Text version
N O R T H
VICINITY MAP
WEST GLACIER
SPUR ROAD AREA
ENHANCEMENTS
INDEX TO SHEETS
NO. DESCRIPTION
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
132°136°138°140°142° 134°
JUNEAU
Craig
132°
KEY MAP
GULF OF ALASKA
56°
58° Sitka
138°
60°
Yakutat
ALAS
KA
142°
62°
C
AN
AD
A
140°
Skagway
136° 134°
56°
54°
Ketchikan
Wrangell
Petersburg
60°
58°
130° 128°
WEST GLACIER SPUR ROAD AREA ENHANCEMENTS COVER SHEET
JUNEAU RANGER DISTRICT
X. XXXXXXX XX/XX/XX
X. XXXXXXX XX/XX/XX
X. XXXXXXXXXX XX/XX/XX
XX/XX/XX XXXXXXXXXX X. XXXXXX
XX/XX/XX XXXXXXXXXXXXX X.XXXXXX
XX/XX/XX XXXXXXXXXXXXX X. XXXXXX
WG2015_11X17_COVER.DWG
1 24
CONCEPTUAL OVERALL SITE PLAN
SKATER'S CABIN AREA SITE PLAN
SKATER'S CABIN AREA LAYOUT PLAN
SKATER'S CABIN AREA GRADING PLAN
TOLCH ROCK PARKING AREA SITE PLAN
WEST GLACIER TRAILHEAD SITE PLAN
WEST GLACIER SST TOILET LAYOUT PLAN
WEST GLACIER SST TOILET GRADING PLAN
WATER VALVE & METER RELOCATION
SITE DETAILS
SITE DETAILS
WEST GLACIER BEACH AREA DETAILS
WEST GLACIER SST TOILET AREA DETAILS
STAIRCASE DETAILS
VIEW TRAIL DETAILS
MULTI-USE TRAIL DETAILS
SIGN PLAN
EXISTING SITE SURVEY
WEST GLACIER TRAIL BRIDGE PROFILES
GLULAM DECK PANEL TRAIL BRIDGE (1/4)
GLULAM DECK PANEL TRAIL BRIDGE (2/4)
GLULAM DECK PANEL TRAIL BRIDGE (3/4)
GLULAM DECK PANEL TRAIL BRIDGE (4/4)
PROJECT
LOCATION
PROJECT
LOCATION
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
WEST GLACIER SPUR ROAD AREA ENHANCEMENTS OVERALL SITE WITH IDENTIFIED OPTION ITEMS
JUNEAU RANGER DISTRICT
DJS 01/15
DJS 01/15
ACAD.DWG
2 24
SCALE:
WEST GLACIER SPUR ROAD OVERALL SITE LAYOUT WITH IDENTIFIED OPTION ITEMS
NOT TO SCALE
Option Item 1: Skater's Cabin Area. See Sheet 3 for Site Plan.
Option Item 2: Tolch Rock Parking Area and Tolch Rock Trail Improvements. See Sheet 6 for Site Plan
Base Bid: West Glacier Trailhead Area. See Sheet 7 for Site Plan
Mendenhall Lake Option Item 6: View
Trail, as staked by Gov't. See Sheet 16.
Option Item 3: Relocate water valve and meter as staked by the Gov't.
See Sheet 10.
Option Item 5: Install 2 Bollards near Arctic Dr. as staked by the Gov't. See Detail 3, Sheet 11.
Option Item 6: 250' of 6' wide aggregate path
Option Item 4: (Various locations within project area) All signs as shown on Sign Plan. See Sheet 18.
Base Bid: Multi-use Trail, with 2 bridges. See Sheet 17, Sheets 19-22, and Trail Log for Details.
SCALE IN FEET
30 0 30 60
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
WEST GLACIER SPUR ROAD AREA ENHANCEMENTS SKATER'S CABIN AREA SITE PLAN
JUNEAU RANGER DISTRICT
DJS 01/2016
DJS 01/2016
ACAD.DWG
3 24
SCALE:
SKATERS CABIN AREA SITE PLAN
1" = 30'
Existing Speed Bump
Construct 12'x12' asphalt landing on each side of road
Reconstruct expanded parking lots as shown. See Detail 2 Sheet 11.
Remove existing pavement
Construct 2473' of Multi-use Trail as staked by Gov't. See Trail Log and trail details, Sheet 17.
Includes 2 trail bridges as located in trail log.
See Sheets 20-24
Existing Speed Bump
Construct aggregate surfacing path (Detail 2, Sheet 12) and blend into existing
Install 10' wide Crosswalk Striping per
MUTCD Section 3B.17
Existing roadside ditch
Existing outhouse
Remove and re-set 2 existing 8" culverts to provide working drainage under pathway
Remove existing gate, protect from damage, and reinstall at beach access. 2nd post to lock gate open to be disposed of. See Detail 2, Sheet 13 for foundation detail
Existing Paved Bike Path
Install (2) Ø18" HDPE Culverts under Parking Driveway. See Detail 4, Sheet 11
Install (2) Ø18" HDPE Culverts under Multi-use Trail and
Parking Driveway. See Detail 4, Sheet 11
Stripe Parking Lots. See Detail 3, Sheet 12.
Construct aggregate surfacing path to connect with Multi-use Trail. See Detail 2, Sheet 12
Smooth transitions with existing aggregate paths;
max grade 5% (Typ.)
Existing boulders outside of disturbed areas to remain in place. Move boulders in disturbed areas (approx. 26) to existing boulder stockpile at West Glacier Trailhead for storage or use in other areas of project.
Construct paved parking lot with 14 angled spaces as shown. See Paving Detail 2, Sheet 11
W. Glacier Trailh ead
Existing Culvert
Install wheel stops, typ.
See Detail 1, Sheet 12
Construct aggregate surfacing path with ditch (Detail 2, Sheet
12) and blend into existing
Boulder, Type A. See Detail 1, Sheet 11
Boulders, (1) Type A & (1) B. See Detail 1, Sheet 11
Remove existing sign and sign posts
STA 0+00 of Trail Log staked on the ground by Gov't
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
WEST GLACIER SPUR ROAD AREA ENHANCEMENTS SKATER'S CABIN AREA LAYOUT PLAN
JUNEAU RANGER DISTRICT
DJS 01/2016
DJS 01/2016
ACAD.DWG
4 24
SCALE:
SKATERS CABIN AREA LAYOUT PLAN
1" = 30'
60.0'
5.0'
25.0'
85.0'
Existing Paved Bike Path
20.0'
20.0'
106.1'
50.0'
16.0'
99.0' 37.0'
5.0'
171.1'
10.0'
5.0'
R30.0'
18.0'
14.0'
7.1'
STA 0+00 of Trail Log staked by Govt
5.0'
8.0'
5.0'
Center asphalt landing on trail stakes
30.0'
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
WEST GLACIER SPUR ROAD AREA ENHANCEMENTS SKATER'S CABIN AREA GRADING PLAN
JUNEAU RANGER DISTRICT
DJS 01/2016
DJS 01/2016
ACAD.DWG
5 24
SCALE:
SKATERS CABIN AREA GRADING PLAN
1" = 30'
Existing outhouse
Existing Paved Bike Path
10.15 (Existing pavement)
11.25
11.25
11.5
11.511.75
11.75
Multi-Use Trail Grading as shown in Trail Log
5% Max Grade of Aggregate Path to connect to Multi-Use Trail
←2
2%
10.15 (Existing pavement)
Cut slopes 2:1
Fill slopes 3:1
Cover ditch between path and driveway to provide 12" cover over culverts and blend with existing ground
FILL AS REQ'D SO FINISHED AGGREGATE
SURFACE IS 2" ABOVE ADJACENT GROUND.
EXCAVATION TO COMPETENT SUBGRADE
MAY BE REQUIRED AT EDGES OF TRAIL TO
PROVIDE FULL WIDTH.
RETAIN MOSS AND
GROUNDCOVER DURING
EXCAVATION AND PLACE
ON SIDESLOPES
6" MIN. DEPTH AGGREGATE
SURFACING
RETAIN LIVE ROOTS
OVER 2" DIAM.
6'
EXISTING GROUND
EXISTING TRAIL SURFACE
SCALE IN FEET
20 0 20 40
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
WEST GLACIER SPUR ROAD AREA ENHANCEMENTS TOLCH ROCK PARKING AREA SITE PLAN
JUNEAU RANGER DISTRICT
DJS 01/2016
DJS 01/2016
ACAD.DWG
6 24
SCALE:
TOLCH ROCK PARKING AREA
1" = 20'
Clear and rehabilitate 350' of trail from parking lot to multi-use path intersection.
See Detail 2, this sheet.
Construct asphalt paved parking area.
Location of south edge to be staked on the ground by Govt. See Detail 2, Sheet 11.
Construct drainage ditch to provide positive drainage to existing culvert
Place (4) boulders, Type A or B, as shown on plan and approved by Gov't. See Detail 1, Sheet 11. Remove other boulders around existing parking area to existing stockpile at West Glacier Trailhead parking lot.
Existing Parking Lot Edge
Stripe Parking Area as shown.
See Detail 3, Sheet 12.
95'
12" HDPE Culvert. See Detail 3, Sheet 17.
R10'
20'
5'
40'Existing culvert
Remove Existing Parking Lot Pavement and Repave
SCALE:
TOLCH ROCK TRAIL SECTION
1" = 2'
Aggregate Surface Trail, Detail 2 Sheet 12, with drainage ditch.
West Glacier Trailhead
50 0 50 100
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
WEST GLACIER SPUR ROAD AREA ENHANCEMENTS WEST GLACIER TRAILHEAD SITE PLAN
JUNEAU RANGER DISTRICT
DJS 01/2016
DJS 01/2016
ACAD.DWG
7 24
SCALE:
WEST GLACIER TRAILHEAD SITE PLAN
1" = 50'
Refer to SST Toilet/Trailhead Layout Plan, Sheet 8, and Grading Plan, Sheet 9.
View Trail: Construct 177' of aggregate surfacing trail to Rest Area, as staked by Govt. See Sheet 16.
500 SF Aggregate Pad with 14 Bike Racks located along staked Multi-use Trail as shown.
Extend existing culvert by 20'
Remove and replace existing beach access gate. See
Detail 2, Sheet13.
