AFB-1 Advtsmnt Bids Contrctrs Agrmnt DBB R5-2024_IFB1 Emergency Generators.pdf
PDF 133 KB Posted
- Attached to
- Ft. Lyon Emergency Generator Upgrades
- Solicitation number
- IFB1-NHAA-2025000102
- Issued by
- Larimer County, Lakewood City, Colorado
About this file
This is an Advertisement for Bids (AFB) issued by the Colorado Department of Local Affairs for the Ft. Lyon Emergency Generator Upgrades project, a design/bid/build construction opportunity. The project involves upgrading emergency generators and electrical systems serving buildings 4, 6, and 8 at the Ft. Lyon campus, which functions as a supportive residential community for individuals experiencing homelessness. The estimated construction cost is $625,000, with an optional pre-bid meeting scheduled for October 30, 2024, at 11am. Sealed bids are due on November 11, 2024, at 11am, with a projected contract approval by December 30, 2024, and anticipated general contractor start date of January 6, 2025. Vendors must submit electronic proposals through BidNet, with the construction start/finish date to be determined based on equipment lead times.
Bidders must meet specific minimum requirements, including providing general contracting services for at least two projects over $400,000 in the last three years, demonstrating experience in similar project scope and complexity, and showing bonding capability up to $500,000. The project is subject to state prevailing wage rates, the Buy Clean Colorado Act requirements, and labor compliance tracking. Preference will be given to Colorado resident bidders and labor, and a bid bond of 5% is required for construction values of $50,000 or more. Potential bidders must provide environmental product declarations for eligible materials and comply with specific state regulations regarding labor, wages, and environmental standards.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OSA-AFB-1 pg. 1
REV 1/2024
ADVERTISEMENT FOR BIDS
Design/Bid/Build State of Colorado
Department of Local Affairs Notice Number: 1
IFB1-NHAA-2025000102
Project No: TBD Project Title: Ft. Lyon Emergency Generator Upgrades Estimated Construction Cost: $625,000
Settlement Notice For all projects with a total dollar value above $150,000 Notice of Final Settlement is required by C.R.S. §38-26-107(1). Final Settlement, if required, will be advertised in the same location as the original solicitation.
Project Description
The project will include various emergency generators and electrical upgrades for the generator's currently serving the Ft. Lyon campus buildings 4, 6 and 8. Review design drawings, specifications and work summary for full project description.
The Ft. Lyon campus currently functions as a supportive residential community housing persons experiencing homelessness. The campus will need to remain active and operational through the duration of the emergency generator upgrades. Any necessary power shutdowns or disruptions will need to be coordinated with Ft. Lyon program staff so that campus operations are impacted to the least extent possible.
Scope of Services
The scope over services entails various upgrades to the Ft. Lyon emergency generators and associated electrical systems that serve buildings 4, 6 and 8. Review scope of work summary and design drawings for the full scope of work.
Minimum Requirements
Notice is hereby given to all interested parties that all firms will be required to meet all minimum requirements to be considered for this project. Interested bidders should be prepared to show evidence of the following to be considered as qualified, as a minimum:
1. Provided General Contracting services within the last three (3) years for at least two (2) projects each in excess of $400,000 (hard costs), utilizing the expertise present in their Colorado Office;
and
OSA-AFB-1 pg. 2
2. Demonstrated specific General Contracting experience in projects of similar scope and complexity; and
3. Demonstrated bonding capability up to $500,000 for an individual project coincidentally with current and anticipated workloads; provide letter from surety that affirms this capacity.
4) Per C.R.S. §24-92-Part 2, a public construction project in the amount of five hundred thousand dollars or more shall be subject to the State prevailing wage rate, of the regular, holiday, and overtime wages paid and the general prevailing payments on behalf of employees to lawful welfare, pension, vacation, apprentice training, and educational funds in the State, for each employee needed to execute the contract. Payments to the funds must constitute an ordinary business expense deduction for federal income tax purposes by contractors and subcontractors.
Contractors are required to pay their employees at weekly intervals and shall comply with the enforcement provisions of C.R.S. §24-92-209. Contractors awarded a project of this size will be required to utilize the LCPTracker cloud-based labor compliance and certified payroll application.
Per C.R.S. §24-92-117, a public construction project in the amount of five hundred thousand dollars or more shall be subject to the Buy Clean Colorado (BCCO) Act program requirements.
The BCCO Act requires the Office of the State Architect to establish a maximum acceptable global warming potential (GWP) limit for each category of eligible materials, which include asphalt and asphalt mixtures, cement and concrete mixtures, glass, post-tension steel, reinforcing steel, structural steel, and wood structural elements. For any solicitation for a contract for the design of an eligible project, a State Agency or institution shall require the designer who is awarded the contract to include, in project specifications when final construction documents are released, a current Environmental Product Declaration (EPD) that meets the maximum acceptable GWP limits for each eligible material specified for the project. A contractor that is awarded a contract for an eligible project shall not install any eligible materials on the project until the contractor submits an EPD for each eligible material procured for the project.
Firms meeting the minimum requirements may obtain the bidding documents on the website accompanying this advertisement.
