This document is an Addendum for the Cantini Mosaic Reinstallation project issued by the City of Pittsburgh Office of Management and Budget on July 7, 2023, involving specific requirements for the general and electrical contractors. The project involves the reinstallation of the Cantini Mosaic, with additional coordination needed for security camera relocation and electrical infrastructure modifications within a tunnel location.
The addendum outlines two primary contractor responsibilities: first, the general contractor must coordinate with Pittsburgh Regional Transit (PRT) to relocate an existing wall-mounted security camera on the south wall of the tunnel, with PRT's IT Consultant managing the actual camera relocation while maintaining continuous video surveillance; second, the electrical contractor is tasked with removing and subsequently reinstalling electrical outlets, boxes, and covers in their original locations after wall finish installation. No specific pricing, funding sources, or contract term details are provided in this addendum document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Cantini_Mosaic_Reinstallation_(Addendum_#7_Revision).pdf | ||
| Additional_Requirements_2.docx | DOCX document | |
| Prevailing_Wages_Rates.pdf | ||
| 2023_0511_Cantini_Permit_Project_Manual.pdf | ||
| 2023_0511_Cantini_Permit_Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cantini Mosaic Reinstallation Addendum Information July 7, 2023
Additional requirements for the General contractor and Electrical contractor:
· Prior to the start of any demolition, the general contractor shall coordinate with Pittsburgh Regional Transit (PRT) to have the existing wall mounted security camera located on the south wall of the tunnel opposite the escalators as depicted on drawing 2/A-201 relocated. PRT’s IT Consultant will either permanently or temporarily relocate the security camera to maintain video surveillance throughout the project. The General Contractor will not be responsible for the removal or relocation.
· The electrical contractor shall remove the existing electrical outlets, boxes, and covers as required at demolition and reinstall in the same location when the wall finishes are installed.