(x)

AG-0109-S-16-0017

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

JUNEAU AK 99802

709 WEST 9TH STREET

ALASKA REGIONAL OFFICE

08/28/2016000002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/05/2016

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment is issued to document changes to the requirement as follows:

1. Project Drawings, Sheet 6. Delete the following text: "Clear and rehabilitate 350' of trail from parking lot to multi-use path intersection. See Detail 2, this sheet." Replace with the following text: "Clear and rehabilitate 310' of trail from parking lot to multi-use path intersection. See Detail 2, this sheet."

2. RFP Section B and Project Drawings. Delete Option Item 3.

3. Add the following to section C3 Technical Specifications: "Forest Service Handbook

Alaska Region (Region 10) Juneau Alaska. FSH 2509.22 Soil and Water Conservation Handbook

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

MARI MEINERS

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

AG-0109-S-16-0017/000002

for National Forest System Lands in Alaska. R-10

Amendment 2509.22-2006-2" and "USDA Forest

Service. National Best Management Practices

(BMP) for Water Quality Management on National

Forest System Lands. Vol. 1: National Core BMP

Technical Guide. FS-990a. 165 pp."

4. General Best Management Practices (BMP) for working in/around streams include (can vary on each project if there are threatened/endangered species or some type of special issue involved):

a. Clean all trucks and equipment to eliminate invasive weeds and other contaminants prior to arriving on-site.

b. Designate refueling, service, and staging areas away from surface waters and utilize secondary containment or collection devises to minimize potential for stream and groundwater contamination.

c. Recommend the use of vegetable oil or other biodegradable fuel for heavy equipment hydraulic when practicable during constructing near surface waters.

d. Develop an erosion and sediment control plan so that there is no erosion or sediment flowing into the streams during road work.

e. Schedule, to the extent practicable, construction activities to avoid direct soil and water disturbance during periods of the year when high precipitation is likely.

f. Routinely inspect construction site to verify that erosion and storm water controls are implemented and functioning as designed.

g. Construct road work in accordance with local, state and federal requirements.

h. Properly stabilize or rehabilitate disturbed areas following construction.

i. Ensure that hazardous spill kits are adequately stocked with necessary supplies and are maintained in accessible locations.

j. Have spill response materials on-site and ready to deploy if there is a fuel or oil spill.