Addendum Three.pdf
PDF 181 KB Posted
- Attached to
- RFB-71-27 KHP Stalls & Mats New Comp Barn BP-2
- Solicitation number
- RFB 785 2700000110 7
- Issued by
- Fayette County, Kentucky
About this file
This is an addendum issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, for Invitation to Bid No. RFB-71-27, a re-advertisement of RFB-264-25 for stalls and mats at the New Competition Barns BP-2 located at Kentucky Horse Park in Lexington, Kentucky. Addendum Three, dated September 14, 2026, mandates that bidders use a revised Subcontractor page in place of the previously issued version. The project requires the submission of a list of proposed subcontractors with the bid proposal, covering three branches of work: interlocking rubber stall mats, equine stall systems fabrication, and equine equipment installation. All blanks on the subcontractor form must be completed, with bidders indicating either the name of the subcontractor or "PRIME/GENERAL CONTRACTOR" if the work will be performed directly by the prime contractor.
All proposed subcontractors are subject to approval by the Division of Engineering and Contract Administration and will be reviewed and evaluated on the bid opening day. Failure to submit a completed subcontractor list may result in bid rejection. If the Commonwealth requests replacement of a subcontractor identified as the apparent low bidder, the bidder must provide an acceptable replacement subcontractor prior to close of business on the bid opening day, or the bid may be rejected. The bidder bears sole responsibility for selecting and offering qualified and competent subcontractors to accomplish the intended work. If subcontractor review and evaluation cannot be completed on the bid opening day, replacement procedures will be determined based on the specific circumstances of each situation.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-71-27
FOR: Re-Advertisement of RFB-264-25 Stalls and Mats New Competition Barns BP-2 Kentucky Horse Park Lexington, Kentucky
DATE: September 14, 2026
RFB-785-2700000110
ADDENDUM NO. Three (3)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Bidders must use Revised Subcontractor page in lieu of previously issued.
END OF ADDENDUM
Invitation to Bid No. RFB-71-27 For: Re-Advertisement of RFB-264-25 Stalls and Mats New Competition Barns BP-2 Kentucky Horse Park Lexington, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
RFB-71-27
REVISED
OFFICIAL BID DOCUMENT
FOR
RE-ADVERTISEMENT OF RFB-264-25
STALLS AND MATS
NEW COMPETITION BARNS BP-2
KENTUCKY HORSE PARK
LEXINGTON, KENTUCKY
LIST OF PROPOSED SUBCONTRACTORS:
(Must be submitted with Bid)
The following list of proposed subcontractors is required by the owner to be executed, completed, and submitted with the Bidder’s Proposal. All subcontractors are subject to approval by the Division of Engineering and Contract Administration, Department of Facilities and Support Services, Frankfort, Kentucky. Failure to submit this list, completely filled out, may result in bid rejection.
If certain branches of work are to be done by the Prime Contractor, so state. This means that the Prime WILL BE performing the work, and it WILL NOT be subcontracted without approval by DECA. Review/evaluation of subcontractors will occur on the bid opening day. If the Commonwealth requests replacement of a subcontractor, on bid opening day, then the apparent low bidder will provide a replacement subcontractor prior to close of the Commonwealth’s business day on that day. Failure of the apparent low bidder to comply with the preceding sentence may result in bid rejection. If subcontractor review/evaluation is not completed on the bid opening day, then procedures for any replacement will be issued based on the uniqueness of each situation. The responsibility for selection, offering of qualified, competent subcontractors to accomplish the work intended is solely the responsibility of the bidder to the Commonwealth.
ALL BLANKS MUST BE FILLED IN. IF PERFORMED BY THE BIDDER, STATE PRIME/GENERAL
CONTRACTOR.
BRANCH OF WORK NAME OF SUBCONTRACTOR
1. Interlocking Rubber Stall Mats
2. Equine Stall Systems Fabricator
3. Equine Equipment Installation Contractor
| Addendum Three |
| Item 1: Bidders must use Revised Subcontractor page in lieu of previously issued. |
| END OF ADDENDUM |
| REVISED Bid Documents |
| REVISED |
| OFFICIAL BID DOCUMENT |
File details come from the government source that posted it. Updated .