Addendum No. 3 -Beartrap Stream Crossing.pdf
PDF 117 KB Posted
- Solicitation number
- RFQ - 171 - 230000000313
- Issued by
- Ionia County, Michigan
About this file
This document is Addendum No. 3 to the Snowmobile Trail 8/Sunrise Grade - Beartrap Stream Crossing and Ionia Creek Crossing Bridge Replacement project in Alger, Michigan. The addendum is issued by UP Engineers & Architects, Inc. on behalf of the Michigan Department of Natural Resources. The project involves the replacement of two bridges along snowmobile trails. The bid opening date has been changed to May 10, 2023, at 2:00 p.m. local time. A mandatory pre-bid conference and site walk-through have been rescheduled to April 25, 2023, at 1:30 p.m. local time, and will be held virtually. All questions are due by May 3, 2023, at 5:00 p.m. local time. Bid attachments must be uploaded to the SIGMA VSS system, and hard copies will not be accepted. Emailed submissions may be accepted in certain cases, but require prior approval from the Office of Design and Construction.
The contract opportunity is identified as File No. 751/19232.ABG and includes the Beartrap Stream Crossing and Ionia Creek Crossing Bridge Replacement project. The project is located in Ionia County, Michigan. Bidders should not submit questions through the VSS system, but rather email them to Jeremy Gagnon at jgagnon@upea.com. Bidders experiencing issues with the SIGMA VSS system should contact the SIGMA Help Desk and notify the Office of Design and Construction.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
707 Ashmun Street Sault Ste. Marie, MI 49783
906-635-0522 • 800-867-0522 • Fax: 906-635-0622
Offices also in:
Houghton
Iron Mountain Ishpeming Marinette
U.P. Engineers & Architects, Inc. www.UPEA.com
[M22-02372]
ADDENDUM NO. 3
TO THE
SNOWMOBILE TRAIL 8/SUNRISE GRADE – BEARTRAP STREAM CROSSING AND
IONIA CREEK CROSSING BRIDGE REPLACEMENT
ALGER, MI
ADDENDUM NO. 3 is issued April 11, 2023, to clarify, modify, and/or change the original plans and specifications issued by UP Engineers and Architects. This ADDENDUM NO. 3 is hereby made part of the Contract Documents for the contract noted below.
File No. 751/19232.ABG Beartrap Stream Crossing and Ionia Creek Crossing Bridge Replacement
Please acknowledge receipt of this ADDENDUM NO. 3 on the appropriate blank on the Bid Form and also include this addendum with the bid package.
SPECIFICATIONS
1. BID SUMMARY – BID OPENING DATE – Change bid opening date to May 10, 2023, at 2:00 p.m. Local Time.
2. PRE-BID CONFERENCE
PROJECT WALK-THRU - A mandatory pre-bid conference has been rescheduled to April 25, 2023, at 1:30 p.m. Local Time and will be held VIRTUALLY at the Dept. of Natural Resources, Wildlife Division Office, Cusino/Shingleton Field Office, M-28, PO Box 67, Shingleton, MI 49884. A walk through of the site will occur directly after the pre-bid conference.
Email sbelleau@upea.com for the Teams Meeting invite.
3. INVITATION TO BID
a. TIME – The bid due date has been changed to May 10, 2023, at 2:00 p.m. Local Time.
4. Questions Due - All questions are due Wednesday, May 3, 2023, at 5:00 p.m. Local Time
END OF ADDENDUM NO. 3
Prepared by:
U.P. Engineers & Architects, Inc mailto:sbelleau@upea.com