Addendum No. 4 to ITB 26-23-214657: Bridge 158.7 Replacement
This addendum issued by Alaska Railroad Corporation (ARRC) modifies the Invitation to Bid for Bridge 158.7 Replacement at Milepost 158.7 near Cottonwood Creek in Wasilla, Alaska, and extends the bid closing date from July 15, 2026, to July 22, 2026, at 3:00 PM AKST. The project involves complete replacement of an existing six-span timber bridge with a new two-span precast concrete ballast deck bridge on steel pipe piles, including sheet pile abutments, reinforced concrete pile caps, bulkhead and riprap installation, track work, and site restoration. The addendum provides clarification on the revised Statement of Work, including substantial completion requirements, railroad flagging responsibilities, and permit acquisition allocations between ARRC and the contractor. ARRC will provide railroad flagging for track protection for 80 days; the contractor is responsible for furnishing additional flagging through ARRC's Right-of-Way Department for any time needed beyond that period. Substantial completion is required on or before March 31, 2027, with all work items properly completed, approved by the owner, and fully serviceable for intended use.
The addendum addresses clarification on permitting requirements, establishing that ARRC is acquiring major regulatory authorizations including permits from the Alaska Department of Fish and Game, U.S. Army Corps of Engineers Nationwide Permit program, and applicable Floodplain Development Permits. The contractor is responsible for acquiring city/borough-required permits, Storm Water Pollution Prevention Plans (SWPPP), Temporary Water Use Permits (TWUP), Traffic Control Permits (TCP), and noise pollution permits if required for work during extended hours in the Matanuska-Susitna Borough/Wasilla area. The addendum includes responses to 14 bidder questions addressing material substitutions, design clarifications regarding riprap section placement, and staging area specifications, with no clearing or grubbing permitted in designated staging areas. Bidders must acknowledge receipt of this addendum and all previous addenda in their supply bid form submission.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ALASKA RAILROAD CORPORATION
327 W. Ship Creek Ave.
Anchorage, AK 99501 wallaces@akrr.com
Phone (907)265-2425 Cell (907)744-0031
ADDENDUM NO. 4
Invitation to Bid (ITB) 26-23-214657 Bridge 158.7 Replacement Alaska Railroad Corporation Date: July 10, 2026
This Addendum is issued to provide response to bidder questions, clarify the Statement of Work, clarify permitting requirements, and extend the bid opening date. The information contained in this Addendum modifies and becomes a part of the Invitation to Bid and Contract Documents. Bidders shall incorporate all requirements, clarifications, and revisions contained herein into their bid proposal.
The bid closing date has been extended by this Addendum from July 15, 2026, to July 22, 2026, at 3:00
PM AKST.
Section C (Statement of Work): is hereby revised and replaced as set forth in this Addendum. The revised Scope of Work includes clarification of substantial completion date for bridge demolition and replacement activities, railroad flagging responsibilities, and permit acquisition requirements.
REVISED FLAGGING PROVISION
ARRC will provide a Railroad Flagger for track protection, holding authority over the track when able, and communicate train traffic to the contractor for 80 days. Additional time needed to complete track fouling work is the contractor’s responsibility to furnish a flagger through ARRC’s ROW Department.
REVISED COMPLETION DATES
Substantial Completion: Substantial Completion shall be on or before March 31, 2027, unless accepted and agreed upon by the Owner. This completion scope includes all work items contained within the Contract Documents, properly completed, approved by the Owner and fully serviceable for the intended use.
QUESTION AND ANSWERS:
8. (REVISED) Special Provision Contractor Requirements & Section 107-1.02:
The Owner will: 1. Secure permits and licenses specified in the Special Provisions that the Owner determines are required for the construction of the proposed project, and the use of mandatory sources, designated sources and designated material disposal areas for the proposed project;
“The Contractor shall: 1. Acquire any permits and licenses required to complete the project that are not acquired by the Owner;”
There are no permits specified in the Special Provisions or attached to the ITB Documents.
mailto:wallaces@akrr.com
It is also our experience that the Owner obtained permits are the necessary permits and authorizations to allow for the design and construction of the project at time of bid, such as National Environmental Policy Act (NEPA), Section 106 Consultation, State Cultural Resource Investigation Permit (SCRIP), Fish Habitat Permits, Clean Water Act Permits, Wetlands Permits, National Marine Fisheries Service Permits, U.S. Army Corps of Engineers Permits.
It is our experience that “Contractor Permits” are permits such as Storm Water Pollution Prevention Plan (SWPPP), Temporary Water Use Permits (TWUP), Traffic Control Permits
(TCP).
The Contractor has not been part of the ARRC’s discussions and planning with agencies and is not aware of any permits needed beyond the normal SWPPP, TWUP’s and TCP’s that is standard to our work.
a. What necessary permits and/or agency authorizations are required to begin work?
b. Has the ARRC obtained the necessary permits and authorizations for the project to be constructed as designed and advertised?
c. Have Permits and Authorizations been secured for the Temporary Access, shown in the Contract Documents?
“Contractor Permits” are permits such as Storm Water Pollution Prevention Plan (SWPPP), Temporary Water Use Permits (TWUP), Traffic Control Permits (TCP), any noise pollution permits required to work inside the MSB/Wasilla during 12-24 hour work periods.
A. City/borough required permits, SWPPP, TWUP, TCP, and NPP (if required)
B. ARRC is currently pursuing and coordinating required state and federal regulatory authorizations for this project, specifically the Alaska Department of Fish and Game (ADFG), the U.S. Army Corps of Engineers (USACE) Nationwide Permit (NWP) program, and the applicable Floodplain Development Permit authority. Permit review and approval processes are ongoing, and the selected contractor shall comply with all permit conditions upon issuance.
