This document is a site map showing the locations of electrical and communication infrastructure for GVEA (Golden Valley Electric Association) in Alaska near the Anderson Road area. The map depicts a 500 substation and associated switchstation for GVEA, with electrical service lines running at 14.4 KV single-phase voltage. The infrastructure includes a 24-count fiber optic communication line running along George Parks Highway and Anderson Road, connecting to the Alaska Railroad corridor. The map identifies specific elements including a 288CT fiber installation and a 24-phase electrical line, with the GVEA Switchstation marked at a key junction point. Communication lines are shown in green, while electrical lines are shown in red on the satellite imagery. The document appears to be a technical reference map for utility infrastructure planning or maintenance purposes rather than a federal contract solicitation document.

View the file

Other files

File Type Posted
Request to access Eielson KML File Instructions.pdf PDF
Alaska AI Data Center QA 6 Final.pdf PDF
Eielson AFB - 2024 Plume Map.pdf PDF
Alaska AI Data Center QA 5 Final.pdf PDF
A3.1.pdf PDF
S1.2.pdf PDF
S4.1.pdf PDF
A8.6.pdf PDF
A9.2.pdf PDF
S4.3.pdf PDF
M1.0.pdf PDF
C3.0.pdf PDF
S0.1.pdf PDF
A4.4.pdf PDF
A3.3.pdf PDF
E5.3.pdf PDF
E2.1.pdf PDF
A5.5.pdf PDF
M6.1.pdf PDF
A5.1.pdf PDF
AB3.pdf PDF
M1.1.pdf PDF
M2.2.pdf PDF
M5.2.pdf PDF
A9.3.pdf PDF
A8.5.pdf PDF
BEH 99 Asbuilts Architectural.pdf PDF
A3.4.pdf PDF
M8.1.pdf PDF
A5.6.pdf PDF
E5.1.pdf PDF
A6.2.pdf PDF
A3.5.pdf PDF
A5.4.pdf PDF
A3.8.pdf PDF
S4.2.pdf PDF
S3.2.pdf PDF
A4.1.pdf PDF
L2.pdf PDF
C5.0.pdf PDF
AF2.1.pdf PDF
M7.2.pdf PDF
S3.1.pdf PDF
A2.2A.pdf PDF
D2.1.pdf PDF
L4.pdf PDF
S1.1.pdf PDF
E4.1.pdf PDF
M4.1.pdf PDF
A7.1.pdf PDF
Show 40 more

Latest 50 of 115 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GVEA SWITCHSTATION

G

EO

RG

E

PA

RK

S

HW

Y

AL

AS

KA

R

AI

LR

O

AD

AN

DE

RS

ON

R D

COMMUNICATION LINES

ELECTRICAL LINES

500 SUBSTATION

CT

F

IB

ER

14.4 KV SINGLE-PHASE LINE

288CT

FIBER

24.9 KV

3-PHASE

LINE

138 KV

3-PHASE

LINE

File details come from the government source that posted it. Updated .