ADDENDUM TO FAR 52.212-2 EVALUATION FACTORS FOR AWARD Oct24.pdf

PDF 179 KB Posted

Attached to
Tinker Base Supply and Munitions
Solicitation number
FA810126R0001
Issued by

About this file

This document is an Attachment 5 - Evaluation Factors for Award for a federal contract solicitation involving Base Supply and Munitions services. The procurement will use a Tradeoff Source Selection procedure, with the government intending to select one contractor through a comprehensive evaluation process focusing on three primary factors: Technical, Past Performance, and Price.

The Technical evaluation will assess three subfactors: Program Management and Orientation Plan, Manpower and Organization Chart, and Quality Control Plan, each rated on an acceptable/unacceptable basis. Past Performance will be evaluated using performance confidence assessments ranging from Neutral to Satisfactory Confidence, considering relevancy, recency, and quality of prior contract work. Price will be analyzed for reasonableness, balance, and realism, with a Total Evaluated Price (TEP) calculated across a 30-day Phase-In Period, 11-month Base Period, six one-year Option Periods, and a potential 6-month Extension Period. The solicitation emphasizes that for technically acceptable proposals, Past Performance is considered more important than Price, and the government reserves the right to award to a higher-rated, higher-priced offeror if deemed to provide the best overall value.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 5 – EVALUATION FACTORS FOR AWARD

ADDENDUM TO FAR 52.212-2

EVALUATION FACTORS FOR AWARD

1.0. Source Selection (SS)

1.1. Basis for Contract Award

This acquisition will utilize Tradeoff Source Selection procedures, with technical proposals, to make an integrated assessment for a best value award decision.

Tradeoffs will be made only between Past Performance and Price among those offerors who have been determined technically acceptable. Award will be made to the Offeror who is deemed responsible in accordance with the Federal Acquisition Regulation (FAR) Part 9, as supplemented, whose proposal conforms to the solicitation’s requirements (to include all stated terms, conditions, representations, certifications, and all other information required by FAR 52.212-1 and its Addendum of this solicitation) and is judged, based on the evaluation factors, to represent the best value to the Government. This may result in an award to a higher rated, higher priced Offeror, where the decision is consistent with the evaluation factors, and the Source Selection Authority (SSA) reasonably determines the technically acceptable proposal, and superior past performance of the higher priced offeror outweighs the price difference with lower priced offerors.

1.1.1. The SSA will base the source selection decision on an integrated assessment of proposals against all source selection criteria in the solicitation (described below).

While the Government Source Selection Evaluation Board (SSEB) and the SSA will strive for maximum objectivity, the Source Selection process, by its nature, is subjective and, therefore, professional judgment is implicit throughout the entire process.

1.1.2. This source selection is conducted in accordance with Federal Acquisition Regulation (FAR) Part 15.3, Contracting by Negotiation, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), the Department of the Air Force Federal Acquisition Regulation Supplement (DAFFARS), DoD Source Selection Procedures 20 August 2022, and Department of the Air Force Mandatory Procedures 5315.3. These regulations are available electronically at www.acquisition.gov.

1.2. Number of Contracts to be Awarded:

The Government intends to select one contractor for this acquisition. However, the Government reserves the right not to award a contract at all, depending on the quality of the proposals and prices submitted and the availability of funds.

1.3. Correction Potential of Proposals:

The Government will consider throughout the evaluation, the correction potential of any technical proposal aspect evaluated as a deficiency. The correction potential shall be based on the amount and/or complexity of the corrections needed to meet Government requirements.

http://farsite.hill.af.mil/vffara.htm http://www.acquisition.gov/

1.4. Competitive Range Determination

If discussions are conducted, the Government shall establish a competitive range comprised of the most highly rated proposals, in accordance with FAR 15.306(c).

During the evaluation process multiple competitive range determinations may be made that eliminate Offerors from the competition IAW FAR 15.505. The competitive range determination can be based on Factor 1 Technical, Factor 2 Past Performance, Factor 3 Price, or a combination of the three factors. A competitive range determination may eliminate Offerors based on their initial proposal evaluation results, after discussions (if necessary), prior to issuance of the Final Proposal Revision (FPR) request, or for efficiency. If Offerors are excluded from the competitive range they may request a debriefing IAW FAR 15.505.

