Attachment 4 - Proposed Payment Schedule.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- Pilot-Scale Direct-Fired Cement Kiln System
- Solicitation number
- AFQ-2027-00113
- Issued by
-
Department of Energy Office of Science
About this file
This is a proposed payment schedule for the pilot-scale direct-fired cement kiln system project. The schedule outlines the contractor's anticipated invoicing and payment milestones throughout the contract performance period, detailing the breakdown of costs across major project phases including design, fabrication, assembly, testing, and delivery of the kiln system and associated components. The document serves as the financial roadmap for reimbursement, aligning payment releases with significant project deliverables and completion gates to ensure cash flow management and contractual compliance for the Department of Energy Office of Science.
The specific payment amounts, milestone descriptions, and invoicing timelines are structured in the spreadsheet to correspond with the technical progress of the pilot-scale cement kiln development. This attachment enables both the government and contractor to track financial expenditures against engineering and manufacturing achievements, ensuring transparency and proper accountability of federal funds allocated to this research and development effort.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| RFX# AFQ-2027-00113 | ||
| Proposed Payment Schedule | ||
| Deliverable | Description | Price |
| 6.1 | Completion of Project Kickoff Meeting | $0.00 |
| 6.2 | Baseline Project Schedule | $0.00 |
| 6.3 | 50% Design Package (high-level design review) | $0.00 |
| 6.4 | Initial Bill of Materials | $0.00 |
| 6.5 | 100% Design Package (final design review) | $0.00 |
| 6.6 | Factory Acceptance Test Plan | $0.00 |
| 6.7 | Draft Operational Documentation | $0.00 |
| 6.8 | Factory Acceptance Documentation (FAT report and punch list), and FAT completed | $0.00 |
| 6.9 | Equipment Delivery to the Flatirons Campus | $0.00 |
| 6.10 | Commissioning completed and Site Acceptance Test report | $0.00 |
| 6.11 | Operator training completion record, spare parts list, and warranty statement | $0.00 |
| 6.12 | Final Operational Documentation | $0.00 |
| 6.13 | Draft Final Technical Report | $0.00 |
| 6.14 | Final Technical Report incorporating NLR’s written comments on the draft | $0.00 |
Total Price $0.00