This document is an Addendum to a Request for Proposals (RFP) issued by the Florida Department of Environmental Protection for Petroleum Contamination Site Response Action Services. The RFP has been amended multiple times, with Addendum No. 8 being the latest. The amendments include revisions to the RFP document and the Price Sheet (Form D). Respondents are required to use the amended versions provided by the Department when preparing their responses. This is a statewide contract opportunity, with services to be performed in various jurisdictions across Florida, including Leon County and Tampa City.

The contract will provide for a range of petroleum contamination site response action services, including field activities, soil source removal, well installation and abandonment, sampling and analysis, remediation system operation and maintenance, and reporting. Pricing is structured through a comprehensive pay item list with associated documentation requirements. The contract term is not specified, but the RFP indicates the potential for renewal options. Funding sources and amounts are not directly addressed in the document, but the "Contingent Funding" pay item suggests the availability of additional funding as needed.

View the file

Other files

File Type Posted
6. Addendum No. 1 - Form D - Price Sheet.xlsx XLSX spreadsheet
Addendum No. 2 - Revised Form D.xlsx XLSX spreadsheet
Addendum No. 7 - Revised RFP 2024001.pdf PDF
Attachment 1 - Draft Contract for RFP 2024001.pdf PDF
Attachment 4 - Required Documentation.xlsx XLSX spreadsheet
1. Addendum No. 1 - Q&A & Modifications.pdf PDF
2. Addendum No. 1 - Revised RFP 2024001.pdf PDF
Addendum No. 2 - Revised RFP 2024001_08.16.23.pdf PDF
Addendum No. 4 - Revised Form D.xlsx XLSX spreadsheet
Addendum No. 5 - Revised Form D.xlsx XLSX spreadsheet
Addendum No. 5 - Revised RFP 2024001.pdf PDF
3. Addendum No. 1 - SOW Apdx.pdf PDF
7. Addendum No. 1 - Contract T&Cs.pdf PDF
Addendum No. 6 - Revised Form D.xlsx XLSX spreadsheet
Addendum No. 8 - Revised RFP 2024001.pdf PDF
Form D - Price Sheet for RFP 2024001.xlsx XLSX spreadsheet
RFP 2024001.pdf PDF
Addendum No. 3 - Revised RFP 2024001.pdf PDF
4. Addendum No. 1 - Rqr'd Doc for Inv.xlsx XLSX spreadsheet
5. Addendum No. 1 - Subcntr Req Form.xlsx XLSX spreadsheet
Addendum No. 5 - Revised Attachment 4.xlsx XLSX spreadsheet
Addendum No. 5 - Revised Attachment 5.xlsx XLSX spreadsheet
Addendum No. 6 - Revised RFP 2024001.docx DOCX document
Addendum No. 8 - Revised Form D.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Required Document Tab Addendum No. 2 - Revised

State of Florida Department of Environmental Protection Required Documentation for Invoicing

Attachment 4

PAY ITEMPAY ITEM DESCRIPTIONREQUIRED DOCUMENTATION FOR INVOICING
1.OFFICE ACTIVITIES
1-1.File ReviewHistorical Summary Worksheet
1-2.Site Health & Safety PlanComplete HASP
1-2.a.Site Health & Safety Plan for Continued Work (no cost to FDEP)Complete HASP
1-3.Notice of Discovery of Contamination Package (Initial or TPOC)Complete noticing package
1-4.Permit Fees (actual fee only, cost to obtain permit is included in applicable pay items)Copy of permit and receipt
1-5.Off-Site Property Access AgreementCopy of executed access agreement or documentation of due diligence for partial payment.
1-5.a.Site Property Access Agreement for Source Property (no cost to FDEP)Copy of executed access agreement
1-6.Project Specific Financial Guarantee Bond (if required by FDEP)Documentation of paid bond
1-7.6% Handling Fee for Cost Reimbursable ItemsApproval for payment of Reimbursable Items
1-8Map and Table GenerationsComplete maps and tables in the Petroleuem Restoration Program required format available on the Petroelum Restoration Program webpage.
