Affidavit_of_Wages_Paid.pdf
PDF 111 KB Posted
- Solicitation number
- 2025-ITB-003
- Issued by
- Polk County, New Mexico
About this file
The document is an Affidavit of Wages Paid form issued by the Department of Workforce Solutions, Labor Relations Division, designed to be completed after construction is finished. The form requires detailed information from general contractors, subcontractors, and subsequent tier subcontractors, including company details, project information, and completion dates. Contractors must provide a signature certifying that all workers were paid at least the prevailing wage rates as determined by the Department of Workforce Solutions for the specific project.
The affidavit includes a certification that contractors understand they are subject to debarment procedures and must pay back wages if they violate Prevailing Wage Laws, such as incorrect job classification or improper wage payment. The form, revised on 08/23/13, mandates that all fields must be completed and the document must be sent to the contracting agency. Separate signed forms are required for each contractor, with specific instructions for general contractors, subcontractors, and subsequent tier subcontractors detailing the exact information and signatures needed.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AFFIDAVIT OF WAGES PAID
To Be Completed After Construction Is Complete
All FIELDS ARE REQUIRED
FORM MUST BE SENT TO THE CONTRACTING AGENCY
General Contractor Information Company Name:
Address:
City: State: Zip:
Phone: Fax: E-Mail:
Estimated Completion Date: State Wage Decision Number:
Project Title:
Project Physical Address:
Print Name:
General Contractor Signature:
Sub Contractor Information
Date you completed work on this project:
Company Name:
Address:
City: State: Zip:
Phone: Fax: E-Mail:
Sub Contractor Signature:
2nd, 3rd, etc. Tier Sub Contractor Information
Date you completed work on this project:
Company Name:
Address:
City: State: Zip:
Phone: Fax: E-Mail:
Tier Signature:
I hereby certify that the above information is correct and that all workers I employ on this public works project were paid no less than the Prevailing Wage Rate(s) as determined by the Department of Workforce Solutions, Labor Relations Division for this project as identified by the State Wage Decision Number. I understand that contractors who violate Prevailing Wage Laws (i.e., incorrect job classification, improper payment of prevailing wages, and/or overtime, etc.), are subject to debarment procedures and shall be required to pay any back wages due to workers. (Ref. Labor Relations Division Public Works Minimum Wage Act Policy Manual (11.1.2 NMAC) & Public Works Minimum Wage Act (13-4-11 through 13-4-18, NMSA 78)).
Contractor’s Signature Date
(Revised 08/23/13)
INSTRUCTIONS FOR COMPLETING AFFIDAVIT OF WAGES PAID
GENERAL CONTRACTOR
1. Enter general contractor information and provide signature.
2. Enter State Wage Decision Number as listed in bid documents. (Example: BE 13-0123 B)
3. Enter project title - listed in bid documents.
4. Enter project physical address - exact location of project (job site).
5. Enter completion date of project.
6. All Affidavits’ must be sent to the Contracting Agency.
SUB CONTRACTOR
1. Enter general contractor information, but general contractor signature is not needed.
2. Enter sub contractor information as indicated and provide signature.
3. Enter sub contractor completion date.
NOTE: A separate signed form is needed for each contractor.
2ND, 3rd, etc TIER SUB CONTRACTOR
1. Enter sub contractor information, subcontractor signature is not needed.
2. Enter 2nd tier sub contractor information and provide signature.
3. Enter 2nd tier contract completion date.
(Revised 8/23/13)
File details come from the government source that posted it. Updated .