Remove 3 existing concrete benches on beach Install (10) Type C Boulders on Beach as staked by Gov't. Place boulders to provide flat seating surfaces. See Detail 1, Sheet 11.
Existing West Glacier Trail
Existing Vegetation
SST Toilet Building
250' Long Aggregate Path, 6' wide. See Detail 2, Sheet 12.
Multi-Use Trail, per Trail Log, as staked by Govt.
See Sheet 17.
6'
55' Long Aggregate Path, 10' wide along forward part of bus pull-out. See Detail 2, Sheet 12.
Existing 18" Culvert
75' Aggregate Path, 6' wide, between bus loading and SST access path. See Detail 2, Sheet 12.
Construct aggregate surfacing transition from bus loading to beach area. See Detail 1, Sheet 13.
Existing Boulder Stockpile. Boulders from here may be used on the site where noted, when meeting boulder requirements or as approved.
20 0 20 40
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
WEST GLACIER SPUR ROAD AREA ENHANCEMENTS WEST GLACIER SST TOILET LAYOUT PLAN
JUNEAU RANGER DISTRICT
DJS 01/2016
DJS 01/2016
ACAD.DWG
8 24
SCALE:
WEST GLACIER SST TOILET GRADING PLAN
1" = 20'
14 Single Inverted U Bike Racks.
See Detail 4, Sheet 17.
93' Toilet Access Trail, 6' Wide. See Detail 4, Sheet 14.
Approx. drainage swale centerline
6' wide gravel path along parking area, connecting SST access and beach to trail and bike path.
See Detail 2, Sheet 12.
Staircase. See Sheet 15.
25' Aggregate Path, 5' Wide.
See Detail 2, Sheet 12.
SST Toilet Building
Concrete Slab
23.6'
23.5'
8'
12'
25'21'
Install 56 LF Boulder Seat Wall. See Detail 2, Sheet 14. Increase width of Aggregate Path to 7' in front of wall.
Center Path on Breezeway (Typ.)
17.9'
18.1'
12'
6' TYP.
3' TYP.
3' TYP.
Multi-Use Trail STA. 24+92 at Pavement Edge
Boulders as shown. Stake trailhead locations for CO approval. See Detail 1, Sheet 11.
Transition trail from 10' width to 3' width over 50' as shown and blend into existing trail.
R40'
19'
32'
24'
17'
9' 4.5'
9'
R12'
10' 14'
11'
Install (1) Garbage Can (2 total) at each end of Breezeway. Location to be marked after SST Installation.
Install Boulder Cluster as shown to define access routes.
See Detail 1, Sheet 11.
23.9
Multi-Use Trail STA. 24+73 staked by Govt. Align bike rack area alongside trail.
Ditch per Detail 4, Sheet 14
20 0 20 40
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
WEST GLACIER SPUR ROAD AREA ENHANCEMENTS WEST GLACIER SST TOILET GRADING PLAN
JUNEAU RANGER DISTRICT
DJS 01/2016
DJS 01/2016
ACAD.DWG
9 24
SCALE:
WEST GLACIER SST TOILET GRADING PLAN
1" = 20'
2% Slope along Trail CL for 10' from concrete pad.Max CL Slope 4%
Cut/fill slopes no steeper than 3:1.
Max CL Slope 2%
Compact to aggregate ensure smooth transition at concrete edge for accessibility (TYP.)
3:1 Cut slopes
Transition pathway cross-slope to drain towards ditch
Notes:
1. Proposed contours shown only in main toilet excavation area.
Approximate ditch centerline
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
WEST GLACIER SPUR ROAD AREA ENHANCEMENTS WATER VALVE & METER RELOCATION
JUNEAU RANGER DISTRICT
DJS 01/2016
DJS 01/2016
ACAD.DWG
10 24
SCALE:
SKATER'S CABIN AREA WATER VALVE AND METER RELOCATION CONCEPTUAL PLAN
NOT TO SCALE
Water Valve & Meter Relocation Notes:
Coordinate design with City and Borough of Juneau (CBJ) and obtain CBJ approval on all plans. Final design to be submitted to USFS for approval before proceeding with construction.
Work includes, but is not limited to:
Relocate the meter and valve out of roadway and bike path, onto shoulder as approved by CBJ and USFS.
House the valve in standard water utility box for a 6” compound meter with a backflow preventer. The box shall lock on two sides and open from either side.
Provide a 4” thick concrete pad to mount the housing structure to. Include an opening in the concrete to allow for the water lines to pass freely with a 1” clearance without being in contact with the concrete, or as approved by CBJ.
Existing water lines and sewer lines are shown on the drawings based on available information. The actual location and sizes may vary. The Contractor shall be responsible for determining the actual location of existing service line by potholing if necessary. Protect all existing lines from damage.
Coordinate with CBJ Lead Meter Technician, Public Works Water Utility (907-789-0997) to have the meter rebuilt by CBJ after it is installed and to have the meter transmitters reconnected.
Install water line per CBJ requirements Coordinate water shut-off period with CBJ and USFS. Work to be completed from Oct 1- April 15. Provide min. 2 weeks notice to CO prior to shutting off water.
Maintain access for emergency vehicles at all times, and work with other services to minimize delays.
