This file contains architectural drawings and construction specifications for the Administration Building Lobby Renovation project at Fraser Public Schools. The project encompasses comprehensive renovation of the lobby area and adjacent spaces, including demolition of existing finishes, installation of new flooring, doors, windows, lighting, security features, and wall treatments. Key work items include removal and replacement of 12x12 vinyl tile flooring with new luxury vinyl tile (LVT) and cove base throughout the lobby and stair areas; installation of two new 3'-0" x 7'-0" flush wood solid core doors with hardware and security features; replacement of existing stairs with new rubber cove base, treads, risers, and nosings; installation of new gypsum board wall surfaces and complete interior painting; replacement of ceiling tiles and light fixtures; and installation of security enhancements including SG4 security glass windows, a police emergency button, and removal and reinstallation of existing security cameras.
The project specifications detail specific technical requirements for all materials and installations, including verification of existing conditions in the field prior to fabrication and ordering. Notable security-focused elements include the installation of security glass with specific slot and voice hole configurations in window frames, connection of a new police emergency button to the existing district security system, and coordination with the owner for camera reinstallation and emergency button placement. The drawings indicate multiple rooms affected by the renovation (Offices 101, 102, 103, Lobby 100, Hallway, and stair systems), with notes requiring verification of frame openings, color coordination with the owner, and identification of electrical outlet and switch box locations to ensure proper alignment with new wall surfaces.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEMOLITION NOTES:
A. Remove existing wood door, hardware, HM frame and wire glass complete.
B. Remove existing surface mounted light fixture. Circuits and switching to be reused for new lights.
C. Remove sliding glass panels and wood trim.
D. Remove existing 12x12 vinyl tile floor and 4" cove base in entire room.
E. Remove existing rubber stair treads and risers and 4" cove base complete on all stairs and landing from first floor to lower level.
F. Remove existing metal threshold .
G. Existing floor register to remain.
H. Remove existing 12x12 vinyl tile on landing.
J. Remove vinyl reducer strip at carpet edge.
A
B
C
A
D
D
A
BJS
BJS
02-21-2020
A-1.1
Fraser Public Schools Administration Building Lobby Renovation
LOBBY
HALLWAY
OFFICE
OFFICE
STAIR
E
201865
F
H
G
E
J
J
BJS
BJS
02-21-2020
A-1.2
Fraser Public Schools Administration Building Lobby Renovation
OFFICE
STAIR
HALLWAY
OFFICE
LOBBY
NEW WORK NOTES:
1. New LVT floor tile and new 4" vinyl cove base in entire room.
2. New 3-0x7-0 flush wood solid core door (stain) in new HM frame (paint) with 1/4" laminated glass sidelite. Verify frame opening in field prior to ordering new frame. Hardware to be: closer, hinges, Classroom Lockset with lever handle, wall stop and kick plate.
3. New vinyl reducer strip at LVT/carpet edge.
4. Apply new 3/8" gypsum board over all wall surfaces full ht. then Paint all walls in room full ht.
5. Paint existing 12x12 acoustic tile ceiling.
6. Fill in hole in ceiling tile prior to painting.
7. New 1x4 surface mounted, 2 lamp, LED light fixture, connect to existing circuits and switching.
8. Existing supply air diffuser to remain. (Clean and Paint)
9. New acrylic signage surface mounted to exterior wall. (By owner)
10. Paint existing frames and walls full ht to match adjacent color. Verify color with owner.
11. New Rubber 4" vinyl cove base, stair treads, risers, nosings and landing surface on all existing stairs from first floor to lower level.
12. New 3-0x7-0 flush wood solid core door (stain) in new HM frame (paint) with SG4 security glass in sidelite. Verify frame opening in field prior to ordering new frame. Hardware to be: closer, hinges, Classroom Lockset with lever handle, wall stop and kick plate.
13. New SG4 security glass with 2"x14" slot on bottom and 1/2" dia. voice holes in 8" dia. circular pattern in new HM window frame (paint). Frame size to be +/- 34"Wx33"H (V.I.F.) See Detail No.1/A-1.4
14. Cut new base to stop/start each side of existing plastic corner guard for new base work.
15. Cut new flooring around existing floor register.
16. Extend existing light switch boxes and receptacle boxes as required to be flush with new wall surface. Verify quantities and sizes in room.
17. Existing wall mounted security camera to be removed and reinstalled by Owner.
18. New Police Emergency button on wall. Connect to existing District security system. Exact location TBD by owner.
19. Patch walls after frame removal and paint to match existing colors.
20. Provide new wood casing on both side and all around new HM frame. Stain to match new doors.
201865
See Drawing No.A-1.3 for extent of painting
A-1.3
02-21-2020
OFFICE
OFFICE
OFFICE
201865
FRASER PUBLIC SCHOOLS
ADMINISTRATION BUILDING
LOBBY RENOVATION
F
See Remarks (V.I.F.)
Flush
6'-8"
6'-8"
6'-8"
F
F
F
1. Verify existing frame opening in field prior to fabrication of new door/frame
2. Provide Laminated glass in frame openings
3. Provide security glass in frame openings
4. Frame opening +/-5'-0"x6'-10" (V.I.F.)
5. Frame opening +/-4'-7"x6'-10" (V.I.F.)
6. Remove existing strike release/wiring and re-install same in new frame
,3,4,6
,2,4
,2,5
WINDOW DETAIL NO. 1
No Scale
Existing wall
Existing wall
New HM frame set inside existing opening. (Verify opening size in field)
New SG4 security glass in new HM frame
Provide 2"high x14"wide slot centered in bottom of glass
New 1/2" dia. holes in circular pattern in SG4 glass
New cont. sealant both sides and all around new frame
| A-1.1 Demolition |
| A-1.2 New Work |
| A-1.3 Painting |
| A-1.4 Details |