Addendum No. 4 -Beartrap Stream Crossing.pdf

PDF 656 KB Posted

Attached to
751/19232. ABG; Beartrap Stream/ Ionia Creek Bridge Rplcmnt
Solicitation number
RFQ - 171 - 230000000313
Issued by
Ionia County, Michigan

About this file

This document is Addendum No. 4 to the Snowmobile Trail 8/Sunrise Grade - Beartrap Stream Crossing and Ionia Creek Crossing Bridge Replacement project in Alger, Michigan, issued by UP Engineers & Architects, Inc. on behalf of the Michigan Department of Technology, Management and Budget (DTMB) and the Michigan Department of Natural Resources (DNR). The addendum clarifies, modifies, and changes the original plans and specifications, and includes a sign-in sheet from a mandatory pre-bid walkthrough as well as soil boring logs.

The contract opportunity involves the replacement of bridges at the Beartrap Stream Crossing and Ionia Creek Crossing. The bid package must acknowledge receipt of this addendum, and it is to be included with the bid submission. The bid submission deadline and award date are not provided. The contract term and any renewal options are also not specified.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

707 Ashmun Street Sault Ste. Marie, MI 49784

906-645-0522 • 800-867-0522 • Fax: 906-645-0622

Offices also in:

Houghton

Iron Mountain Ishpeming Marinette

U.P. Engineers & Architects, Inc.

www.UPEA.com

[M22-02472]

ADDENDUM NO. 4

TO THE

SNOWMOBILE TRAIL 8/SUNRISE GRADE – BEARTRAP STREAM CROSSING AND

IONIA CREEK CROSSING BRIDGE REPLACEMENT

ALGER, MI

ADDENDUM NO. 4 is issued April 27, 2023, to clarify, modify, and/or change the original plans and specifications issued by UP Engineers and Architects. This ADDENDUM NO. 4 is hereby made part of the Contract Documents for the contract noted below.

File No. 752/29242.ABG Beartrap Stream Crossing and Ionia Creek Crossing Bridge Replacement

Please acknowledge receipt of this ADDENDUM NO. 4 on the appropriate blank on the Bid Form and also include this addendum with the bid package.

GENERAL

1. See attached sign in sheet from the mandatory pre-bid walk through.

2. See attached soil boring logs.

END OF ADDENDUM NO. 4

Prepared by:

U.P. Engineers & Architects, Inc

DTMB-0441 (R 19.02)

MEETING ATTENDANCE RECORD

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

PROJECT DESCRIPTION/LOCATION Snowmobile Trail 8/Sunrise Grade – Beartrap Stream Crossing and Ionia Creek Crossing

DATE

2023-04-25

TIME

1:30 p.m.

FILE NUMBER

751/19232.ABG

CONTRACT

NUMBER

MEETING PLACE

DNR, Newberry Office, 5666 M-123, Newberry, MI 49868

PLEASE PRINT YOUR NAME

FIRM YOU REPRESENT

EMAIL ADDRESS

TELEPHONE NUMBER

Jeremy K. Gagnon

U.P.E.A.

jgagnon@upea.com

906-635-0511

Aaron S. Janke

U.P.E.A ajanke@upea.com

906-482-4810

Robert A. Fraser

Maverick Cons.

rfraser@aaamaverick.

906-643-9220

Jerry D'Ambrosio

Associated Cons.

jerjoe88081@gmail.co

906-251-8704

Nate Peck

NK Environmental LLC nate@nkenvironmental

231-631-5243

Jason Pascoe

DTMB

pascoej2@michigan.go

Will Rajala

WR Construction, LLC rajalaw@wrcmqt.com

FIELD LOG

mid

PROJECT Ionia Creek Bridge DATE STARTED July 2022 DRILLER BM JOB NO. DTMB-DNR LOCATION 46.50191, -86.25214 Sunrise Grade DATE COMPLETED Aug. 4, 2022 HELPER EB BORING NO. SB-1

SAMPLE

NO.

DEPTH (ft) DRILLING

OR

SAMPLING

METHOD

SPLIT SPOON BLOWS

SAMPLE DESCRIPTION

FROM TO 0"-6" 6"-12" 12"-18" 18"-24"

SB-1 2.5’ 4.0’ S/S 3 5 5 Uniform Medium Sand

5.0’ 6.5’ S/S 2 4 6 Uniform Medium Sand

7.5’ 9.0’ S/S 4 7 10 Medium Sand with trace Coarse & trace Gravel

10.0’ 11.5’ S/S 15 15 11 Dark brown Medium / Coarse Sand

15.0’ 16.5’ S/S 1 2 3 Light uniform Medium / Fine Sand

20.0’ 21.5’ S/S 1 1 2 Medium / Fine Sand

25.0’ 26.5’ S/S 2 2 3 Uniform Medium Sand

27.5’ 28.5’ Auger Gravel seam – (Firm Drilling)

30.0’ 31.5’ S/S 3 4 2 Mixed Gravel / Medium Sand with trace Silty Sand

35.0’ 36.5’ S/S 4 6 8 Mixed Medium Sand with trace Silty Sand

40.0’ 41.5’ S/S 5 6 7 Medium Sand with trace Pea Stone

41.5’ 43.0’ Auger Gravel Seam – (Firm Drilling)

45.0’ 46.5’ S/S 5 5 8 Clean Uniform Light Brown Medium Sand

50.0’ 51.5’ S/S 8 9 11 Clean Uniform Light Brown Medium Sand

51.5’ Tri-cone End of boring

BACKFILL METHOD WATER LEVEL OBSERVATION

NATURAL SOILS WL: 7. 0’ WS or WB

CEMENT GROUT WL: . AFTER BORING

BENTONITE & CEMENT WL: . HRS/AFTER BORING

OTHER Pavement Patched w/ Blacktop PAGE OF

File details come from the government source that posted it. Updated .