Existing Ditch
Existing Speed Limit Sign
Existing Recreation Area Sign
Existing in-ground Vault with meter and valve
Existing Paved Bike Path
Relocate water valve and meter to above ground enclosure. Install bollards to protect enclosure. Waterline to Campground
Waterline continues to Skater's Cabin
Approx. existing water line location
(2) Bollards, per Detail 3, Sheet 11, without welded 6"x3" plate
Sawcut and remove AC Pavement as necessary.
AC Pavement surfact to be repaired to match original, see technical specificaitons. AC Pavement to be 3" min thick or equal to existing, whichever is greater, over 10" base aggregate or equal to existing, whichever is greater.
PAVED ROADWAY 3" AC PAVEMENT
(2) 18" DIA. CULVERTS
EXISTING DITCH
PROFILE
1'MIN.
SELECT BACKFILL MATERIAL FOR
BEDDING, REFER TO FP-03 SECTION 602
AND FP-03 SECTION 209.09, 209.10.
18"
2' AGGREGATE SHOULDER
PARKING DRIVEWAY, 3"
AC PAVEMENT
EXISTING STREAMBED
SELECT BACKFILL MATERIAL FOR
BEDDING, REFER TO FP-03 SECTION 602
AND FP-03 SECTION 209.09, 209.10.
GRADE OF CMP SHALL BE THE SAME AS
THE EXISTING STREAM CHANNEL UNLESS
OTHERWISE SHOWN ON DRAWINGS.
3" AC PAVEMENT
6" DEPTH, BASE AGGREGATE
SUBBASE, 12" DEPTH
BOULDER SCHEDULE
SYMBOL DIM. 'a' DIM 'b' DIM 'c'
MIN. MAX. MIN. MAX. MIN. MAX.
ROCK 'A' 48" 54" 36" 42" 36" 42"
ROCK 'B' 36" 42" 24" 30" 36" 48"
ROCK 'C' 28" 34" 24" 30" 24" 42"
a b c
3' TYP.
12" TYP.
6" TYP.
2' TYP.
COMPACT SUBGRADE
NATURAL GROUND OR
AGGREGATE SURFACING
A B
SUITABLE BEDDING MATERIAL
C
9" TYP.
18" TYP.
UNDISTURBED NATIVE
GRANULAR MATERIAL
18" DIA. CONCRETE FOOTING
FINISH GRADE
6" DIA. STD GALV. STEEL PIPE
FILLED WITH CONCRETE
SMOOTH ROUND CONCRETE
TOP
8" PL X 6" X 3" W/ 4" X
1" ELONGATED HOLE
1'-6"
3"
3'
4"
COMPACTED GRANUALAR
MATERIAL
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
WEST GLACIER SPUR ROAD AREA ENHANCEMENTS SITE DETAILS
JUNEAU RANGER DISTRICT
DJS 01/2016
DJS 01/2016
ACAD.DWG
11 24
TYPICAL PAVING DETAIL ROADSIDE DITCH CULVERT DETAILS
NOT TO SCALE NOT TO SCALE
Note: Additional excavation below the neatline subcut may be required, if organic or other unsuitable materials are found at or near the planned subcut level, as directed by the CO. Suitable material from excavation may be used to backfill the addtional areas of excavation, which may vary in depth. The backfilling with suitable material from excavation will be considered incidental to the other work.
Notes:
1. Culvert inlets and outlets shall extend 24" beyond the toe of the fill.
2. Minimum cover over the culverts, unless otherwise shown on the drawings, is 12".
3. Provide the CO a list of as-slope staked culvert lengths and locations.
BOULDER DETAILS
NOT TO SCALE11
BOLLARD DETAIL
NOT TO SCALE11
10'TYP.
20'
2'
45°
4" WHITE
STRIPES
5'
AGGREGATE
PATH
10'TYP.
2'
45°
5'
ACCESSIBILITY SYMBOL IN
ACCESSIBLE SPACES
4" WHITE
STRIPES
WHITE PAINT
CENTER WHEEL STOP
IN EACH SPACE
1'-6"
EDGE OF PAVEMENT
2'-6"
CENTER WHEEL STOP
WIDTH AS SHOWN ON PLAN
4" MIN. DEPTH AGGREGATE
SURFACING
EXISTING PAVING
SLOPE AS SHOWN ON PLAN
DRAINAGE DITCH WHERE
SHOWN ON PLANS, 1' DEPTH
MIN. 2:1 CUT SLOPES.
1'
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
WEST GLACIER SPUR ROAD AREA ENHANCEMENTS SITE DETAILS
JUNEAU RANGER DISTRICT
DJS 01/2016
DJS 01/2016
ACAD.DWG
12 24
PARKING LOT STRIPING DETAILS
NOT TO SCALE
WHEEL STOP DETAIL
NOT TO SCALE12
AGGREGATE SURFACING TRAIL DETAIL
NOT TO SCALE12
3'
3'
1'
3" CLR TYP.
3" CLR TYP.
REMOVE EXISTING GATE AND GATE KEEPER
POST AT SKATER'S CABIN WALKING PATH AND
INSTALL AT WEST GLACIER TRAILHEAD BEACH
ACCESS LOCATION, AS SPECIFIED ON PLANS.