2.FIELD ACTIVITIES - GENERAL
2-1.Site Reconnaissance/Field Measurement VisitArea survey table, location map, area map, site map, photo documentation and field notes
2-2.Receptor Survey and Exposure Pathway Identification (excludes report)Receptor Survey Worksheet, DOH map and well data
2-3.Professional Land Survey subject to FDEP authorization to perform and the SPI displaying the cost not to exceed as supported by quote(s) prior to performanceSurveyor invoice and electronic and hard copy of PLS
2-4.Contractor Oversight for Non-Price Schedule ActivitiesField Notes
2-5.Maintenance of TrafficMOT Plan and Invoice
3.MOBILIZATION
3-1.Mobilization, Light Duty Vehicle (car or 1/2 ton truck) each wayField notes - documenting vehicle type
3-2.Heavy Duty/Stakebed Truck (3/4 ton +) each wayField notes - documenting vehicle type
3-3.Work Trailer miles each wayField notes - documenting vehicle type
3-4.DPT Rig and Support Vehicles Mobilization each wayField notes - documenting vehicle type
3-5.Drill Rig and Support Vehicles Mobilization (hollow stem auger, mud rotary or sonic) each wayField notes - documenting vehicle type
3-6.Excavator Mobilization miles each wayField notes - documenting vehicle type
3-7.LDA Rig and Support Vehicles Mobilization each wayField notes - documenting vehicle type
3-8.Loader/Backhoe Mobilization each wayField notes - documenting vehicle type
3-9.Mini Excavator/Loader (BobcatTM) Mobilization each wayField notes - documenting vehicle type
3-10.Drum Compactor mobilization each wayField notes - documenting vehicle type
4.DRILLING AND BORING
4-1.a.Split Spoon Sampling – 2 foot (during boring) < 50 feetField notes and boring logs
4-1.b.Split Spoon Sampling – 2 foot (during boring) 50 to 100 feetField notes and boring logs
4-1.c.Split Spoon Sampling – 2 foot (during boring) > 100 feetField notes and boring logs
4-1.d.Sonic Core Sampling - 5 or 10 foot (during boring)Field notes and boring logs
4-2.Hand Auger Boring ≤ 10 foot total depthField notes and boring logs
4-3.Direct Push Technology (DPT) Rig and EquipmentField notes and boring logs
4-4.DPT Membrane Interface Probe (MIP) Equipped with PID and ECD (add-on cost to DPT base rate)Field notes and boring logs
4-5.HSA or MR Boring, ≤ 6 inch diameter, < 50 foot total depthField notes and boring logs
4-6.HSA or MR Boring, ≤ 6 inch diameter, 50 to 100 foot total depthField notes and boring logs
4-7.HSA or MR Boring, ≤ 6 inch diameter, > 100 foot total depthField notes and boring logs
4-8.HSA or MR Boring, > 6 to 10 inch diameter, < 50 foot total depthField notes and boring logs
4-9.HSA or MR Boring, > 6 to 10 inch diameter, 50 to 100 foot total depthField notes and boring logs
4-10.HSA or MR Boring, > 6 to 10 inch diameter, > 100 foot total depthField notes and boring logs
4-11.HSA or MR Boring, > 10 to 14 inch diameter, < 50 foot total depthField notes and boring logs
4-12.HSA or MR Boring, > 10 to 14 inch diameter, 50 to 100 foot total depthField notes and boring logs
4-13.HSA or MR Boring, > 10 to 14 inch diameter, > 100 foot total depthField notes and boring logs
4-14.Sonic Boring, ≤ 6 inch diameter, < 50 foot total depthField notes and boring logs
4-15.Sonic Boring, ≤ 6 inch diameter, 50 to 100 foot total depthField notes and boring logs
4-16.Sonic Boring, ≤ 6 inch diameter, > 100 foot total depthField notes and boring logs
