This document is an Addendum to the Invitation to Bid (ITB) for the E 40th Ave Storage Tanks Construction project issued by the Eugene Water & Electric Board (EWEB) in Eugene, Oregon. The addendum modifies the original bidding documents by providing revised attachments including the Pre-Bid Attendance Sheet, Bid Form, and Gate Valve Specification Section. It also responds to questions received from bidders regarding project details such as the supply voltage for the electric actuator motor, pumpability of the concrete mix, and coating requirements for the ductile iron piping. The closing date and time for the bid remain unchanged.
The key changes made in this addendum include the addition of a minimum 20 CY pumping test requirement for the Class B concrete mix, revised coating requirements for the ductile iron piping, and the addition of a $25,000 allowance for parking. EWEB also clarified that they will be procuring the pipe, hardware, and gaskets that run through the pipe blocks, with the contractor responsible for unloading the pipe upon delivery.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
March 11, 2022
ADDENDUM #3
E. 40th Ave Storage Tanks – Tank Construction
ITB 22-021-PW
This addendum modifies the bidding document(s) for work only to the extent indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force. This addendum shall be added as a part of the original bidding document and shall become part of the work required.
1. Attachments:
a. Revised Pre-Bid Attendance Sheet
b. Revised Bid Form Section 00400
c. Gate Valve Spec Section 40 05 23.15
2. Responses to Questions Received:
Question 1: What is the supply voltage for the electric actuator motor?
Response: The supply voltage is 240V single phase.
Question 2: We MUST be able to pump the class B mix for floor and roof slabs. This is not an option.
The 1-1/2” crushed rock mix has been proven to not be pumpable, as such we must defer to the ready-mix supplier for constructability. If we cannot get the gradations modified to a smaller crushed rock for Class B we will have a constructability problem on this project that we cannot accurately place a cost on at this time.
Response: Pumpability test requirements will be added via this Addendum 3.
Question 3: Will a 1-1/2” round river rock be acceptable in lieu of crushed rock, and will any admixtures need to be added as a result? If so, we can pump their round rock mix.
Response: Round river rock is not acceptable.
Question 4: Can we substitute the ¾” aggregate Class A mix for the Class B mix per the specifications?
Response: The larger aggregate is specified to reduce cracking potential. Please use the specified aggregate.
Question 5: Specification 33 16 10.10, part 2.1.F.1.b and d specify that encased pipe to be unprimed and uncoated, however drawings M1 and M2 call for exposed DI pipe to be coated including 3” into the concrete. The encased spools that extend above the floor, if Owner provided, need to be primed for field coatings to be applied. Please clarify.
Response: Encased pipe DI pipe should be cement lined and factory prime coated. Factory or field coat piping exposed to potable water. Coating shall extend 6” into the concrete for concrete encased DI pipe.
Question 5: At the pre-bid it was stated that EWEB was procuring the potential long lead time pipe and the concrete encased pipe that goes beneath the reservoir. I am unable to find this “Owner Furnished” clarification in the bid documents. Can we get a confirmation or clarification as to what scope of pipe the Owner is furnishing for the project and who is responsible for unloading the pipe upon delivery?
Response: EWEB will be procuring the pipe, hardware and gaskets that runs through the pipe blocks as shown on M1 and M2. Contractor will be responsible for unloading the pipe upon delivery. See below in the technical addendum items.
Question 6: Specification 33 16 10.10, part 2.1.F.3-overflow piping type and configuration does not agree with the drawings, most notably drawing M5. The specification states HDPE cone, however, drawing M5 shows this cone to be welded stainless steel with a 316SST flanged base connection to the overflow piping. Specification part c.1 call for the overflow pipe to penetrate the tank floor, however, M5 shows the overflow piping through the wall with no penetrations through the floor. Please clarify material type and configuration for the overflow piping, cone, and baffle.
Response: Overflow piping cone shall be stainless steel as called out on M5. The overflow pipe is on the exterior and does not penetrate the floor slab.
Question 7: Detail B/S12 calls out for Sikafelx 2C-SL sealant at the pipe penetrations. A few years ago SIKA stopped paying for the NSF-61 certification testing on this product, and as such it has been removed from the submittal product data. If NSF-61 documentation is required for use of this product in a potable water reservoir than we recommend changing this call-out to SIKA 2C-NS which meets NSF- 61 certification.
Response: Sika 2C-NS is acceptable.
Question 8: Injectable Waterstop specification 036410: The specifications part 3.1.D call for this to be installed at the 9” PVC wall footing-to wall joint waterstop and at the 6” vertical wall pvc waterstop joints which we are in agreement. However, on past projects we have been directed to install this on encasement pipe pvc waterstop joints and on floor slab horizontal pvc waterstop construction joints as well. Since this scope of work is only called out to be provided in the specifications and not currently detailed on the drawings please clarify the full scope of where this will be directed to be installed in the field.
Response: Injectable waterstop is not required along the floor slab horizontal PVC waterstop construction joints.
Question 9: Contractors Parking: Due to the site constraints and tight bidding window and potential needs of times where a crew of 20-30 could be onsite with no room for parking is the Owner willing to add a bid item to the bid form with an allowance to cover potential parking rental areas and even shuttling as required to keep all bidders equal. This would make the risk easier for everyone and the amount not used would be given back to the Owner.
Response: Contractors are encouraged to carpool when feasible, however, EWEB will add a $25,000 allowance for parking. How parking issues are resolved is the responsibility of the contractor.
Question 10: The Site Water Piping plan (sheet C11) and the specs in section 33 11 10, 2.1.B.4.C for DI pipe, call for class 54 pipe. Then spec section 33 11 10 part 2.1.B.4.e says that pressure class 350 can be used instead of class 54. Pressure class 350 is thinner than class 54 and even thinner than EWEB’s standard class 52 ductile pipe. My question is, can we use pressure class 350 in lieu of class 54 or is that an error that was left in the spec by mistake?
Response: DI pipe in Sections 33 11 10, 2.1.B.4. shall be Thickness Class 54 DI pipe.
Question 11: Is the dry hydrant called out on sheet C11 note 4 and 7, just a Fire Hydrant with the valve shut off or is it a different configuration? I didn’t see a detail for it.
Response: The dry hydrant is a Fire Hydrant that is specified in Section 33 12 19.
Question 12: I didn’t see the spec section 40 05 23.15, for gate Valves in Volume 2. Can you tell me where I can find it?
Response: Section 40 05 23.15 is attached to Addendum 3.
Question 13: Plan sheet C11 note 1 calls for all site piping to be minimum class 54 but the spec mentioned above in does not reference the washdown piping. Will the washdown piping need to be something other than class 52?
Response: The washdown piping shall be Class 52 per the specifications.
Question 14: Plan sheets C9 and C10 call out the foundation drains and underdrain leads as class 52 DI the specs mentioned above lists them as class 54. Which will be required class 52 or class 54?
Response: Foundation and underdrains are Class 52.
Question 15: Manhole C1 shown on plan sheet C13 and C15 call out a 6” pipe entering the manhole with a flap valve. I cannot find any 6” pipe in this location. Is this a stub and does the 24” stub out of the manhole need to be ductile or will PVC suffice?
Response: This 6” pipe is the valve vault drain, see M7 Section A.
Question 16: The specifications (40 05 23.70, 2.5) call for flap valves that are M&H or Hydrogate and plan sheet C17 note 1 calls for Waterman PF-25 flap gates. They are a little bit different but serve the same basic function. Will either the flap gates in the spec or on the plans be acceptable?
Response: These valves are considered equals and are both acceptable.
Question 17: Plan sheet M1 Section b has a note pointing to the 20” flanged end that appears to require a check valve (chkv) in the sump. It appears to be a blind flange from the sections and details. Is this something other than a blind flange?
Response: Each mixing system has two membrane check valves, one in the sump and one on the end of the header pipe. These are specified in Section 11 95 00.
Question 18: The mixing manifold pipe supports on detail 2/M4 call out four (4) 2” wide stainless pipe straps per support. Please note the concrete pipe supports are only 12” thick. Typically, we only see two of these straps for a 12” thick concrete support. If we use 4 straps there will not be enough concrete thickness to allow for 3” edge distance for all of the anchors. Please advise.
Response: Provide (2) 2” wide stainless-steel straps at each support for both he inlet/outlet and washdown pipes.
Question 19: We have been asked to look at this project and had a question. On drawing D-38469-M7 shows to provide a Pressure Transducer. It says it’s provided by the System Integrator. Does EWEB have an integrator for this project already? if not there is no spec section for the transducer. Please see below. thank you
Response: All instrumentation and integration will be provided by EWEB.
3. TECHNICAL ADDENDUM ITEMS:
Item Number Page or Drawing Location and Description of Change
1.01 00400 Replace Section 00400 Bid Form with REVISED Section 00400 Attached to Addendum 3.