(4) ALL THREAD W/HEX HEAD (OR NUT) AND WASHER, DIAMETER TO
MATCH EXISTING, LEVEL BEFORE PLACING NON-SHRINK GROUT.
NON-SHRINK GROUT,1-1/2" THICKNESS MAX.
#4 REBAR (4 REQ'D)
CONCRETE FOOTING 3000 PSI MIN.
UNDISTURBED GRANULAR MATERIAL(4) #4 REBAR EACH
WAY, TOP AND BOTTOM
COMPACTED GRANULAR
MATERIAL, TYP.
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
WEST GLACIER SPUR ROAD AREA ENHANCEMENTS WEST GLACIER BEACH AREA DETAILS
JUNEAU RANGER DISTRICT
DJS 01/2016
DJS 01/2016
ACAD.DWG
13 24
SCALE:
WEST GLACIER BUS LOADING LAYOUT AND GRADING PLAN
1" = 20'
15'
30'
14' 39'
Install 3 boulders, Type A or B, across beach access, 3' min openings. See Detail 1, Sheet 11.
20'
Existing boulders edging pavement to remain
Extend existing 18" culvert by 20'.
Install ditch per Detail 2, Sheet 12.
GATE INSTALLATION
NOT TO SCALE13
Aggregate surfacing trail, Detail 2, Sheet 12.
WIDTH AS SHOWN ON PLAN
3:1 MAX CUT/FILL SLOPE 4" MIN. DEPTH
AGGREGATE SURFACING
COMPETENT SUBGRADE
DRAINAGE DITCH.
2:1 CUT SLOPES.1'
BOULDERS, TYPE C OR B PER
DETAIL 1, SHEET 11.
16" MIN,
18" MAX.
2" DRAIN ROCK
RETAIN EXCAVATED TOPSOIL
AND PLACE ON CUT AND FILL
SLOPES AFTER GRADING
BURY BOULDERS 9" MIN.
TO PROVIDE ACCURATE
SEAT HEIGHT. SEE
DETAIL 3, SHEET 14.
SUITABLE BEDDING
MATERIAL
12"
PLACE 8" MIN.
SOIL OVER FABRIC
16" MIN,
18" MAX.
SELECT AND PLACE BOULDERS FOR
TIGHT JOINTS AND FLAT SEATING
SURFACES. ENSURE TOP FACE OF
BOULDER IS RELATIVELY FLAT AND
FRONT FACE RELATIVELY VERTICAL
FOR COMFORTABLE SEATING.
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
WEST GLACIER SPUR ROAD AREA ENHANCEMENTS WEST GLACIER SST TOILET AREA DETAILS
JUNEAU RANGER DISTRICT
DJS 01/2016
DJS 01/2016
ACAD.DWG
14 24
SST TOILET ELEVATION
Excavation for vaults
3:1 Cut Slope Existing Ground
3:1Max.
Fill Slope
Boulder Seat Wall. See Details 2 & 3, Sheet 14
SST Toilet
SCALE: 1'=8'
SEAT WALL DETAIL
SCALE: 1'=2'
TOILET ACCESS TRAIL
1' Min. Ditch Depth.
2:1 Slopes in Ditch
1'
2' @ 2%
SEAT WALL ELEVATION
SCALE: 1'=2'
SCALE: 1'=2'
Contour and round tops of excavation to mimic natural contours.
4'
7"
2'-6"
FACE OF STEP TEXTURED
TO SIMULATE STONE
MEDIUM BROOM FINISH
ON TOP
AGGREGATE
PATH
FACE OF STEP TEXTURED
TO SIMULATE STONE
PRECAST
CONCRETE STEP
1'-4"2'-6"
7"
AGGREGATE
PATH
4" MIN. D-1 BEDDING
HANDRAIL PER DETAIL
2" GALVANIZED
STEEL PIPE
3'
1'-4"
1'
1'
8" DIA.
2'
1'
EDGE STAIRS WITH
2-4" ROCK W/O FINES
CONCRETE FOOTING
HANDRAIL
2-4" ROCK
W/O FINES
4'
9" 3"
PRECAST
CONCRETE
STEP (TYP.)
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
WEST GLACIER SPUR ROAD AREA ENHANCEMENTS STAIRCASE DETAILS
JUNEAU RANGER DISTRICT
DJS 02/2016
DJS 02/2016
ACAD.DWG
15 24
STAIRCASE SECTION
NOT TO SCALE
PRECAST CONCRETE STEP DETAIL
NOT TO SCALEHANDRAIL DETAIL
NOT TO SCALE
STAIRCASE ELEVATION
NOT TO SCALE
EXCAVATE TO DEPTH AS REQ'D SO
FINISHED AGGREGATE SURFACE IS 2"
ABOVE ADJACENT GROUND3'
PLACE SOIL AT 1 12:1 SLOPE AS
SHOWN AND DISPOSE OF
EXCESS AS SPECIFIED
4" MIN. DEPTH AGGREGATE
SURFACING
RETAIN LIVE ROOTS OVER 2" DIAM.
PLACE EXCAVATED SOIL AS SHOWN
3'
FINISHED CUTBANK LESS THAN
ANGLE OF REPOSE
4" MIN. DEPTH AGGREGATE
SURFACING
RETAIN LIVE ROOTS OVER 2" DIAM.