1.6. Discussions

The Government intends to award without discussions, but reserves the right to conduct discussions if necessary. Therefore, it is imperative that Offerors submit their best terms initially. However, if during the evaluation period it is determined to be in the best interest of the Government to hold discussions, the Government will determine if responses to Evaluation Notices (ENs) received during discussions will be considered formal proposal revisions, or if offerors will be required to include EN responses in the Final Proposal Revision (FPR). The Request for FPR letter will include specific instructions on how offerors will submit FPRs. The Government also reserves the right to request Draft FPRs during discussions. Offeror responses to ENs for Volume II (Past Performance) shall not be included in the FPR. Offeror responses to Past Performance ENs during discussions will automatically be considered in the final evaluation.

1.7. Reviews and Visits

Site visits have not been planned for this effort. However the SSEB may conduct site visits during the evaluation phase to gather information for judging the Offeror’s potential for correcting deficiencies, quality of development of manufacturing practices/processes, or other areas useful in evaluating the offer. If conducted, the results will be assessed under the applicable factors/subfactors and will be used to validate and confirm the Offeror’s written proposal.

1.8 Solicitation Requirements (Terms and Conditions)

Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and Performance Work Statement (PWS) requirements, in addition to those identified as factors and subfactors. Failure to comply with the terms and conditions of the solicitation may result in the Offeror being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and must provide complete supporting rationale. The Government reserves the right to determine any such exceptions unacceptable, and the proposal, therefore, ineligible for award.

2.0. Evaluation Factors

2.1. Evaluation Factors and Subfactors

2.1.1. Evaluation factors used to evaluate each proposal:

Award will be made to the offeror proposing the combination of factors deemed most advantageous to the Government based upon an integrated assessment of the evaluation factors described below.

Factor 1: Technical Subfactor 1: Program Management and Orientation Plan Subfactor 2: Manpower and Organization Chart Subfactor 3: Quality Control Plan

Factor 2: Past Performance Factor 3: Price

2.1.2. Relative Importance of Factors and Subfactors:

For this solicitation, technical acceptability is a prerequisite to the best value analysis and potential trade-off between Past Performance and Price. For all technically acceptable proposals, Factor 2 (Past Performance), is considered more important than Factor 3 (Price). This acquisition is being conducted as a performance price trade-off source selection.

2.1.3. Evaluation Methodology:

The Government will evaluate all factors concurrently for all proposals. Initial ratings for all factors will be established for each offeror in determining the competitive range. The proposals shall be evaluated against the subfactors listed in paragraph 2.2 below. The Government technical evaluation team will evaluate the technical proposals on a pass/fail basis, assigning ratings of Acceptable, or Unacceptable in Table 2.2.1 below.

Past Performance will be evaluated as described in paragraph 2.3 below. Price will be evaluated as described in paragraph 2.4 below. For the award decision, the SSA will assess the Past Performance ratings, along with supporting information, and Price for all technically acceptable offers to make an integrated assessment of which offeror provides the overall best value.

2.2. Factor 1 – Technical

The Technical evaluation will be based on each’s offeror’s approach for meeting the technical requirements listed below. The evaluation focuses on the technical approach as described in each offeror’s technical volume. The technical evaluation does not consider price. Each subfactor within the technical factor will receive one of the ratings described in the criteria listed below. Individual subfactor ratings will be used to determine the overall technical acceptability of each offeror. To be determined technically acceptable at the factor level, the Offeror must be rated acceptable in each subfactor. A single deficiency within a subfactor will result in an unacceptable rating for that subfactor. A final unacceptable subfactor assessment will determine an overall technical unacceptable rating and, therefore, unawardable. Only those proposals determined to be technically acceptable, either initially, or as a result of discussions, will be considered for award. The technical evaluation will also consider risk in determining overall acceptability. Risk pertains to the potential for unsuccessful contract performance. Risk will not receive a separate rating, rather, it will be inherent within the subfactor ratings, and the overall Technical rating

The rating definitions for Subfactors 1 and 2 are as follows:

Table 2.2.1 Technical Acceptable/Unacceptable Rating Method

Rating Description Acceptable Proposal meets the requirements of the solicitation.

Unacceptable Proposal does not meet the requirements of the solicitation.

2.2.1. Subfactor 1: Program Management and Orientation Plan

The Government will assess the Offeror’s proposed Program Management and Orientation Plan approach. Offerors are required to present all the information as stated in the Instruction to Offerors (ITO), Addendum to FAR 52.212-1. The subfactor minimum is met when the Offeror’s proposal indicates an adequate understanding of the requirements, and provides convincing rationale how their approach will meet the requirements for all of the following essential elements with little potential for disruption of schedule, or degradation of performance:

a. Approach for security and security clearance which ensures all requirements of PWS paragraph 1.17 and all sub-paragraphs are met.

b. The proposal must ensure the approach to transition ensures the offeror will be fully operational at contract start day with no disruption of services IAW PWS paragraphs 1.24 and all subparagraphs.

c. The proposal must ensure contractor mobilization efforts are uninterrupted and no impact to the flying training mission. The proposal must address PWS paragraph 1.28 and all subparagraphs.