Other Information
Preference shall be given to Colorado resident bidders and for Colorado labor, as provided by law.
Per C.R.S. §24-105-201 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid.
Pre-Bid Meeting
An optional Pre-Bid Meeting will be held at:
Address: 30999 Co Rd 15, Las Animas, CO 81054 Room: Outside building 5 on 3rd street Date/Time: Wednesday October 30th at 11am.
OSA-AFB-1 pg. 3
Schedule/Submission Details
1. The schedule of events for the AFB process and an outline of the schedule for the balance of the project is as follows:
Advertisement 10/25/24 Optional Pre-Bid Conference and Tour 10/30/24 @ 11am Date Email Questions Due 10/31/24 @ 2pm Date Email Answers Issued 11/4/24 @ 10am Sealed Bids Due/Public Bid Opening 11/11/24 @ 11am Negotiation of General Contractor Contract 11/12/24 Contract Approval (projected) 12/30/24 Anticipated Design Start N/A - Designs Complete Anticipated General Contractor Start 1/6/25 Anticipated Construction Start/Finish TBD based on equipment lead time
2. Vendors must respond electronically through BidNet. If you need assistance please contact BidNet’s vendor support department at 800-835-4603. Option 2, https://www.bidnetdirect.com/ Please note that vendors must register on BidNet in order to submit their proposals electronically. This is a free service. Upload a zip folder that is titled with the #: IFB1-NHAA- 2025000102, Ft. Lyon Emergency Generators Upgrades and the offerors name as noted below:
Insert AFB number here_ Insert AFB Title here_ Company Name
Comments: Late bids will be rejected without consideration. The Department of Local Affairs and the State of Colorado assume no responsibility for costs related to the preparation of submittals.
3. The above schedule is tentative. Responding firms shall be notified of revisions in a timely manner by email or posted on ColoradoVSS website. Respondents may elect to verify times and dates by email, but no earlier than 36 hours before the scheduled date and time.
Point of Contact/Clarification
Name: Brett Appel - DOLA Agency: Department of Local Affairs Phone: 720-668-0383 Fax: N/A Email: brett.appel@state.co.us
This Notice is also available on the web at:
https://prd.co.cgiadvantage.com/PRDVSS1X1/Advantage4 Media of Publication(s): Colorado VSS and Bidnet Publication Dates: October 25, 2024 https://urldefense.proofpoint.com/v2/url?u=https-3A__www.bidnetdirect.com_&d=DwQGaQ&c=sdnEM9SRGFuMt5z5w3AhsPNahmNicq64TgF1JwNR0cs&r=51MoPZ6uTnsX17xDC825V2jmB6YRfaO7Z0LLSvdlkkU&m=Wd1pEkuEQDxYUGNtp0rL9nbm_3FhoJqAgJAuCEnBEjQ&s=pJ2Uj5TyLrYhwIQJUwQKfck885OlcUUld2oI5fhDM_k&e= https://urldefense.proofpoint.com/v2/url?u=https-3A__www.bidnetdirect.com_&d=DwQGaQ&c=sdnEM9SRGFuMt5z5w3AhsPNahmNicq64TgF1JwNR0cs&r=51MoPZ6uTnsX17xDC825V2jmB6YRfaO7Z0LLSvdlkkU&m=Wd1pEkuEQDxYUGNtp0rL9nbm_3FhoJqAgJAuCEnBEjQ&s=pJ2Uj5TyLrYhwIQJUwQKfck885OlcUUld2oI5fhDM_k&e= mailto:brett.appel@state.co.us https://urldefense.proofpoint.com/v2/url?u=https-3A__prd.co.cgiadvantage.com_PRDVSS1X1_Advantage4&d=DwMFaQ&c=sdnEM9SRGFuMt5z5w3AhsPNahmNicq64TgF1JwNR0cs&r=y4NXvnZF0G_9xm7aCiy1k6-L5VGt1prk6Qj29OyMbU4&m=XYGsrAm2M8IsNsNe-WcdpMj3apPedKHjHxjn8EIHyqLltAHS8LvemwLVLAWu8Xve&s=-_IU0MUTu1OZimhYDWCuIsetKBxrWGY8XtUXL3vte6s&e=
OSA-AFB-1 pg. 4
APPENDICES:
Appendix A: Information for Bidders (SBP-6.12)
Appendix B: Bid Form (SBP-6.13)
Appendix B1: Bid Alternates (SBP-6.131)
Appendix B2: Bid Bond (SBP-6.14)
Appendix C: Sample: Direct Labor Burden Calculation (SBP-6.18)
Appendix D: Applicable Prevailing Wage, Apprenticeship and Fringe Rates
Appendix E: Sample SC6.21 Design/Bid/Build Contractor’s Agreement
Appendix E1: Sample SC6.23 General Conditions of the Contract
Appendix F: Scope of Work Summary
Appendix F1: Ft. Lyon Emergency Generators Upgrades Design Drawings
Appendix F2: Ft. Lyon 600Kw Generator Specification
Appendix F3: Ft. Lyon Campus Map
File details come from the government source that posted it. Updated .