This is an addendum to an Invitation for Bid (IFB 26-018-DN) issued by the City of Leesburg, Florida for an Aviation Fuel Facility project. The addendum, issued on July 25, 2026 by Daniel J Nickols, PE, Associate Vice President of AVCON, Inc., addresses questions submitted by interested bidders regarding project scope and requirements. The document clarifies that the project has already received approval from the City of Leesburg Design Review Committee, and the contractor must obtain a building permit prior to construction of a bathroom facility. The addendum specifies the division of responsibilities for electrical work between the contractor and the City's Electrical Department.
Regarding electrical installation responsibilities, the City of Leesburg Electrical Department will furnish all electrical materials and be responsible for installing electrical cable, performing splicing and terminations, installing transformers, pedestals and switchgear, making final electrical connections, and energizing the system. The contractor is responsible for procuring and retrieving electrical materials from the City, installing underground conduit, pull strings, transformer pads, pedestal pads, and junction structures. Costs associated with purchasing and retrieving materials, as well as City-performed electrical installations, shall be charged to the project under the SP-02 Electrical Allowance bid item and reimbursed through the same line item. All bidders must acknowledge receipt of this addendum on their Proposal Bid Form, and submission of a bid constitutes acknowledgment of receipt.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE: July 25th, 2026
TO: All Interested Bidders and Other Interested Parties
FROM: Daniel J Nickols, PE – Associate Vice President, AVCON, Inc.
The City of Leesburg makes the following changes, additions, deletions, information, and/or clarifications and now considers the addendum a part of the IFB Document. Bidders must acknowledge receipt of this addendum by indicating receipt in the space provided on the Proposal Bid Form. If the bidder has already submitted the Proposal Bid Form to the City’s Procurement Division, the Bidder should revise their electronic submission to include this addendum. In any case, the submission of a bid is an acknowledgment of receipt of the addendum. The City will construe all bids received as though the
Bidder has received and acknowledged the addendum.
Below is the City’s reply to RFIs (Request for Information – a/k/a bid inquiries or questions) submitted by interested parties by the posted deadline to submit RFIs.
Q1. Will a building permit be required for the bathroom?
A1. The project has already been approved by City of Leesburg Design Review Committee. The
Contractor shall be required to apply for and attain a building permit prior to construction of the bathroom. Engineer/Architect will provide signed and sealed building drawings for inclusion in the building permit application.
Q2. Please clarify which portions of the electrical installation are to be performed by the Contractor and which are to be performed by the City, if any.
A2. The City of Leesburg Electrical Department will furnish all electrical materials for this project. The
Contractor shall procure and pick up the required electrical materials (including, but not limited to, conduit, elbows, connectors, pull string, and associated appurtenances) from the City of Leesburg.
The costs associated with purchasing and retrieving these materials shall be charged to the project under the SP-02 Electrical Allowance.
The Contractor shall install all underground conduit, pull strings, transformer pads, pedestal pads, and junction structures.
The City of Leesburg Electrical Department shall install all electrical cable, perform all splicing and
IFB 26-018-DN
Aviation Fuel Facility
Addendum No. 4 terminations, install all transformers, pedestals, and switchgear, make all final electrical connections, and energize the system.
Bid items for electrical material installation are included under the SP-02 Bid Items. Payments made by the Contractor to the City of Leesburg for electrical materials and City-performed electrical installations shall be reimbursed through the SP-02 Electrical Allowance bid item.
ACKNOWLEDGMENT - Addendum No. 4
Company Name
Signature of Officer
Type/Print Officer's Name & Title