina Camp Barges
Solicitation number
AG-0112-S-15-0004
Issued by

About this file

NAKWASINA BARGE WATER TREATMENT CONTROL PANEL

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -

DESIGNED: DATE:

DATE:DRAWN:

REVIEWED: DATE:

DATE: REVISION: BY:

PLOT ON 11"X17" PAPER

TONGASS

ENGINEERING & RECREATION TNFTYP:09/04

NAKWASINA BARGE WATER TREATMENT CONTROL PANEL TITLE PAGE

KETCHIKAN SO

JJP 1/2/15

JJP 1/2/15

ACAD.DWG E1 7

UNITED STATES FOREST SERVICE

NAKWASINA BARGE

WATER TREATMENT CONTROL PANEL

TABLE OF CONTENTS

SHEET DESCRIPTION

1 TITLE PAGE

2 NOTES AND DETAILS

3 MAIN PANEL ASSEMBLY

4 PANEL FRONT LAYOUT

5 REMOTE PANEL LAYOUT

6 SYSTEM SCHEMATIC 1 OF 2

7 SYSTEM SCHEMATIC 2 OF 2

DATE:DRAWN:

REVIEWED: DATE:

DATE: REVISION: BY:

PLOT ON 11"X17" PAPER

TONGASS

ENGINEERING & RECREATION TNFTYP:09/04

NAKWASINA BARGE WATER TREATMENT CONTROL PANEL NOTES AND DETAILS

KETCHIKAN SO

JJP 1/2/15

JJP 1/2/15

ACAD.DWG E2 7

BILL OF MATERIAL

ITEM QTY. PART NUMBER DESCRIPTION MANUFACTURER DEVICE ID

1 1 24168-4XA 4X ENCLOSURE B-LINE

2 1 AW2416GP MOUNTING PLATE B-LINE

3 4LF 35MM SLOTTED DIN RAIL INDUSTRY STANDARD

4 1 F1X1LG6 NARROW SLOTTED WIRE DUCT PANDUIT

5 1 C1LG6 WIRE DUCT COVER PANDUIT

6 1 CHCC1DU DIN MOUNTED FUSE HOLDER BUSSMANN F1

7 2 FNQ-R-2 TIME DELAY FUSE BUSSMANN F1

8 1 SCP-30S24-PN SOLA AC/DC CONVERTER EMERSON

9 1 PT724A SINGLE CHANNEL ANNUAL EVENT TIMER ALTROX T1

10 1 LB2032 LITHIUM BATTERY ALTROX T1

11 11 RSL 1PVBU RSL SLIM INTERFACE PLUG-IN RELAY SCHNEIDER ELECTRIC CR1A-3, CR5-9

12 1 RSL Z2 BUS JUMPER SCHNEIDER ELECTRIC CR1A-3, CR5-9

13 2 RPM42BD FOUR POLE PLUG-IN RELAY ZELIO CR4

14 1 RPZF4 PLUG IN SOCKET ZELIO CR4

15 4 REXL4TMBD ON-DELAY TIMING RELAY ZELIO OD1-3

16 3 RXZE2S114M PLUG-IN SOCKET ZELIO ODI-3

17 32 9080 GR6 NEMA TYPE TERMINAL BLOCKS SQUARE D

18 2 9080 GM6B END BARRIER SQUARE D

19 5 XVLA334 24 VDC RED 12MM PILOT LIGHT HARMONY LT1-5

20 2 9001 SKR2B 30MM NONMETALLIC PUSH BUTTON SQUARE D PB1-2

21 4 9001 SKS12B11 30MM NONMETALLIC TWO POSITION SELECTOR SQUARE D SWI-2

22 10 9001 KA1 30MM CONTACT BLOCKS SQUARE D A

23 2 SC628-BTR AUDIBLE ALARM MALLORY AL1-2

24 2 DA101BB-B NYLON TOGGLE SWITCH CARLING SW3-4

25 1 84214-40 2 GANG BLANK SS OVERSIZED COVER LEVITON SEE WORK ITEM E33

26 1 PK4GTA GROUNDING BAR KIT SQUARE D

NOTES:

1. 120 VOLT AC WIRING SHALL BE #12 AWG STRANDED TYPE MTW

2. ALL I20 VOLT AS WIRING SHALL BE RED (UNGROUNDED), WHITE (GROUNDED), AND GREEN (GROUNDING)

3. CONTROL WIRING SHALL BE #14 AWG STRANDED TYPE MTW

4. ALL 24 VOLT DC WIRING SHALL BE BLUE

5. DO NOT EXCEED CAPACITY OF TERMINALS

6. NO MORE THEN TWO TERMINAL EYELETS PER SCREW

7. NO SPLICES IN THE WIRE DUCT

8. LABEL EACH WIRE LEGIBLY AT TERMINAL BLOCKS WITH SELF LAMINATED ADHESIVE LABELS

9. LABELS SHALL REFLECT TERMINAL LABELING ON SHEET E3. NOTE WIRE COLOR (SECONDARY NOMENCLATURE)

10. ALL WIRE OUTSIDE OF WIRE DUCT SHALL BE SUPPORTED BY OTHER MEANS SUCH AS

BY APPROVED ANCHORED ZIP TIES OR OTHER APPROVED SUPPORT METHODS

11. BUNDLE AND PROTECT PANEL DOOR WIRING FROM RUBBING AND CHAFFING FROM DOOR

SWING

12. ALL WORK SHALL BE DONE IN A NEAT AND WORKMAN LIKE MANNER. REFER TO STANDARD NECA-1 FOR

GUIDANCE AS NEEDED

13. CONTRACTOR IS RESPONSIBLE TO PROTECT ALL FINISHED SURFACES, LABELS. AND COMPONENTS

14. CONTRACTOR SHALL NOT DEVIATE FROM DRAWINGS UNLESS SPECIFIED WITHIN THE DRAWINGS OR WITH

WRITTEN APPROVAL FROM THE CONTRACTING OFFICER

15. ANY DEVIATIONS FROM DRAWINGS SHALL BE DOCUMENTED IN THE AS-BUILTS

16. DRILL, CUT, AND INSTALL EACH COMPONENT PER MANUFACTURER'S INSTRUCTIONS

17. QUANTITIES ON BILL OF MATERIAL LIST INCLUDES SPARE REPLACEMENT DEVICES LISTED IN ITEMS 7, 11,13, AND 15 TO BE DELIVERED WITH THE BARGE

18. CONTRACTOR IS RESPONSIBLE FOR PROPER ORIENTATION OF SWITCHES WITH THEIR LABELING

19. ALL DIMENSIONS ARE IN INCHES

DATE:DRAWN:

REVIEWED: DATE:

DATE: REVISION: BY:

PLOT ON 11"X17" PAPER

TONGASS

ENGINEERING & RECREATION TNFTYP:09/04

NAKWASINA BARGE WATER TREATMENT CONTROL PANEL PANEL ASSEMBLY

KETCHIKAN SO

JJP 1/2/15

JJP 1/2/15

ACAD.DWG E3 7

SECONDARY NOMENCLATURE - WIRE COLOR

L1 - 120 V HOT FROM INVERTER PANEL

N - WHITE GROUNDED (NEUTRAL) FROM INVERTER PANEL

GND - GROUND - GREEN

Bk - BLACK

R - RED

W - WHITE

Br - BROWN Bu- BLUE

SHLD - SHIELDING FROM CABLE

DATE:DRAWN:

REVIEWED: DATE:

DATE: REVISION: BY:

PLOT ON 11"X17" PAPER

TONGASS

ENGINEERING & RECREATION TNFTYP:09/04

NAKWASINA BARGE WATER TREATMENT CONTROL PANEL PANEL FRONT LAYOUT AND LABELING

KETCHIKAN SO

JJP 1/2/15

JJP 1/2/15

ACAD.DWG E4 7

LT1 LT2 LT3 LT5

SW1 PB1 SW2

SW4

NOTES:

1. ALL LABELS SHALL BE

LAMINATED PLASTIC WITH SELF ADHESIVE BACKING

2. LABELS A-I

*3

4" HIGH BLACK

*3

16" HIGH WHITE LETTERING

3. LABEL J

*1-3/4" HIGH RED

*3

16" HIGH WHITE LETTERING

4. LABEL K

*3

4" HIGH BLACK

*12" HIGH WHITE LETTERING

(LAYOUT) (LABELING)

AL2

(J)

(B) (C) (D)

(E) (F) (G)

(H)

(K)

(I)

(A)

DATE:DRAWN:

REVIEWED: DATE:

DATE: REVISION: BY:

PLOT ON 11"X17" PAPER

TONGASS

ENGINEERING & RECREATION TNFTYP:09/04

NAKWASINA BARGE WATER TREATMENT CONTROL PANEL REMOTE PANEL ASSEMBLY (FOR WORK ITEM E33)

KETCHIKAN SO

JJP 1/2/15

JJP 1/2/15

ACAD.DWG E5 7

PB2 LT4

SW3

AL1

ASSEMBLY NOTES:

1. DIMENSIONS CAN BE ADJUSTED ONLY AS NEEDED TO FIT JUNCTION BOX

2. CONTRACTOR IS RESPONSIBLE FOR PANEL FIT INTO JUNCTION BOX

3. DRILL, CUT, AND INSTALL COMPONENTS PER MANUFACTURERS INSTRUCTIONS

4. ALL WORK SHALL BE DONE IN A WORKMAN TYPE MANNER

5. CONTRACTOR IS RESPONSIBLE TO PROTECT ALL FINISHED SURFACES OF PANELS, LABELS, AND

COMPONENTS

LABELING NOTES NOTES:

1. ALL LABELS SHALL BE WHITE LETTERING ON BLACK LAMINATED PLASTIC

2. "WATER SYSTEM" AND "ALARM PANEL" LETTERING SHALL BE 1

4" TALL

3. ALL OTHER LABEL LETTERS SHALL BE 3

16" TALL

LEVITON 84125-40

DATE:DRAWN:

REVIEWED: DATE:

DATE: REVISION: BY:

PLOT ON 11"X17" PAPER

TONGASS

ENGINEERING & RECREATION TNFTYP:09/04

NAKWASINA BARGE WATER TREATMENT CONTROL PANEL SCHEMATIC 1 OF 2

KETCHIKAN SO

JJP 1/2/15

JJP 1/2/15

ACAD.DWG E6 7

DATE:DRAWN:

REVIEWED: DATE:

DATE: REVISION: BY:

PLOT ON 11"X17" PAPER

TONGASS

ENGINEERING & RECREATION TNFTYP:09/04

NAKWASINA BARGE WATER TREATMENT CONTROL PANEL SCHEMATIC 2 OF 2

KETCHIKAN SO

JJP 1/2/15

JJP 1/2/15

ACAD.DWG E7 7

e1_coversheet
e2_notes_details
e3_main_panel_assembly
e4_panel_front_layout
e5_remote_panel_assembly
e6_schem_1of2
e7_schem_2of2

File details come from the government source that posted it. Updated .