2.2.2. Subfactor 2: Manpower and Organization Chart

The Government will assess the Offeror’s proposed Offeror’s proposed Manpower and Organization Chart approach. Offerors are required to present all the information as stated in the Instruction to Offerors (ITO), Addendum to FAR 52.212-1. The subfactor minimum is met when the Offeror’s proposal indicates an adequate understanding of the requirements, and provides convincing rationale how their approach will meet the requirements for all of the following essential elements with little potential for disruption of schedule or degradation of performance:

a. The approach must ensure that all Base Supply and Muntions function requirements can be successfully met in accordance with PWS 1.6.1.9 and DESR 6055.09_DAFMAN 91-201 as it relates to minimal manning requirements for explosive operations.

2.2.3. Sub-factor 3: Execution Plans

The Government will assess the Offeror’s proposed Execution Plans. Offerors are required to present all the information as stated in the Instruction to Offerors (ITO) Addendum to FAR 52.212-1. The sub-factor minimum is met when the Offeror’s proposal indicates an adequate understanding of the requirements and provides convincing rationale how their approach will meet requirements for all of the following essential components with little potential for disruption of schedule, increased cost or degradation of performance:

a. Quality Control Plan.

The Offeror’s proposed plan must ensure all quality control requirements of PWS paragraphs 1.8 and sub-paragraphs are met.

2.3. Factor 2 – Past Performance:

The Past Performance evaluation assesses the degree of confidence the Government has in an offeror’s ability to supply products and services that meet users’ needs, including cost and schedule, based on a demonstrated record of performance.

2.3.1. Ratings:

The Past Performance factor will receive one of the following performance confidence assessment ratings IAW the Department of Defense (DoD) Source Selection Procedures.

Note: With regards to the best value award decision, all offerors rated as “Satisfactory Confidence” will be considered equal for the Past Performance Factor.

TABLE 5- PERFORMANCE CONFIDENCE ASSESSMENTS

Rating Description

SATISFACTORY

CONFIDENCE

Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

NEUTRAL

CONFIDENCE

No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.

The offeror may not be evaluated favorably or unfavorably on the factor of past performance.

LIMITED CONFIDENCE

Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.

NO CONFIDENCE

Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.

2.3.2. Evaluation Process:

The Past Performance evaluation considers the Offeror’s demonstrated record of performance in providing products and services that meet users’ needs. Performance confidence is assessed at the overall Past Performance factor level after evaluating aspects of the Offeror’s recent past performance, focusing on performance that is relevant to the Technical subfactors and Price assessment. More relevant performance may have a greater impact on the Performance Confidence Assessment than less relevant effort. More recent performance may have a greater impact on the Performance Confidence Assessment than less recent performance. The Government may consider past performance in the aggregate in addition to an individual contract basis. In conducting the Past Performance evaluation, the Government reserves the right to use both the information provided in the Offeror’s Past Performance proposal volume and information obtained from other sources, such as, but not limited to, the Past Performance Information Retrieval System (PPIRS) or similar systems, Defense Contract Management Agency (DCMA) and commercial sources. The Government reserves the right to use all information available to fully assess the Offeror’s past performance.

2.3.2.1. Recency Assessment:

An assessment of the past performance information will be made to determine if it is recent. To be recent, the effort must have been performed during the past three (3) years from the date of issuance of this solicitation. If any part of the performance falls within the above timeframe, the contract in its entirety may be evaluated for past performance. Past performance information that fails this condition will not be evaluated.

2.3.2.2. Relevancy Assessment:

The Government will conduct an in-depth evaluation of all recent performance information obtained to determine how closely the products provided/services performed under those contracts relate to the Technical subfactors and Price assessment. Consideration will be given to things such as similar service, similar complexity of the effort, breadth and depth of skills, similar contract scope and type, contract magnitude and schedule. A relevancy determination of the Offeror’s (including joint venture partner(s) and major and critical subcontractor(s)), as defined in paragraph

4.0 of Addendum to FAR 52.212-1) past performance will be made based upon the aforementioned considerations. In determining relevancy for individual contracts, consideration will be given to the effort, or portion of the effort, being proposed by the Offeror, teaming partner, or subcontractor whose contract is being reviewed and evaluated. The Government will consider the portion of the effort accomplished on previous/current contracts compared to the portion to be performed on the proposed effort. For example: Past Performance for a subcontractor for Program Management will only be considered if that same subcontractor is to perform Program Management on the proposed effort.

