M8.1.pdf
PDF 158 KB Posted
- Solicitation number
- AFCEC-26-R-0006
About this file
This is a Controls Plan technical drawing for a mechanical systems installation at Ben Eielson Jr. High School, Phase 3, located at Eielson Air Force Base in Alaska. The document is prepared by USKH for the Alaska District and references drawing number M8.1, dated 2/28/98.
The controls plan depicts the HVAC system layout and instrumentation for the facility, including thermal sensors, VAV box actuators, CO2 sensors, humidity sensors, heating control valves, VAV boxes with reheat coils, and static pressure sensors. The legend identifies seven different control components, each marked with numbered circles throughout the mechanical system schematic. A special note indicates that the DDC panel location is specified in the mechanical room above. The drawing shows the complete integration of building automation and environmental control systems required for the high school's mechanical infrastructure, with all sensors and control devices positioned to monitor and regulate temperature, humidity, pressure, and air quality throughout the facility.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .