Addendum No. 1 - FINAL.pdf
PDF 53 KB Posted
- Solicitation number
- RFQ - 171 - 230000000313
- Issued by
- Ionia County, Michigan
About this file
This document is Addendum No. 1 issued by U.P. Engineers & Architects, Inc. on March 14, 2023, for the Snowmobile Trail 8/Sunrise Grade - Beartrap Stream Crossing and Ionia Creek Crossing Bridge Replacement project in Alger, Michigan. The addendum clarifies, modifies, and/or changes the original plans and specifications for this contract. A mandatory pre-bid conference will be held on April 5, 2023, at 11:00 a.m. local time at the Natural Resources, Newberry Wildlife Division Office, Cusino/Shingleton Field Office in Newberry, Michigan, followed by a site tour. Prospective bidders are required to attend the pre-bid conference and site tour. The bid package for this project, identified as File No. 751/19232.ABG, must be submitted through the SIGMA VSS system, and bidders should contact the SIGMA help desk if they experience any issues with their electronic submission.
The addendum provides clarification on the bid submission process, including prohibiting the submission of online questions through VSS and requiring all questions to be emailed to the designated contact, Jeremy Gagnon, at jgagnon@upea.com. Additionally, the addendum outlines the requirement for bid attachments to be uploaded to SIGMA VSS, as hard copies will not be accepted. The contract is for the Beartrap Stream Crossing and Ionia Creek Crossing Bridge Replacement project in Alger, Michigan, located within Ionia County.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
707 Ashmun Street Sault Ste. Marie, MI 49783
906-635-0511 • 800-867-0511 • Fax: 906-635-0612
Offices also in:
Houghton
Iron Mountain Ishpeming Marinette
U.P. Engineers & Architects, Inc.
www.UPEA.com
[M12-02372]
ADDENDUM NO. 1
TO THE
SNOWMOBILE TRAIL 8/SUNRISE GRADE – BEARTRAP STREAM CROSSING AND
IONIA CREEK CROSSING BRIDGE REPLACEMENT
ALGER, MI
ADDENDUM NO. 1 is issued March 14, 2023, to clarify, modify, and/or change the original plans and specifications issued by UP Engineers and Architects. This ADDENDUM NO. 1 is hereby made part of the Contract Documents for the contract noted below.
File No. 751/19232.ABG Beartrap Stream Crossing and Ionia Creek Crossing Bridge Replacement
Please acknowledge receipt of this ADDENDUM NO. 1 on the appropriate blank on the Bid Form and also include this addendum with the bid package.
GENERAL
1. PROJECT ADVERTISEMENT - A mandatory pre-bid conference will be held at the Natural Resources, Newberry Wildlife Division Office, Cusino/Shingleton Field Office, M-28, PO Box 67, Shingleton, MI 49884 5666 M-123, Newberry, MI 49868 on April 5, 2023, at 11:00 a.m. Local Time. A walk through of the site will occur directly after the pre-bid conference.
SPECIFICATIONS
2. SECTION 00010 – PRE-BID INFORMATION
a. 5. Pre-Bid Conference – A mandatory pre-bid conference will be held at the Natural Resources, Newberry Wildlife Division Office, Cusino/Shingleton Field Office, M-28, PO Box 67, Shingleton, MI 49884 5666 M-123, Newberry, MI 49868 on April 5, 2023, at 11:00 a.m. Local Time. A tour will be held on the same day, starting directly after the meeting. All prospective bidders are required to attend the tour.
END OF ADDENDUM NO. 1
Prepared by:
U.P. Engineers & Architects, Inc
| TO THE |
| END OF ADDENDUM NO. 1 |