Question and Answers - 2 Sep 2020.pdf
PDF 165 KB Posted
- Attached to
- HVAC Services: Vent and Duct Cleaning Federal contract opportunity
- Solicitation number
- AFICC_FA3002-20-R-HVAC
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Statement of Work.pdf | ||
| Question and Answers - 4 Sep 2020.pdf | ||
| Amendment 5 Letter.pdf | ||
| Amendment 4 Letter.pdf | ||
| Attachment 1 - Statement of Work.pdf | ||
| Question and Answers - 4 Sep 2020.pdf | ||
| Amendment 3 Letter.pdf | ||
| Attachment 1 - Statement of Work.pdf | ||
| Amendment 2 Letter.pdf | ||
| Attachment 5 - Building 1852 Blueprint.pdf | ||
| Question and Answers - 1 Sep 2020.pdf | ||
| Question and Answers - 31 Aug 2020.pdf | ||
| Attachment 4 - Wage Determination No. 2015-4561 Rev. 13.pdf | ||
| Amendment 1 - RFQ Letter.pdf | ||
| Questions and Answers - 28 Aug 2020.pdf | ||
| Attachment 2 - Pricing Spreadsheet.xlsx | XLSX spreadsheet | |
| Attachment 1 - Statement of Work.pdf | ||
| Attachment 3 - Building Blueprints.pdf | ||
| RFQ Letter.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HVAC: Vent and Duct Cleaning - Questions & Answers
28 August 2020
QUESTIONS & ANSWERS PWS/TOPR
REFERENCE
Answered & Posted
1 Q: Can you tell me if there are any wage rate requirements in this solicitation?
A: The Service Contract Act applies to this solicitation.
Attachment 4 - Wage Determination, No. 2015-4561, Rev. 13 has been attached.
Attachment 4- Wage
Determination, No.
2015-4561, Rev. 13
Amendment 1
28 Aug 20
31 August 2020
2 Q: The bid documents stated the scope included cleaning ductwork servicing the 6 buildings referenced. Can you provide the square footage of the six (6) buildings?
A:
Building Sq. Ft.
646 6,974
746 16,279
1852 (AF spaces only) 6,122
3260 (AF spaces only) 14,130
4148 53,181
4149 103,054
Attachment 1 – Statement of Work dated 2 Sep 20
1 Sep 20
3 Q: Is the contractor required to be a member of NADCA (National Air Duct Cleaners Association)?
A: Please reference Amendment 2 and Attachment 1 – Statement of Work dated 2 Sep 20.
Attachment 2 – Statement of Work dated 2 Sep 20.
4 Q: Please clarify the hand wiping that is required in the SOW. Does that only apply to the grills only or does all the ductwork have to be hand wiped? If so that could be extensive.
31 Aug 20
A: Hand wiping specified in the SOW applies only to the grills.
5 Q: Please clarify if using hepa filtered vacuums/negative air machine in conjunction with an agitation devise (pneumatic air whip) is an acceptable method of cleaning the ductwork.
A: The cleaning shall be in accordance with NADCA/EPA standards for cleaning and disinfecting for COVID-19.
Attachment 2 – Statement of Work dated 2 Sep 20.
2 Sep 20
6 Q: Are the air handler units to be included?
A: Yes
7 Q: Are exhaust systems to be included?
A: Yes
8 Q: Are prevailing Wage Rates/Davis Bacon Wage Rates required to be used? If so can you provide?
A: The Davis Bacon Act is not applicable for routine maintenance. Please reference Attachment 4 - Wage Determination, No. 2015-4561, Rev. 13 and Question 1.
Attachment 4-Wage Determination, No.
2015-4561, Rev. 13
Amendment 1
31 Aug 20
9 Q: The contractor would not be required to put access into hard ceilings or hard surfaces to access ductwork, correct? For example drywall hatches would not be required, correct? I believe all ductwork to be cleaned is located over lay in ceiling tiles. Please verify.
A: It is not anticipated that the creation of access points through hard ceilings and drywall hatches will be required.
Ducts are accessible through removable ceiling tiles.
10 Q: Is this organization tax exempt or is sales tax applicable?
A: Sales tax is exempt.
11 Q: Clarify Bldg. 182 (280 Skyhawk Dr.). All that is shown on the drawing is piping no ductwork. Is there another drawing you can provide to show the ductwork needed to be cleaned?
A: Please reference Attachment 5 – Building 1852 Blueprint. The first floor is the AF office spaces as detailed in SOW.
Attachment 5 – Building 1852 Blueprint &
Attachment 1 – Statement of Work
2 Sep 20
1 Sep 2020
12 Q: Can someone please let me know if we are to be completing the duct work for this floor plan as I do see one "office" but several other rooms as well, and this is also a piping plan (Bldg. 1852)
A: Please reference question 11.
Attachment 5 – Building 1852 Blueprint &
Attachment 1 – Statement of Work
2 Sep 20
2 Sep 2020
13 Q: Is there a particular area on beta.sam I can find the positions approved for this contract? I realize it’s only for 6 weeks or less. I wasn’t sure if this was a factor or If this was a reason that I could not find this information.
A: The Government does not dictate the labor categories.
Please refer to Question 1 for SCA wage rate determination.
Attachment 4-Wage Determination, No.
2015-4561, Rev. 13
Amendment 1
2 Sep 20
14 Q: I also was wondering if it was permissible to hire a company (who is not a government contractor) who has the manpower to fulfill this contract for me.
A: The contractor has privy to hire a subcontractor to fulfill the contract.