4-17.Sonic Boring, > 6 to 10 inch diameter, < 50 foot total depthField notes and boring logs
4-18.Sonic Boring, > 6 to 10 inch diameter, 50 to 100 foot total depthField notes and boring logs
4-19.Sonic Boring, > 6 to 10 inch diameter, > 100 foot total depthField notes and boring logs
4-20.Sonic Boring, > 10 to 14 inch diameter, < 50 foot total depthField notes and boring logs
4-21.Sonic Boring, > 10 to 14 inch diameter, 50 to 100 foot total depthField notes and boring logs
4-22.Sonic Boring, > 10 to 14 inch diameter, > 100 foot total depthField notes and boring logs
5.WELL INSTALLATION
5-1.Well Installation - 1 inch diameterField notes, well construction and development logs, well permits and photo documentation
5-2.a.Well Installation - 2 inch diameter (vertical)Field notes, well construction and development logs, well permits and photo documentation
5-2.b.Well Installation - 2 inch diameter (horizontal, by trenching, not directional drilling)Field notes, well construction and development logs, well permits and photo documentation
5-3.a.Well Installation - 4 inch diameter (vertical)Field notes, well construction and development logs, well permits and photo documentation
5-3.b.Well Installation - 4 inch diameter (horizontal, by trenching, not directional drilling)Field notes, well construction and development logs, well permits and photo documentation
5-4.Well Installation - 1.5 inch diameter (vertical)Field notes, well construction and development logs, well permits and photo documentation
5-5.Well Installation - 6 inch diameterField notes, well construction and development logs, well permits and photo documentation
5-6.Surface Casing - 6 inch diameterField notes
5-7.Surface Casing - 8 inch diameterField notes
5-8.Surface Casing - 10 inch diameterField notes
5-9.Surface Casing - 12 inch diameterField notes
5-10.a.Additional Well Screen > 20 feet - 1 inch diameterField notes
5-10.b.Additional Well Screen > 20 feet - 2 inch diameterField notes
5-10.c.Additional Well Screen > 20 feet - 4 inch diameterField notes
5-10.d.Additional Well Screen > 20 feet - 6 inch diameterField notes
5-11.Above Grade Well CompletionField notes and photo documentation
5-12.Installation of Well Vault - 2 x 2 x 2 footField notes and photo documentation
5-13.Installation of Well Vault - 4 x 4 x 2 footField notes and photo documentation
5-14.Well RedevelopmentField notes and photo documentation
5-15.Removal and Reinstallation of 8-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)Field notes and photo documentation
5-16.Removal and Reinstallation of 12-inch Manhole and Well Pad (well pad/manhole has been damaged or destroyed)Field notes and photo documentation
5-17.Well Compleletion - Packed Screens:Field notes and photo documentation
6.WELL ABANDONMENT
6-1.Grout and Abandon Well, 1 to 2 inch diameterField notes, well completion report/permit and photo documentation
6-2.Grout and Abandon Well, > 2 to 4 inch diameterField notes, well completion report/permit and photo documentation
6-3.Grout and Abandon Well, > 4 to 6 inch diameterField notes, well completion report/permit and photo documentation
6-4.Grout and Abandon Well, > 6 inch diameterField notes, well completion report/permit and photo documentation