1.02 03 30 00 Part 2.9: Delete the paragraph that reads: “At the Contractor’s option, Class “A” concrete may be substituted for Class “B” and “C” concrete. Likewise, Class “B” concrete may be used in lieu of Class “C” concrete. If Class “A” concrete is substituted for Class “B” or Class “C” concrete, such concrete shall be air-entrained if the Class “B” or “C” concrete is required to be air-entrained.”
1.03 03 30 30 Add part 3.5.D: “Provide a minimum 20 CY pumping test of the Class B 1 ½” concrete mix to verify the mix is pumpable. Test concrete may be placed for use with tank pipe blocks.”
1.04 05 50 00 Add Part 2.12.F:
F. Vault Access Hatch Fall Protection Grating
1. At locations shown in the Drawings.
2. Unit Responsibility: Door manufacturer shall install the grating system when the door is fabricated or field install (by others) on existing doors already in use. If field installation is necessary, grating system shall be installed per the manufacturer’s instructions.
3. Performance characteristics:
a. Grating panel(s) shall be high visibility safety yellow in color.
b. Grating panel(s) shall lock automatically in the full open position.
4. Grating: Panels shall be aluminum with a powder coat paint finish and designed to meet OSHA OSHA 29 CFR 1926.502(c) requirements for fall protection.
5. Hold open feature: A Type 316 stainless hold open device shall be provided to lock the cover in the fully open 90 degree position.
6. Hardware: All hardware shall be Type 316 stainless steel.
7. Model: RPG by Bilco Company, or equal.
1.05 33 16 10.10 Part 2.1.F.1.b: Replace with “All ductile iron piping shall be cement-lined and factory prime coated pipe with either flanged ends as per AWWA C207-78 or plain ends as required.
1.06 33 16 10.10 Part 2.1.F.3.a: Replace “HDPE cone” with “316 stainless steel cone”
1.07 33 16 10.10 Part 2.1.C.1: Replace “overflow pipe shall penetrate the floor of the tank as ductile iron piping and discharge to a manhole as shown on the drawings” with “overflow pipe shall penetrate the tank as shown on the drawings”
1.08 D-38084-C11 Add to Key Note 9 & 10 on Water Piping Schedule:
“ELEVATION CENTERLINE PIPE PENETRATIONS FOR WQ
SAMPLING LINES TO BE 600.5’. COORDINATE WITH PRE-
STRESSING REQUIREMENTS, SEE SHEET S10.
1.09 D-38084-M1 “Add to Sheet Notes after note 5:
6. 24” DI concrete encased inlet/outlet pipe from the 24” BFV to the 24” DI RFCA, including the 24” FLGxFLG spool, 24” by 20” DI Tee, 20” FLGxFLG DI spool, 24” Elbow, and 24” DI FLGxPE spool to be provided by owner.
7. 18” DI Drain concrete encased pipe from the BFV through the pipe block to the sump. including the 18” FLGxPE spool to be provided by owner.
8. 4” DI concrete encased washdown piping from the MJ x MJ long sleeve through the pipe block to the 4” Gate Valve including, the 4” FLGxPE spool piece, 4” DI 90 deg vert bend, and 4” DI FLGxFLG spool piece to be provided by owner.
9. For owner provided piping and fittings, owner will provide hardware and gaskets. Contractor shall provide offloading of piping and field coating of spools as required.
1.10 D-38083-M1 Sheet Note 2: Replace Sheet Note 2 with “ALL EXPOSED
DUCTILE IRON PIPING IN RESERVOIR SHALL BE CEMENT
LINED AND COATED WITH NSF 61 CERTIFIED SYSTEM
UNLESS OTHERWISE NOTED, SEE SPECIFICATIONS. EXTEND
COATING 6” INTO CONCRETE AT FLOOR PIPING
PENETRATIONS.”
1.11 D-38084-M1 Sheet Note 5: Replace Sheet Note 5 with “REINFORCING
STEEL NOT SHOWN FOR CLARITY, SEE SHEET S11 AND S12.”
1.12 D-38084-M2 Sheet Note 2: Replace Sheet Note 2 with “ALL EXPOSED
DUCTILE IRON PIPING IN RESERVOIR SHALL BE CEMENT
LINED AND COATED WITH NSF 61 CERTIFIED SYSTEM
UNLESS OTHERWISE NOTED, SEE SPECIFICATIONS. EXTEND
COATING 6” INTO CONCRETE AT FLOOR PIPING
PENETRATIONS.”