The past performance information submitted by offerors along with information obtained from other sources will be used to establish the degree of relevancy of past performance. The Government will use the following degrees of relevancy described in the DoD Source Selection Procedures, paragraph 3.1.3.1, Table 4, when assessing recent, relevant contracts:

Degree Description

VERY RELEVANT

(VR)

Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

RELEVANT

(R)

Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

SOMEWHAT RELEVANT

(SR)

Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

NOT RELEVANT

(NR)

Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

Scope, magnitude and complexity will be assessed based on the prime or subcontractor/teaming partners proposed role or effort as it relates to the past performance effort. The Government may or may not utilize all or some of the following to determine the elements examined within scope, magnitude, complexity, and price:

Scope: Relevancy in regard to scope may be assessed based on, but not limited to, the similarities between a given Past Performance effort and logistics & supply management, mobility support, weapons vault, and munitions. Consideration may be given to the following submissions (in descending order of relevance) when determining past performance:

1. Weapons Vault

2. Munitions Related Efforts

3. Mobility Support

4. Logistics & Supply Management

Magnitude: Relevancy in regard to magnitude may be assessed based on, but not limited to, the similarities between a given Past Performance effort and the proposed requirement. Consideration may be given to the following elements when determining relevancy with regard to magnitude:

1. Quantity of equipment managed and number of transactions processed.

2. Contract value as it relates to the portion of effort proposed to perform.

Complexity: Relevancy in regard to complexity may be assessed based on, but not limited to, the similarities between a given Past Performance effort and the requirements of this solicitation as it relates to the following.

1. Ability to perform two sperate and unique functions within the same contract i.e.

Supply Material Management and Munitions Management.

2. Ability to meet organizational needs for 3 separate wings, Air Logistics Center (ALC), depot maintenance and 45 on/off base tennant units.

Price Assessment Past Performance Relevancy: Relevancy in regard to cost/price will be assessed primarily based on similarity between contract type of previous effort as compared to the current FFP Base Supply and Munitions requirement. Only FFP past performance will be considered relevant to this requirement.

2.3.2.3. Performance Quality Assessment:

The Government will consider the performance quality of recent, relevant efforts. The quality assessment consists of an in-depth evaluation of the past performance questionnaire responses, PPIRS information, Contractor Performance Assessment Reports (CPARS) (including ratings and supporting narratives), interviews with Government customers and fee determining officials and, if applicable, commercial clients. It may include interviews with DCMA officials or other sources known to the Government. The quality assessment may result in positive or adverse findings.

Adverse is defined as past performance information which the Government determines to be less than satisfactory performance quality. For adverse information identified, the evaluation will consider the number and severity of the problem(s), mitigating circumstances, and the effectiveness of corrective actions that have resulted in sustained improvements when determining the quality assessment. Taking mitigating corrective actions may or may not result in a higher quality rating. The Government will use the following quality levels when assessing recent, relevant efforts:

Quality Assessment Description

EXCEPTIONAL (E)

(BLUE)

During the contract period, contractor performance is meeting (or met) all contract requirements and consistently exceeding (or exceeded) some or many.

Very few, if any, minor problems encountered.

Contractor took immediate and effective corrective action.

SATISFACTORY (S)

(GREEN)

During the contract period, contractor performance is meeting (or met) all contract requirements. For any problems encountered, contractor took effective corrective action.

MARGINAL (M)

(YELLOW)

During the contract period, contractor performance is not meeting (or did not meet) some contract requirements. For problems encountered, corrective action appeared only marginally effective, not effective, or not fully implemented. Customer involvement was required.

UNSATISFACTORY (U)

(RED)

During the contract period, contractor performance is failing (or fail) to meet most contract requirements.

Serious problems encountered. Corrective actions were either ineffective or non-existent. Extensive Customer oversight and involvement was required.

UNKNOWN (UK)

Unknown Performance rating due to lack of sufficient information to assign a rating.

2.3.3. Assigning Ratings:

As a result of the relevancy and quality assessments of the recent contracts evaluated, offerors will receive an integrated performance confidence assessment rating based on the definitions provided in paragraph 2.3.1 above. Although the past performance evaluation focuses on performance that is relevant to the Technical subfactors and Price assessment, the resulting performance confidence assessment rating is made at the factor level and represents an overall evaluation of contractor performance.