6-5.Removal of Well Vault - 2 x 2 x 2 footField notes and photo documentation
6-6.Removal of Well Vault - 4 x 4 x 2 footField notes and photo documentation
6-7.Removal of Well Pad and ManholeField notes and photo documentation
7.SAMPLE COLLECTION AND FIELD TESTING
7-1.Monitoring Well Sampling with Water Level, ≤ 100 foot depthField notes, well sampling and calibration logs and sample chain of custody form
7-2.Monitoring Well Sampling with Water Level, > 100 foot depthField notes, well sampling and calibration logs and sample chain of custody form
7-3.Domestic Water Well SamplingField notes, well sampling and calibration logs and sample chain of custody form
7-4.Other Water SamplingField notes, well sampling and calibration logs and sample chain of custody form
7-5.Free Product Sample CollectionField notes and sample chain of custody form
7-6.Soil/Sediment Sample CollectionField notes, well sampling and calibration logs and sample chain of custody form
7-7.Water Level or Free Product GaugingField notes and updated tables
7-8.Free Product Gauging & BailingField notes and updated tables
7-9.Vapor/Ambient Air Sample Collection - Passive Dosimeter, Sorbent Tube, TedlarTM Bag (or Equivalent)Field notes and sample chain of custody form
7-10.Vapor/Ambient Air Sample Collection - SUMMATM Canister (or equivalent)Field notes and sample chain of custody form
7-11.Electronic Data Deliverables (EDD)ADaPT zip file including the Lab EDD, Error Log, Field EDD, and Merged database file
7-12.Survey Latitude/Longitude of Existing Monitor WellsField notes and updated tables (electronic file format)
7-13.Survey Latitude/Longitude of New Monitor WellsField notes and updated tables (electronic file format)
7-14.Encore (25 gram) for SPLP Soil Sample Collection: [Per Encore]. The cost will include the 25 gram Encore samples submitted to the laboratory for SPLP testing and the 25 gram Encore samples collected in the field but not submitted to the laboratory for testing (discarded).Field notes and sample chain of custody form
8.LABORATORY ANALYSIS
8.A.SOIL/SEDIMENT ANALYSIS
8-1.Soil, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods)Lab Report, ADaPT upload and updated tables
8-2.Soil, BTEX + MTBE (EPA 8021 or EPA 8260)Lab Report, ADaPT upload and updated tables
8-3.Soil, Volatile Organic Halocarbons (EPA 8021 or EPA 8260)Lab Report, ADaPT upload and updated tables
8-4.Soil, BTEX + MTBE + VOHs (EPA 8021 or EPA 8260)Lab Report, ADaPT upload and updated tables
8-5.Soil, Polycyclic Aromatic Hydrocarbons (EPA 8270 or EPA 8310)Lab Report, ADaPT upload and updated tables
8-6.Soil, Priority Pollutant Volatile Organics (EPA 8260)Lab Report, ADaPT upload and updated tables
8-7.Soil, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270])Lab Report, ADaPT upload and updated tables
8-8.Soil, Total Recoverable Petroleum Hydrocarbons (FL-PRO)Lab Report, ADaPT upload and updated tables
8-8.a.Soil, TRPH Fractionation (MADEP-EPH/VPH Method or TPHCWG Direct Method)Lab Report, ADaPT upload and updated tables
8-9.Soil, PCBs [or Aroclors] (EPA 8082)Lab Report, ADaPT upload and updated tables
8-10.Soil, 8 RCRA Metals (EPA 6010 or EPA 6020 [Arsenic, Barium, Cadmium, Chromium, Lead, Selenium, Silver] and EPA 6020 or EPA 7471 [Mercury])Lab Report, ADaPT upload and updated tables
8-11.Soil, Arsenic (EPA 6010 or EPA 6020)Lab Report, ADaPT upload and updated tables
8-12.Soil, Cadmium (EPA 6010 or EPA 6020)Lab Report, ADaPT upload and updated tables
8-13.Soil, Chromium (EPA 6010 or EPA 6020)Lab Report, ADaPT upload and updated tables
8-14.Soil, Lead (EPA 6010 or EPA 6020)Lab Report, ADaPT upload and updated tables
8-15.Soil, Toxicity Characteristic Leaching Procedure-Extraction Only (EPA 1311)Lab Report, ADaPT upload and updated tables
8-16.Soil, Synthetic Precipitation Leaching Procedure-Extraction Only (EPA1312)Lab Report, ADaPT upload and updated tables
8-17.Soil, Organic Carbon, Total (EPA 9060 or Walkey-Black)Lab Report, ADaPT upload and updated tables
8-18.Soil, Dry Bulk Density (ASTM D1556-07, ASTM D2167-08, ASTM D2922-01, -04, -04e, -96e1 or ASTM D2937-10)Lab Report, ADaPT upload and updated tables
8-19.Soil, Moisture Content (ASTM D2216-10)Lab Report, ADaPT upload and updated tables
8-20.Soil, Texture, (See Gee 7 Bauder [1966])Lab Report, ADaPT upload and updated tables
8-21.Soil, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS)Lab Report, ADaPT upload and updated tables
8-22.Soil, Gasoline Hydrocarbon Composition, Gasoline PIANO (paraffins, isoparaffins, aromatics, naphthenes and olefins) (EPA 8260Mod, High Resolution GC/MS)Lab Report, ADaPT upload and updated tables
8-23.Soil, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS)Lab Report, ADaPT upload and updated tables
8-24.Soil, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)Lab Report, ADaPT upload and updated tables
8-25. 8-21.Soil, Cumene (Isopropyl benzene), Trimethylbenzene, 1,2,3-, Trimethylbenzene, 1,2,4- and Trimethylbenzene, 1,3,5- (EPA 8260)Lab Report, ADaPT upload and updated tables
8.B.WATER ANALYSIS
8-26. 8-22.Water, Gasoline/Kerosene Analytical Group-Table C of Ch. 62-780, F.A.C. (multiple methods)Lab Report, ADaPT upload and updated tables
8-27. 8-23.Water, Used Oil/Unknown Product Group-Table D of Ch. 62-780, F.A.C., except for non-Priority Pollutant Organics (multiple methods)Lab Report, ADaPT upload and updated tables
8-28. 8-24.Water, BTEX + MTBE (EPA 602, EPA 624, EPA 8021 or EPA 8260)Lab Report, ADaPT upload and updated tables
8-29. 8-25.Water, Volatile Organic Halocarbons, except EDB (EPA 8021 or EPA 8260)Lab Report, ADaPT upload and updated tables
8-30. 8-26.Water, BTEX + MTBE + VOHs (EPA 601/602, EPA 624, EPA 6021 or EPA 8260)Lab Report, ADaPT upload and updated tables
8-31. 8-27.Water, Polycyclic Aromatic Hydrocarbons, including 1-methylnaphthalene + 2-methylnaphthalene (EPA 610 [HPLC], EPA 625, EPA 8270 or EPA 8310)Lab Report, ADaPT upload and updated tables
8-31.a 8-28.Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 504.1 or EPA 8011)Lab Report, ADaPT upload and updated tables
8-32. 8-29.Water, EDB [1,2-dibromoethane or ethylene dibromide] (EPA 8260 SIM)Lab Report, ADaPT upload and updated tables
8-33. 8-30.Water, Priority Pollutant Volatile Organics [for NPDES purposes only] (EPA 624)Lab Report, ADaPT upload and updated tables
8-34. 8-31.Water, Priority Pollutant Volatile Organics (EPA 8260)Lab Report, ADaPT upload and updated tables
8-35. 8-32.Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables [for NPDES purposes only] (EPA 625 list [e.g., EPA 608 + EPA 625])Lab Report, ADaPT upload and updated tables