C. See answer above (B & C combined response).
12. Can D1 be used in lieu of C1? We are being told D1 is readily available but C1 will need to be made.
A substitution of D1 for C1 can be approved based on submitted material certifications.
13. Sheet 08 of 12 and Sheet 10 of 12 appear to show the top of riprap at one constant elevation coming around the sheet pile cells, is this the case or is the riprap supposed to follow the ground line coming around and up on the sheet pile cell?
Riprap section needs to follow the groundline around and up the sheet pile cell.
14. Access and Storage
The areas highlighted can be used for staging materials and equipment. No clearing or grubbing is permitted in these areas. The area to the east of the tracks is smaller than highlighted in the question, see the “Area of potential effect” shape in the attached APE Figures dated January 19, 2023.
Please acknowledge receipt of this and all addenda in your firms Supply Bid Form (Form 395-0129).
Sincerely, Contract Administration Specialist Alaska Railroad Corporation
A L
A S K
A
RA I L R OAD CO
R P
O R
A T
I O
N
E S T . 1 9 1 4
ALASKA RAILROAD CORP.
A L
A
SK
A
R
AILROAD CORPORA
T
IO
N
EST. 1914
AutoCAD SHX Text
BRIDGE 158.7
AutoCAD SHX Text
COTTONWOOD CREEK
AutoCAD SHX Text
E. GLENWOOD AVE
AutoCAD SHX Text
OLD MATANUSKA RD
AutoCAD SHX Text
(FEET)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ANCHORAGE, ALASKA 99510-7500
AutoCAD SHX Text 327 W. Ship Creek Avenue
AutoCAD SHX Text P.O. Box 107500
AutoCAD SHX Text
PROJECT LOCATION WASILLA, AK)
AutoCAD SHX Text
STATE MAP NTS
AutoCAD SHX Text 1/19/2023
AutoCAD SHX Text
FIGURE 1 OF 2
AutoCAD SHX Text MP 158.7 COTTONWOOD CREEK BRIDGE AREA OF POTENTIAL EFFECT CONTRACTOR WORK / STAGING AREA
AREA OF POTENTIAL EFFECTS
AutoCAD SHX Text
RIVERINE WETLAND *
AutoCAD SHX Text
RIVERINE CHANNEL *
AutoCAD SHX Text
* WETLANDS SHOWN WERE CAPTURED FROM THE HDR FIELD STUDY JULY, 2024.
AutoCAD SHX Text
RIPRAP
AutoCAD SHX Text
ARRC MAINLINE CENTERLINE
AutoCAD SHX Text
ARRC RIGHT OF WAY
AutoCAD SHX Text
TEMPORARY FILL
AutoCAD SHX Text P:\PROJECTS\01 PROJECTS\01 BRIDGES & STRUCTURES\BR 158.7\01 PRE CONSTRUCTION\DRAWINGS\MP158.7_IMPACTS_FIGURE.DWG
AutoCAD SHX Text
DRAWING LOCATION:
AutoCAD SHX Text
APPLICANT:
AutoCAD SHX Text
PERMIT NO:
AutoCAD SHX Text
WATERWAY:
AutoCAD SHX Text
LOCATION:
AutoCAD SHX Text
SHEET OFOF
AutoCAD SHX Text DATE: October 31, 2024October 31, 2024
AutoCAD SHX Text
ALASKA RAILROAD CORPORATION
AutoCAD SHX Text
LAT: N, LONG: W
AutoCAD SHX Text
HORIZONTAL DATUM NAD83 AK STATE PLANE 4
AutoCAD SHX Text
FEET
AutoCAD SHX Text
AutoCAD SHX Text
EXTENTS OF WETLANDS FIELD STUDY
AutoCAD SHX Text
COTTONWOOD CREEK
AutoCAD SHX Text
E GLENWOOD AVE.
AutoCAD SHX Text
PALMER-WASILLA HIGHWAY
AutoCAD SHX Text
MP 158.7
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BR 158.7 REPLACEMENT
AutoCAD SHX Text
FILL IMPACTS
AutoCAD SHX Text 61.5746°
AutoCAD SHX Text 149.4127°
AutoCAD SHX Text
TBD
AutoCAD SHX Text
COTTONWOOD CREEK
AutoCAD SHX Text
SEC 11, T17N, R1W, SM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MP 158.6
AutoCAD SHX Text
TYPE A
AutoCAD SHX Text
VOLUME (CYD)
AutoCAD SHX Text
AREA (ACRES)
AutoCAD SHX Text
FILL TYPE
AutoCAD SHX Text
ABOVE OHW
AutoCAD SHX Text
BELOW OHW
AutoCAD SHX Text
ABOVE OHW
AutoCAD SHX Text
BELOW OHW
AutoCAD SHX Text
RIPRAP
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 0.04
AutoCAD SHX Text 0.01
AutoCAD SHX Text
TEMP. FILL
AutoCAD SHX Text 9,700
AutoCAD SHX Text
AutoCAD SHX Text 1.30
AutoCAD SHX Text
AutoCAD SHX Text
TYPE A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 0.05
AutoCAD SHX Text
AutoCAD SHX Text
EXCAVATION
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 0.04
AutoCAD SHX Text 0.01
AutoCAD SHX Text
BENT
AutoCAD SHX Text
BRIDGE
AutoCAD SHX Text
SHEET PILE
AutoCAD SHX Text
AutoCAD SHX Text
FEET
AutoCAD SHX Text
AutoCAD SHX Text
CLEARING AND GRUBBING
| ADDENDUM NO. 4 |
| QUESTION AND ANSWERS: |