4" min.
RETAINING STONES.
BURY 6" MIN.
18-24"
TYPC C BOULDERS, AS SEAT
STONES. SEE DETAIL 1, SHEET 11.
BEACH ELEVATION
TRAIL ELEVATION RISES FROM STA.
1+22 TO 1+77 TO MEET REST
AREA
EXCVATE TO
COMPETENT SUBGRADE
EXISTING GROUND
3"
4" AGGREGATE SURFACING
BASE COURSE
SUITABLE BEDDING
MATERIAL
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
WEST GLACIER SPUR ROAD AREA ENHANCEMENTS VIEW TRAIL DETAILS
JUNEAU RANGER DISTRICT
DJS 01/2016
DJS 01/2016
ACAD.DWG
16 24
VIEW TRAIL SECTION
VIEW TRAIL SECTION, EXISTING SIDESLOPE
VIEW TRAIL REST AREA PLAN
VIEW TRAIL REST AREA SECTION
Clear trees in front of rest area to provide views of glacier.
Remove duff in front of rest area down to competent gravel.
Existing edge of vegetation/forest floor.
Retaining stones along front of rest area
130 SF Aggregate pad, as staked by the Govt, surface elevation 1' above average surrounding ground elevation. See Section in Detail 4, Sheet 16.
Seat stones
15'
8-10'
3' wide trail, as staked by Gov't. See Details 2 & 3, this sheet.
NOT TO SCALE
NOT TO SCALE
SCALE: 1"=4'
SCALE: 1"=4'
TRIM 23 CULVERT DIAMETER AT ANGLE
TO MATCH SLOPE. CULVERT SIZE AS
SHOWN IN TRAIL LOG.
6" TYP. 18" CATCH BASIN
6" MIN.
8' FINISHED WIDTH
4" MIN. DEPTH
AGGREGATE SURFACING
PLACE EXCAVATED SOIL AND MOSS
GROUNDCOVER AS SHOWN
4" MIN. DEPTH BASE COURSE
12"x12" DITCH WHERE STAKED
EXISTING GROUND PROFILE,
UNCLASSIFIED EXCAVATION
EXCAVATE TO
COMPETENT SUBGRADE
CONTOUR AND ROUND TOPS OF CUT SLOPES TO
MIMIC SURROUNDING NATURAL CONTOURS
8' FINISHED WIDTH
4" MIN. DEPTH
AGGREGATE SURFACING,
FILL SLOPE 3:1
BASE COURSE, FILL SLOPE 3:1
PLACE EXCAVATED SOIL AND
MOSS GROUNDCOVER AS SHOWN6"
SKIM MOSS AND TOP ORGANIC LAYER OFF
TO ROOT MAT & PLACE BASE LAYERS ON
ROOTMAT. BASE COURSE DEPTH AS REQ'D
TO PROVIDE SPECIFIED HEIGHT ABOVE
SURROUNDING GRADE.
3"
BIKE RACK
AGGREGATE SURFACING
3'
8"
6"
CONCRETE FOOTING
3000 psi CONCRETE MIN.
UNDISTURBED NATIVE
GRANULAR MATERIAL
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
WEST GLACIER SPUR ROAD AREA ENHANCEMENTS MULTI-USE TRAIL DETAILS
JUNEAU RANGER DISTRICT
DJS 01/2016
DJS 01/2016
ACAD.DWG
17 24
MULTI-USE PATH CULVERT
MULTI-USE PATH SECTION, SIDESLOPE CROSS SECTIONMULTI-USE PATH SECTION, FLAT CROSS SECTION
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
BIKE RACK, IN GROUND MOUNT
NOT TO SCALE17
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
WEST GLACIER SPUR ROAD AREA ENHANCEMENTS SIGN PLAN
JUNEAU RANGER DISTRICT
DJS 01/2016
DJS 01/2016
ACAD.DWG
18 24
A
Sign # Sign Type Sign Model Size (in.)
Material Color Content/Notes QTY Placement
A Pedestrian Crossing W11-2 24x24 Aluminum 2 on road before crosswalk; in both directions
B One-way R6-2 24x30 Aluminum 2 entance to new parking;
one for each direction (1 left arrow, 1 right)
C Do Not Enter R5-1 30x30 Aluminum 1 At exit of new parking area
D Stop (Multi-Use Path) R1-1 18x18 Aluminum 2 on multi-use path, before arriving at road crossing
E Reserved Accessible Parking R7-8-12 12x18 Aluminum 5 at head of reserved parking spaces within each parking area
F Intersection (Multi-Use Path) W2-1 18x18 Aluminum 4
Not shown on plan. Install on bike path before Tolch rock trail intersection; both ways. Confirm location with Govt before installation.