1.13 D-38084-M2 Sheet Note 5: Replace Sheet Note 5 with “REINFORCING
STEEL NOT SHOWN FOR CLARITY, SEE SHEET S11 AND S12.”
1.14 D-38469-M2 Delete Sheet Note 6.
1.15 D-38469-M5 Detail 2, Note 1: Replace Note 1 with “FOR REINFORCING
AND PRE-STRESSING REQUIREMENTS AT OVERFOW PIPE
PENETRATION, SEE SHEET S10.”
1.16 D-38469-M6 Detail 4: Replace callout that reads 10” CURB with 12”
CURB.
1.17 D-38469-M6 Detail 6: Replace callout that reads 1/4” X 57 1/2” OD X 36” ID RING with 1/4” X 61 1/2” OD X 36” ID RING.
1.17 D-38469-M6 Detail 6: Replace callout that reads 1/4” X 2” X 57” OD RING ALL AROUND with 1/4” X 2” X 61” OD RING ALL AROUND.
1.18 D-38469-M7 Replace “(supplied by System Integrator)” with “(supplied by EWEB)”
CLOSING DATE AND TIME
The closing date and time will remain unchanged.
This addendum constitutes a MATERIAL CHANGE to the bid. ITS RECEIPT BY THE BIDDER IS TO BE ACKNOWLEDGED BY A SIGNATURE AND RETURNING A COPY OF THE ADDENDUM WITH ITS RESPONSE OR
BY CIRCLING THE ADDENDUM NUMBER IN THE APPROPRIATE AREA ON THE BID FORM.
Addendum prepared by:
Wendy Lopez, Contract Specialist
Cc: Laura Farthing
The undersigned hereby acknowledges receipt of this Addendum and agrees to be bound by the conditions therein.
Company Name: ________________________________
Signature: ______________________________________ Date __________________________
End of Addendum
Date: Time:
Marion Construction General Sub‐contractor
Mike Parkin Email: Mikep@marionconst.com
503‐581‐1920
Landis & Landis General Sub‐contractor
Mike Landis Email: mlandis@llconstruction.com
503‐466‐9043
L R Brabham, Inc. General Sub‐contractor
Jordan Brabham Email: jordan@lrbrabham.com
541‐747‐6638
Voluntary Pre‐Bid Meeting Sign In Sheet ITB #22‐021‐PW, E 40th Ave Storage Tanks ‐ Construction
March 2, 2022 10:00 AM Location: EWEB Storage Tank Site Southern end of Patterson St off of E. 40th Ave
Company Name:
Address:
Contact Name:
Phone #: Fax #:
Company Name:
Address:
Contact Name:
Phone #: Fax #:
Company Name:
Address:
Contact Name:
Phone #: Fax #:
Skaar Construction Inc. General Sub‐contractor
Joel Anderson Email: joel@sciconstruction.com
353‐939‐6671 253‐939‐6695
J & K Electrical General Sub‐contractor
Sarah Focht Email: sarahf@jkelectricalllc.com
541‐510‐7451
Ward‐Henshaw General Sub‐contractor
Michael Rubanks Email: mike@ward-henshaw.com
503‐475‐9529
Voluntary Pre‐Bid Meeting Sign In Sheet ITB #22‐021‐PW, E 40th Ave Storage Tanks ‐ Construction
March 2, 2022 10:00 AM Location: EWEB Storage Tank Site Southern end of Patterson St off of E. 40th Ave
Company Name:
Address:
Contact Name:
Phone #: Fax #:
Company Name:
Address:
Contact Name:
Phone #: Fax #:
Company Name:
Address:
DN Tanks General Sub‐contractor nick.belmont@dntanks.com Antonio Hernandez/Nick Belmont Email: anotino.hernandez@dntanks.com
619‐3120‐5581 503‐449‐6006
Rotschy Inc General Sub‐contractor
Scott Surkinen Email: estimator@rotschyinc.com
360‐334‐3100
Emery and Sons Construction Group LLC General Sub‐contractor
Arin Atiyen Email: bids@emeryandsons.com
503‐588‐7576
Voluntary Pre‐Bid Meeting Sign In Sheet ITB #22‐021‐PW, E 40th Ave Storage Tanks ‐ Construction
March 2, 2022 10:00 AM Location: EWEB Storage Tank Site Southern end of Patterson St off of E. 40th Ave
Company Name:
Address:
Contact Name:
Phone #: Fax #:
Company Name:
Address:
Contact Name:
Phone #: Fax #:
Company Name:
Address:
Christenson Electric Inc General Sub‐contractor X
Joel Purvis Email: joel.purvis@christenson.com
541‐908‐1072
JWF Fowler General Sub‐contractor
Dick McGelliot Email: estimating@jwfowler.com
503‐871‐4042
Wildish General Sub‐contractor
Spencer Lemmon Email: estimating@wildish.com
541‐485‐1700
