Addendum Three.pdf

PDF 181 KB Posted

Attached to
RFB-71-27 KHP Stalls & Mats New Comp Barn BP-2
Solicitation number
RFB 785 2700000110 5
Issued by
Kentucky

About this file

This is Addendum Three to Invitation to Bid No. RFB-71-27, issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, for the re-advertisement of RFB-264-25 regarding stalls and mats for the New Competition Barns BP-2 at Kentucky Horse Park in Lexington, Kentucky. The addendum, dated September 14, 2026, mandates that bidders must use the revised Subcontractor page in place of the previously issued version. The project requires bidders to identify proposed subcontractors across three branches of work: Interlocking Rubber Stall Mats, Equine Stall Systems Fabricator, and Equine Equipment Installation Contractor. All subcontractors are subject to approval by the Division of Engineering and Contract Administration, and if certain branches of work will be performed by the prime contractor, bidders must so indicate on the form.

The revised bid document requires complete submission of the List of Proposed Subcontractors with each bid proposal, with all blanks mandatorily filled in. Subcontractors will be reviewed and evaluated on the bid opening day, and if the Commonwealth requests replacement of a subcontractor, the apparent low bidder must provide a qualified replacement prior to close of business on that same day. Failure to submit the completed subcontractor list or to comply with replacement requests may result in bid rejection. The responsibility for selecting qualified and competent subcontractors rests solely with the bidder.

View the file

Other files

File Type Posted
Final_RFB_785_2700000110_5_SO_FORM.PDF PDF
Final_RFB_785_2700000110_2_SO_FORM.PDF PDF
Final_RFB_785_2700000110_1_SO_FORM.PDF PDF
Final_RFB_785_2700000110_3_SO_FORM.PDF PDF
Addendum Two.pdf PDF
Addendum Four.pdf PDF
Final_RFB_785_2700000110_4_SO_FORM.PDF PDF
Addendum One.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-71-27

FOR: Re-Advertisement of RFB-264-25 Stalls and Mats New Competition Barns BP-2 Kentucky Horse Park Lexington, Kentucky

DATE: September 14, 2026

RFB-785-2700000110

ADDENDUM NO. Three (3)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Bidders must use Revised Subcontractor page in lieu of previously issued.

END OF ADDENDUM

Invitation to Bid No. RFB-71-27 For: Re-Advertisement of RFB-264-25 Stalls and Mats New Competition Barns BP-2 Kentucky Horse Park Lexington, Kentucky

Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration

RFB-71-27

REVISED

OFFICIAL BID DOCUMENT

FOR

RE-ADVERTISEMENT OF RFB-264-25

STALLS AND MATS

NEW COMPETITION BARNS BP-2

KENTUCKY HORSE PARK

LEXINGTON, KENTUCKY

LIST OF PROPOSED SUBCONTRACTORS:

(Must be submitted with Bid)

The following list of proposed subcontractors is required by the owner to be executed, completed, and submitted with the Bidder’s Proposal. All subcontractors are subject to approval by the Division of Engineering and Contract Administration, Department of Facilities and Support Services, Frankfort, Kentucky. Failure to submit this list, completely filled out, may result in bid rejection.

If certain branches of work are to be done by the Prime Contractor, so state. This means that the Prime WILL BE performing the work, and it WILL NOT be subcontracted without approval by DECA. Review/evaluation of subcontractors will occur on the bid opening day. If the Commonwealth requests replacement of a subcontractor, on bid opening day, then the apparent low bidder will provide a replacement subcontractor prior to close of the Commonwealth’s business day on that day. Failure of the apparent low bidder to comply with the preceding sentence may result in bid rejection. If subcontractor review/evaluation is not completed on the bid opening day, then procedures for any replacement will be issued based on the uniqueness of each situation. The responsibility for selection, offering of qualified, competent subcontractors to accomplish the work intended is solely the responsibility of the bidder to the Commonwealth.

ALL BLANKS MUST BE FILLED IN. IF PERFORMED BY THE BIDDER, STATE PRIME/GENERAL

CONTRACTOR.

BRANCH OF WORK NAME OF SUBCONTRACTOR

1. Interlocking Rubber Stall Mats

2. Equine Stall Systems Fabricator

3. Equine Equipment Installation Contractor

Addendum Three
Item 1: Bidders must use Revised Subcontractor page in lieu of previously issued.
END OF ADDENDUM
REVISED Bid Documents