Offerors without a record of relevant past performance or for whom information on past performance is not available will not be evaluated favorably or unfavorably on past performance and, as a result, will receive a "Neutral Confidence" rating for the Past Performance factor.

More relevant performance will have a greater impact on the Performance Confidence Assessment than less relevant effort. A record of Somewhat Relevant to Very Relevant past performance, which may result in Satisfactory, or Limited Confidence, may be considered more advantageous to the Government than a Neutral Confidence rating.

Likewise, a more relevant past performance record may receive a higher confidence rating and be considered more favorably than a less relevant record of favorable performance.

2.4. Factor 3 –Price

Price proposals will be evaluated for (1) price reasonableness (including completeness),

(2) unbalanced pricing, (3) price realism, and (4) Total Evaluated Price. Offerors whose price is determined incomplete, unreasonable, or unrealistic will not be considered for award. Additionally, an offeror’s price may be rejected, if it contains unbalanced pricing to the extent it poses an unacceptable risk to the Government.

The Government shall evaluate the TEP of all offerors. This TEP price rollup is based on the specific CLIN calculation methodology provided below. These calculations will include all evaluation periods: the Phase-In Period, the Basic Period, all Option Periods, and the 6 Month Extension Period. The Extension Period is in accordance with Clause 52.217-8, Option to Extend Services. The Offeror’s price proposal will be based on the prices proposed in Attachment 2, Pricing Matrix.

2.4.1. Price Reasonableness

The proposed prices will be evaluated for reasonableness. Analysis of price proposals will be performed using one or more of the techniques defined in FAR 15.404-1(b)(2) in order to determine price reasonableness. Reasonableness must represent a price to the Government a prudent person would pay in the conduct of competitive business.

Normally, price reasonableness is established through adequate price competition, but may also be determined through price analysis techniques as described in FAR 15.404- 1(b)(2). The Government may also use other techniques as needed.

2.4.2. Balanced Pricing

Offerors’ proposals will be reviewed for unbalanced pricing. The Government will evaluate any supporting information provided by the Offeror explaining variances that appear unbalanced. Evaluated offers that are determined to be unbalanced may be deemed ineligible for award by the Contracting Officer if a determination is made that lack of balance poses an unacceptable risk to the Government. Unbalanced pricing exists when, despite an acceptable total price, the price of one or more line items is significantly over or understated as demonstrated by application of price analysis techniques, such that:

a) There is reasonable doubt the offer would result in the lowest overall cost to the Government, even though it is the lowest priced Offeror; or

b) The offer is so grossly unbalanced; its acceptance would be tantamount to allowing an advanced payment.

2.4.3. Price Realism

Proposed prices will be evaluated for price realism. To be realistic, the proposed price must demonstrate an adequate understanding of the requirement, and must ensure the price does not pose an unacceptable risk to performance. All documentation submitted to support price realism will be considered in making a determination of price realism.

To evaluate price realism, the Government intends to use one or more of the price analysis techniques described in FAR 15.404-1(b)(2). The Government may also use other evaluation techniques, as needed.

2.4.4. Data Other than Certified Pricing Data

If requested by the CO, data other than certified pricing data shall be evaluated to support a determination of reasonable and balanced pricing. This information will only be requested if all other sources have been insufficient to support a determination of reasonable and/or balanced pricing.

2.4.5. Total Evaluated Price (TEP):

Pricing proposals will be reviewed for compliance with Addendum to FAR 52-212-1 pricing instructions. Proposed pricing evaluated as the TEP is required in accordance with the following format.

The TEP will be calculated as the sum of the Offeror’s proposed prices for 30 days Phase-in Period, 11)-months Base Period, 6 one year Option Periods and a 6-month Extension Period in accordance with FAR 52.217-8 “Option to Extend Services”.

The 6-month Extension Period unit prices will be based on the proposed Option Period 6 unit prices. The 6-month Extension Period under FAR 52.217-8 will only be utilized if necessary.

TEP will be used for evaluation purposes only. Evaluation of options shall not obligate the Government to exercise such options. The 6-month Extension Period is not to be considered part of Option [6] Period and will be a separate option exercise if it is utilized.

1.0. Source Selection (SS)
1.1. Basis for Contract Award
1.2. Number of Contracts to be Awarded:
1.3. Correction Potential of Proposals:
2.0. Evaluation Factors
2.1. Evaluation Factors and Subfactors
2.1.1. Evaluation factors used to evaluate each proposal:
2.2. Factor 1 – Technical
2.4. Factor 3 –Price

File details come from the government source that posted it. Updated .