Voluntary Pre‐Bid Meeting Sign In Sheet ITB #22‐021‐PW, E 40th Ave Storage Tanks ‐ Construction
March 2, 2022 10:00 AM Location: EWEB Storage Tank Site Southern end of Patterson St off of E. 40th Ave
Company Name:
Address:
Contact Name:
Phone #: Fax #:
Company Name:
Address:
Contact Name:
Phone #: Fax #:
Company Name:
Address:
Pacific Excavation, Inc General Sub‐contractor
Beau Solesbee Email: Beau@pacificexc.com
541‐726‐7380
Murray Smith, Inc General Sub‐contractor
Michael McKillip Email: Michael.McKillip@murraysmith.us
503‐225‐7010
General Sub‐contractor
Email:
Company Name:
Address:
Address:
Fax #:
Fax #:
Fax #:
Company Name:
Contact Name:
Phone #:
Contact Name:
Phone #:
Company Name:
Address:
Phone #:
Contact Name:
Southern end of Patterson St off of E. 40th Ave
Voluntary Pre‐Bid Meeting Sign In Sheet ITB #22‐021‐PW, E 40th Ave Storage Tanks ‐ Construction
March 2, 2022 EWEB Storage Tank Site10:00 AM Location:
Eugene Water & Electric Board Section 00400
Rev. 8/17 Section 00400
REVISED - BID FORM
PROJECT: E. 40th Ave Storage Tanks – Tank Construction
BID OPENING: March 16, 2022
LOCATION: Eugene Water & Electric Board (EWEB) Roosevelt Operations Center 4200 Roosevelt, Blvd Eugene, OR 97402 Phone: 541-685-7150
THE FOLLOWING INFORMATION MUST BE RETURNED WITH YOUR RESPONSE:
00400 Bid Form 00450 Minimum Qualifications Form 00610 Bid Bond 00430-A First Tier Subcontractor Form Signed addenda (or acknowledged on 00400 Bid Form) Electronic copy (Flash drive acceptable)
A. EXCEPTIONS: Bidders, please note that any exceptions or stipulations to any of the requirements of this solicitation must be submitted in accordance with Section 00200, 1.1(h), Protest or Request for Changes of Specifications and/or Bidding Requirements. Exceptions that are not submitted in compliance with Section 00200, 1.1(h), may cause your bid to be ruled non-responsive.
B. ACKNOWLEDGMENT OF RECEIPT OF ADDENDA TO BID DOCUMENTS:
Bidder acknowledges receipt of Addenda and agrees to be bound by their contents.
Circle each BID addendum posted: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, None Posted
C. CCB/LCB REGISTRATION NUMBER - EWEB Rule 5-0230 Eligibility to Bid or Propose;
Registration or License
Construction Contracts. EWEB shall not consider a Person's Offer to do Work as a contractor, as defined in ORS 701.005(2), unless the Person has a current, valid certificate of registration issued by the Construction Contractors Board at the time the Offer is made.
Non-complying Entities. EWEB shall deem an Offer non-responsive if it is received from a
Person that fails to comply with this rule and shall reject the Offer as stated in ORS 279C.365(1)(k), unless contrary to federal law or subject to different timing requirements set by federal funding agencies.
Bidder is in compliance with the requirements of and is registered and bonded with the State of Oregon Construction Contractor's Board or Landscape Contractors Board as follows:
Registration classification:
Registration No.: Expiration Date:
D. RESPONSIBILITY:
Prior to awarding a Public Improvement Contract, EWEB shall determine whether the lowest Responsible bidder meets the standards of Responsibility, as defined in ORS 279C.375.
E. BIDDER RESIDENCY INFORMATION:
ORS 279A.120 states, "For the purposes of awarding a public contract, a contracting agency shall":
o Give preference to goods or services that have been manufactured or produced in this state if price, fitness, availability and quality are otherwise equal; and o Add a percent increase to the bid of a non-resident bidder equal to the percent, if any, of the preference given to the bidder in the state in which the bidder resides.