G Trailhead SA-1i 40x38 HDPE Grey/Blue* National Forest TRAILHEAD
Tolch Rock Trail← 1 On approach into parking area, as staked by Govt
H Trailhead SA-1i 40x39 HDPE Grey/Blue* National Forest TRAILHEAD
West Glacier Trail 1 On approach into parking area, as staked by Govt
I No Parking Bus Loading Only IS-81 12x18 Aluminum 2
Evenly spread along bus loading area, at edge of pavement
D
D
C
E
E
B
E
G
H
E
E
I
I
TOLCH ROCK TRAILHEAD SIGNS
SCALE: 1'=60'
WEST GLACIER TRAILHEAD SIGNS
SKATER'S CABIN AREA SIGNS
SCALE: 1'=60'
SCALE: 1'=60'
A
POINT TABLE
POINT #
CP1
CP2
CP3
CP4
CP5
CP6
CP7
CP8
RP1
RP2
RP3
RP4
ELEVATION
10.41
13.33
9.49
9.47
12.07
16.73
16.09
11.02
16.70
16.34
18.75
18.41
NORTHING
1000.00
1130.59
1628.70
1778.34
2275.28
2344.62
2488.00
2049.30
1043.42
1004.28
2320.72
2283.64
EASTING
1000.00
1058.14
1079.02
1164.52
1583.13
1628.56
1626.63
1428.42
1076.35
1060.56
1591.20
1627.06
DESCRIPTION
SCALE IN FEET
70 0 70 140
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
WEST GLACIER SPUR ROAD AREA ENHANCEMENTS EXISTING SITE SURVEY
JUNEAU RANGER DISTRICT
TMB 01/21/15
TMB 01/21/15
ACAD.DWG
19 24
SCALE:
WEST GLACIER EXISTING SITE LAYOUT - NORTH END
1" = 70'
SCALE:
WEST GLACIER EXISTING SITE LAYOUT - SOUTH END
1" = 70'
BRIDGE No. 1
℄ TOLCH ROCK TRAIL
STA. 14+00.21
1.5
8.33%
1.5
8.33%
B
EG
IN
N
IN
G O
F D
EC
K
PA
N
EL
S
TA
.5
EN
D
O F
D
EC
K
PA
N
EL
S
TA
.1
.5
ESTIMATED TYPICAL
WATER ELEVATION
SLOPE VARIES
EXISTING GROUND,
TYP
GLUED-LAMINATED LONGITUDINAL
SLAB TRAIL BRIDGE PER DRAWINGS
COMPACTED FILL PER
SPECIFICATIONS, TYP.
UNDISTURBED NATIVE
SOIL, TYP.
COMPACTED FILL PER
SPECIFICATIONS, TYP.
UNDISTURBED NATIVE
SOIL, TYP.
1'-0"
S
TA
.1
.8
1'-0"
.7
.6
.9
.4
.5
.4
.9
.4
.6
.9
.8
.8
.0
.2
.0
.4
.8
.7
.4
.5
.1
1.5
1'-0"
1.5
1'-0"
B
EG
IN
N
IN
G O
F D
EC
K
PA
N
EL
S
TA
EN
D
O F
D
EC
K
PA
N
EL
S
TA
.8
ESTIMATED TYPICAL
WATER ELEVATION
GLUED-LAMINATED LONGITUDINAL
SLAB TRAIL BRIDGE PER DRAWINGS
.7
T
O P
O F
D
EC
K
.9
.4
.3
.0
.9
COMPACTED FILL PER
SPECIFICATIONS, TYP.
UNDISTURBED NATIVE
SOIL, TYP.
EXISTING GROUND, TYP
DESIGN ELEVATION AT ℄ TRAIL/BRIDGE, TYP.
EXISTING GROUND EL. AT TRAIL ℄, TYP.
8.33%8.33%
8"
DESIGN ELEVATION AT ℄ TRAIL/BRIDGE, TYP.
EXISTING GROUND EL. AT TRAIL ℄, TYP.
BRIDGE No. 2
NOTES:
THE ELEVATIONS OF EXISTING GROUND SHOWN ARE APPROXIMATE.
FINISHED TOP OF DECK ELEVATIONS ARE BASED ON ARBITRARY DATUM. ELEVATION IS TO TOP
OF WEARING SURFACE.
REFER TO BRIDGE DRAWINGS (STD_963-20-01, STD_963-20-02a, STD_963-20-03a, STD_963-20-04) IN THIS SET FOR MORE INFORMATION.
1.
2.
3.
CLASS 2 RIPRAP
SCALE IN FEET
5 0 5 10
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
WEST GLACIER SPUR ROAD AREA ENHANCEMENTS TRAIL BRIDGES PROFILES
JUNEAU RANGER DISTRICT
HM 03/03/16
HM 03/03/16
ACAD.DWG
20 24
SCALE:
WEST GLACIER TRAIL BRIDGES PROFILES
1" = 5'
C U s e r s h m o r r i s o n D o c u m e n t s J o b s J R
D W e s t
G l a c i e r
J R
D
W e s t
G l a c i e r
T r a i l
F
L A
P D e s i g n b r i d g e s t u f f B
R I D
G E
P
R O
F I L E
C
U R
R E
N T d w g
M
C U s e r s h m o r r i s o n D o c u m e n t s J o b s J R
D W e s t
G l a c i e r
J R
D
W e s t
G l a c i e r
T r a i l
F
L A
P D e s i g n b r i d g e s t u f f S
T D d w g
NOTES:
ELEVATION
GRADE SHOWN = 0.0%
PLAN TYPICAL DECK PANEL SECTION W/RAILING SYSTEM
STRUCTURE
2" X 6" S4S RAIL FASTEN RAILS TO
POSTS W/(2)-#10 X 4" WOOD
SCREWS AT EACH CONNECTION
4" X 6" POST FABRICATE
W/TAPERED END (TOP) AND
W/(2)-11/16"Ø HOLES AT
BOTTOM
5/8"Ø ROD (LENGTH DEPENDS ON BRIDGE
WIDTH) W/PLATE WASHER 1/2" X 4" X 4"
(STEEL A36) & HEAVY HEX NUTS. THREAD
6" AT EACH END OF ROD.