“Resident bidder” means a bidder that has paid unemployment taxes or income taxes in the state of Oregon during the 12 calendar months immediately preceding submission of the bid, has a business address in this state, and has stated in the bid whether the bidder is a “resident bidder” under this paragraph.
“Non-resident Bidder” means a Bidder who is not a “resident Bidder” as defined above
1. CHECK ONE: Bidder is a ( ) RESIDENT Bidder ( ) NON-RESIDENT Bidder.
2. If resident bidder, enter your Oregon business address: (physical and mailing address)
3. If a non-resident bidder, enter state of residency:
4. If a non-resident bidder, do you or your company receive, or are you or your company eligible for any preference in award of contracts with your state’s government or with other governmental bodies in your state?
CHECK ONE: ( ) YES ( ) NO
If YES, state the preference percentage: _________________%
If YES, but not a percentage of bid price, describe the preference:
If YES, state the law or regulation that allows the preference described (legal citation):
F. ASSURANCES:
1. The Bidder hereby offers to furnish all labor, equipment, materials, and to perform all work, as bid, in strict accordance with all requirements of the above-named project.
2. The Bidder certifies that Bidder has read, understands, and will comply with the drug testing requirements set forth in Section 00430-B.
3. Bidder acknowledges and agrees that, if this contract is for a Public Work subject to ORS
279C.800 to 279C.870, Bidder will comply with ORS 279C.840, as applicable.
4. Bidder certifies that all statements in the bid are true.
5. Bidder understands that this offer shall be subject to acceptance for ninety (90) calendar days from date of opening; thereafter it may be withdrawn.
G. NON-COLLUSION: ORS 279A.010 and 279A.990 By signing and submitting a bid, bidder certifies that:
1. Bidder has arrived at the specifics of the bid, including price and amounts, independently and without communication or agreement with another bidder, except as disclosed in a separately attached statement;
2. The bidder is not submitting the bid in the interest of or on behalf of any undisclosed person;
3. The bidder has not directly or indirectly induced or solicited another bidder, in order to benefit a third person, to submit a false or sham bid, to refrain from bidding or to change a bid;
4. The bidder has not directly or indirectly disclosed the bidder's bid price, a breakdown of the price, the contents of the price or information or data related to the price to another bidder;
5. The bidder has not sought through communication or agreement with a person to fix the bid price of the bidder or another bidder, to fix an overhead, profit or cost element of the bid price of the bidder or another bidder or to secure any advantage against the contracting agency or any other person interested in the public contract;
6. The bidder has not directly or indirectly expressed an interest or lack of interest in the public contract, or paid or offered to pay a fee to a person, to cause a collusive or sham bid;
7. The bid is genuine and not collusive or a sham.
H. ACKNOWLEDGMENTS:
1. The Bidder acknowledges that the Contract consists of the following documents: Bid
Form, Drug Testing Program Requirements, Minimum Qualifications, First Tier Sub- Contractor Form, Performance Bond, Payment Bond, Certificate for Payment, Accounts Affidavit, Certificate of Completion, EWEB General Provisions and Supplements, Prevailing Wage Requirements, Change Order Form, Specifications, Drawings, Attachments.
2. The Bidder declares that he/she has carefully examined the terms of this Contract and has personally inspected and is satisfied with conditions at the Project site.
3. The Bidder hereby states that they shall abide by the provisions of ORS 279C.830(1) relating to Prevailing Wages Rates.
4. A bid bond and performance and payment bond are required. The bidder encloses with this bid acceptable security in the amount of ten percent (10%) of the total amount of the bid, made payable to the Owner. The bid security shall be forfeited as liquidated damages if bid is accepted by Owner and bidder fails to execute the Contract, provide the performance and payment bonds in the amount of 100% of the total amount of the bid, and provide the required evidence of insurance, as described below (Section 00700), within the time allowed.
5. Bidder further agrees:
a. To start work within ten (10) calendar days after receipt from the Owner of Notice to Proceed; to prosecute the work with diligence to its completion as follows:
Substantial Completion – October 31, 2023 Final Completion – November 30, 2023
b. To pay to the Owner as liquidated damages the amount of $750 per calendar day for each calendar day by which actual completion time exceeds the contract completion time set forth above.
c. To accept as full payment for the Lump Sum and Unit Price Work, the amounts computed in the Bid Schedule below. For Unit Price Work, Bidder agrees that the unit price represents a true measure of the labor, materials, and services required to furnish and install the item, including all allowances for overhead and profit.
Item No. Description Unit Quantity Unit Price Extended
Price
1 Mobilization, Bonds, Insurance and Demobilization LS 1
All work required to construct two 7.5 MG prestressed concrete tanks
2a Shop drawings and approvals LS 1
2b Construction survey and staking LS 1
2c Dewatering LS 1
2d Site preparation including minor preliminary site grading, backfill and finish grading LS 1
2e Tank construction (2 EA 7.5 MG) including foundation, structure, mixing system, interior stairs, hatches and appurtenances.
LS 1
2f Tank testing, disinfection, and start-up LS 1
2g Valve vault LS 1
2h Water piping including pipe, valves, fittings, restraints and flexible expansion joints. LS 1
2i Testing, flushing and disinfection of water mains LS 1
2j Site stormwater facilities, complete LS 1
2k Tank overflow & drain facilities start-up and testing LS 1
2l Tank monitoring manhole LS 1
2m Water quality monitoring facilities including enclosures, piping and valves LS 1
2n Site access road, parking area and tank access roads with surfacing, drainage ditches and features noted and as shown in the Drawings
LS 1
2o Electrical, instrumentation & control, and telemetry improvements LS 1
2p Maintain owner-provided temporary site fencing LS 1
2q Final site grading, surface restoration and site clean-up LS 1
2r Site access gate and bollards LS 1
2s Traffic Control LS 1
2t As-built drawing preparation and post-construction survey LS 1
3 Tank leak detection system (30 mil PVC liner) LS 1
4 Rock excavation CY 350
5 Additional cost for overexcavation and select backfill material for unsuitable conditions CY 100
6 Temporary water and sediment control, complete LS 1
7 Parking Allowance LS 1 $25,000
TOTAL EXTENDED PRICE
6. EWEB is an Equal Employment Opportunity and Affirmative Action employer, and requires Contractors and their subcontractors to follow EEO/AA practices in their performance of this contract.
7. EWEB encourages contracting with minority owned, woman owned, and emerging small businesses (MWESB). The State of Oregon offers a certification process. Indicate below if your business is a MWESB and if so, which categories have been state certified.
MWESB Certified? No _____ Yes _____ If yes, circle categories below:
Minority Owned ___ Woman Owned ___ Emerging Small Business ___ Veteran Owned _____
The Contractor represents and warrants to the Owner that Contractor has the power and authority to enter into and perform this Contract, and that this Contract, when executed and delivered, shall be a valid and binding obligation of Contractor, enforceable in accordance with its terms. Contractor further warrants that the work of this Contract shall be performed in good and workmanlike manner, and that Contractor shall, at all times, be qualified, competent and current with any necessary licenses to perform work set forth in this Contract.
EUGENE WATER & ELECTRIC BOARD CONTRACTOR
Contract Administrator – Laura Farthing Company Name
Supervisor– Chris Irvin Signed
Manager – Wallace McCullough Name (Print or Type)
Chief Operations Officer – Karen Kelley Address
Approved Purchasing Supervisor – Quentin Furrow Date
Date Telephone:
Email:
Tax ID No.
End of Section 00400
EWEB E 40th Ave 7.5 MG Tanks 20-2888
Gate Valves 40 05 23.15- 1
SECTION 40 05 23.15 - GATE VALVES
PART 1 GENERAL
1.1 SUMMARY
A. This Section includes gate valves for use in buried service, vaults, and building plant piping. Coordinate with Section 33 12 16, Water Utility Distribution Valves and Section 40 05 23, Stainless Steel Process Pipe and Tubing.
B. Section Includes:
1. Resilient-seated gate valves, 4” and larger.
1.2 RELATED SECTIONS
A. Section 33 12 16, Water Utility Distribution Valves B. Section 33 11 10, Water Utility Distribution and Transmission Piping C. Section 40 05 13, Common Work Results for Process Piping D. Section 40 05 51, Common Requirements Results for Process Valves.
1.3 REFERENCE STANDARDS
A. American Society of Mechanical Engineers (ASME):
1. ASME B16.1 - Gray Iron Pipe Flanges and Flanged Fittings.
2. ASME B16.5 - Pipe Flanges and Flanged Fittings: NPS 1/2 through 24 - Metric/Inch
Standard.