MATCH DRILL 11/16"Ø
HOLES THRU DECK
PANELS @ 5'-0" CENTERS
MAXIMUM
7'-9"
**CLEAR WIDTH
POST CONNECTION
SEE SHEET 3 FOR DETAILS
℄ STRUCTURE
PO
S T
LE
N G
TH
V
A R
IE
S
*D
EC
K
PA
N
EL
D
EP
TH
'-6
/8
(T
YP
/2 D
EP
TH
ABUTMENT
ABUTMENT
LONGITUDINAL GLULAM DECK PANEL LENGTH OUT-TO-OUT AND RAILING SYSTEM
(SEE NOTE 1, THIS SHEET)
DECK PANEL SPAN ℄ BEARING TO ℄ BEARING (SEE NOTE 1, THIS SHEET)6" 6"
POSTS @ 5'-0" MAXIMUM SPACING
VARIES
2'-6"
MAXIMUM
VARIES
2'-6"
MAXIMUM
RAIL CAP ABOVE (SHOWN
DASHED)
40d RING SHANK NAILS SEE
NOTES FOR SPACING
5/8"Ø TIE ROD
TIE ROD
TIE RODS @ 5'-0" MAXIMUM SPACING
(SPACING MATCHES THAT FOR POSTS)
/2
(T
YP
2" X 6" X 4'-6" VERTICAL END SUPPORT FOR RAILS (TYP)
(2)-16d NAILS INTO EACH RAIL W/(2)-3/8"Ø X 3 1/2" LAG
SCREWS AT BASE
TIE ROD
3" DIMENSIONAL BACKING PLANKS
(TYP) FASTEN TO DECK PANEL
W/40d RING SHANK NAILS AT 12"
CENTERS ALONG TOP & BOTTOM
EDGES
GLULAM DECK PANEL (TYP)
4" X 6" POST (TYP)
POSTS SHALL BE
VERTICAL
SUBSTRUCTURE SHOW FOR ILLUSTRATION
ONLY. SEE SHEET 4 FOR DETAILS
2" X 8" S4S RAIL CAP FASTEN TO EACH
POST AND TO RAIL W/(2)-#10 X 4"
WOOD SCREWS ON 2'-0" CENTERS
1. SEE SHEET STD_963-20-01 FOR BRIDGE LENGTH AND DECK PANEL DEPTH.
2. GLULAM LONGITUDINAL DECK PANELS SHALL BE FABRICATED WITH A MINIMUM OF 8
LAMINATIONS PER DECK PANEL.
3. FASTEN RUNNING PLANKS TO DECK PANELS WITH 40d (5-INCH RING SHANK NAILS) AT
24-INCH SPACING. ALTERNATE SIDES WITH TWO AT EACH END.
4. SPLICE RAILS AT POSTS. RAILS SHALL BE CONTINUOUS FOR A MINIMUM OF TWO POST
SPACES. ALTERNATE RAIL SPLICES AT POSTS.
PERPENDICULAR WEARING SURFACE PLANKS FULL WIDTH*
B A C
KW
A
LL
H
EI
G H T
B A C
KW
A
LL
W
ID
TH
2" x 8" MINIMUM
RUNNING PLANKS
40d RING SHANK NAILS SEE
NOTES FOR SPACING
* FOR CLARITY, NOT ALL RUNNING PLANKS ARE SHOWN ** INSIDE FACE TO INSIDE FACE OF RAILING SYSTEM
***SEE DRAWING STD_963-20-01 FOR DETAILS ON GLULAM DECK
PANEL DEPTH, SPAN AND COMPOSITION.
1 1/2"
(TYP)
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
WEST GLACIER SPUR ROAD AREA ENHANCEMENTS GLULAM DECK PANEL TRAIL BRIDGE
JUNEAU RANGER DISTRICT
HM 04/08/16
HM 04/08/16
STD_963-20-02a.DWG 22 24
C U s e r s h m o r r i s o n D o c u m e n t s J o b s J R
D W e s t
G l a c i e r
J R
D
W e s t
G l a c i e r
T r a i l
F
L A
P D e s i g n b r i d g e s t u f f S
T D a d w g
U s e r s h m o r r i s o n D o c u m e n t s J o b s J R
D W e s t
G l a c i e r
J R
D
W e s t
G l a c i e r
T r a i l
F
L A
P D e s i g n b r i d g e s t u f f S
T D a d w g
U s e r s h m o r r i s o n D o c u m e n t s J o b s J R
D W e s t
G l a c i e r
J R
D
W e s t
G l a c i e r
T r a i l
F
L A
P D e s i g n b r i d g e s t u f f S
T D d w g
File details come from the government source that posted it. Updated .