3. ASME B16.42 - Ductile Iron Pipe Flanges and Flanged Fittings: Classes 150 and 300.
4. ASME B1.20.1 - Pipe Threads, General Purpose (Inch).
B. ASTM International (ASTM):
1. ASTM A126 - Standard Specification for Gray Iron Castings for Valves, Flanges, and Pipe Fittings.
2. ASTM B62 - Standard Specification for Composition Bronze or Ounce Metal
Castings.
3. ASTM B584 - Standard Specification for Copper Alloy Sand Castings for General Applications.
C. American Water Works Association (AWWA):
EWEB E 40th Ave 7.5 MG Tanks Gate Valves 20-2888 40 05 23.15- 2
1. AWWA C509 - Resilient-Seated Gate Valves for Water Supply Service.
2. AWWA C550 - Protecting Interior Coatings for Valves and Hydrants.
D. Manufacturers Standardization Society of the Valve and Fittings Industry (MSS):
1. MSS SP-70 - Gray Iron Gate Valves, Flanged and Threaded Ends.
2. MSS SP-80 - Bronze Gate, Globe, Angle and Check Valves.
E. NSF International (NSF):
1. NSF/ANSI Standard 61 - Drinking Water System Components - Health Effects
2. NSF/ANSI Standard 372 - Drinking Water System Components - Lead Content
1.4 SUBMITTALS
A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.
B. As required by Section 33 12 16 - Water Utility Distribution Valves and/or Section 40 05 51, Common Requirements Results for Process Valves.
PART 2 PRODUCTS
2.1 GENERAL
A. All materials in contact with potable water shall conform to ANSI/NSF Standard 61 and meet the “lead free” requirements of the Safe Drinking Water Act amendment, effective January 4, 2014, as per the lead content evaluation procedures outlined in NSF/ANSI Standard 372.1.
1. All fittings shall either be cast or permanently stamped with markings identifying the item as complying with NSF 61 per the requirements of NSF 372 for “lead free”.
2. All brass in contact with potable water shall comply with ASTM B584.
2.2 RESILIENT-SEATED GATE VALVES
A. Description:
1. Comply with AWWA C509.
2. Minimum Pressure Rating:
a. Twelve-inch Diameter and Smaller: 200 pounds per square inch (gauge) (psig).
b. Sixteen-inch Diameter and Larger: 150 psig.
3. End Connections: As shown in the Drawings.
20-2888 40 05 23.15- 3
a. Standard mechanical joint ends comply with ANSI/AWWA C111.
b. Flanged end dimensions and drilling comply with ANSI/ASME B16.1, class 125.
Comply with AWWA C115 & ASME 16.5.
1) The Contractor shall coordinate with pipe, valve, and fitting suppliers to make certain pipe, valve, and fitting flanges match in bolt pattern.
4. Gear Actuators: Conforming to AWWA C509 for manual valves.
5. Linings and Coatings:
a. Corrosion-resistant fusion bonded epoxy conforming to AWWA C550 and NSF 61.
b. All internal and external ferrous surfaces.
c. Do not coat flange faces of valves.
6. Bi-directional flow.
B. Operation:
1. Non-rising stem.
2. Open counterclockwise when viewing the valve from above, unless otherwise indicated in the Drawings.
3. Buried Valves: All buried valves shall be provided with 2-inch square operating nuts.
4. In-Plant Service Valves: Valves for in-plant or exposed service shall be furnished with handwheel operators, unless otherwise specified in Section 40 05 51, Common Requirements Results for Process Valves.
C. Materials:
1. Wedge:
a. ASTM A126, cast iron or ASTM A536, ductile iron.
b. Fully encapsulated with molded rubber.
2. Body and Bonnet:
a. ASTM A126, cast iron or ASTM A536, ductile iron.
3. Stem, Stem Nuts, Glands, and Bushings: ASTM B584, bronze.
20-2888 40 05 23.15- 4
4. Valve Body Bolting: Stainless steel.
D. Manufacturers:
1. Clow Valve Company.
2. M&H Valve.
3. U.S. Pipe.
4. American Flow Control.
5. Mueller Company.
2.3 SOURCE QUALITY CONTROL
A. Testing: Test gate valves according to AWWA C509.
PART 3 EXECUTION
3.1 INSTALLATION
A. As required by Section 33 12 16, Water Utility Distribution Valves and/or Section 40 05 51 - Common Requirements Results for Process Valves.
B. Install according to manufacturer's instructions.
C. Support valves in plastic piping to prevent undue stresses on piping.
END OF SECTION