8-36. 8-33.Water, Priority Pollutant Extractable Organics-Base Neutral and Acid Extractables (EPA 8270 list [e.g., EPA 8081/8082 + EPA 8270 or EPA 608 + EPA 8270)Lab Report, ADaPT upload and updated tables
8-37. 8-34.Water, Total Recoverable Petroleum Hydrocarbons (FL-PRO)Lab Report, ADaPT upload and updated tables
8-38. 8-35.Water, PCBs [or Aroclors] (EPA 608 or EPA 8082)Lab Report, ADaPT upload and updated tables
8-39. 8-36.Water, Arsenic, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)Lab Report, ADaPT upload and updated tables
8-40. 8-37.Water, Cadmium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)Lab Report, ADaPT upload and updated tables
8-41. 8-38.Water, Chromium, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)Lab Report, ADaPT upload and updated tables
8-41.a. 8-39.Water, Lead, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)Lab Report, ADaPT upload and updated tables
8-42. 8-40.Water, Dissolved Lead (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)Lab Report, ADaPT upload and updated tables
8-43. 8-41.Water, Mercury, Total (EPA 245.1, EPA 6020 or EPA 7470)Lab Report, ADaPT upload and updated tables
8-44. 8-42.Water, Calcium, Total (EPA 200.7, EPA 6010 or EPA 6020)Lab Report, ADaPT upload and updated tables
8-44.a. 8-43.Water, Iron, Total (EPA 200.7, EPA 6010 or EPA 6020)Lab Report, ADaPT upload and updated tables
8-45. 8-44.Water, Dissolved Iron (includes filter appropriate to sample method - EPA 200.7, 200.9, 6010B, or 7380)Lab Report, ADaPT upload and updated tables
8-46. 8-45.Water, Magnesium, Total (EPA 200.7, EPA 6010 or EPA 6020)Lab Report, ADaPT upload and updated tables
8-47. 8-46.Water, Manganese, Total (EPA 200.7, EPA 200.8, EPA 6010 or EPA 6020)Lab Report, ADaPT upload and updated tables
8-48. 8-47.Water, Potassium, Total (EPA 200.7, EPA 6010 or EPA 6020)Lab Report, ADaPT upload and updated tables
8-49. 8-48.Water, Sodium, Total (EPA 200.7, EPA 6010 or EPA 6020)Lab Report, ADaPT upload and updated tables
8-50. 8-49.Water, Alkalinity [as CaCO3] (EPA 310.2 or SM 2320 B)Lab Report, ADaPT upload and updated tables
8-51. 8-50.Water, Ammonia [as N] (EPA 350.1, SM 4500-NH3 C, SM 4500-NH3 D, SM 4500-NH3 G or SM 4500-NH3 H)Lab Report, ADaPT upload and updated tables
8-52. 8-51.Water, Chloride (EPA 300.0, EPA 9056, EPA 9251, EPA 9053, SM 4500CI B, SM 4500CI C or SM 4500CI E)Lab Report, ADaPT upload and updated tables
8-53. 8-52.Water, Hardness, Total [as CaCO3] (SM 2340 B or SM 2340 C)Lab Report, ADaPT upload and updated tables
8-54. 8-53.Water, Nitrate [as N] (EPA 300.0 or EPA 353.2)Lab Report, ADaPT upload and updated tables
8-55. 8-54.Water, Nitrate-Nitrite [as N] (EPA 300.0, EPA 353.2, SM 4500-NO3 E or SM 4500-NO3 F)Lab Report, ADaPT upload and updated tables
8-56. 8-55.Water, Nitrite [as N] (EPA 300.0, EPA 300.1, SM 4500-NO2 B or SM 4500-NO3 F)Lab Report, ADaPT upload and updated tables
8-57. 8-56.Water, Organic Carbon, Total (SM 5310 B, SM 5310 C or EPA 9060)Lab Report, ADaPT upload and updated tables
8-58. 8-57.Water, Orthophosphate [as P] (EPA 300.0, EPA 300.1, EPA 365.1, EPA 365.3, EPA 9056, SM 4500-PE or SM 4500-PF)Lab Report, ADaPT upload and updated tables
8-59. 8-60.Water, Residue-filterable [Total Dissolved Solids] (SM 2540 C)Lab Report, ADaPT upload and updated tables
8-60. 8-61.Water, Residue-nonfilterable [Total Suspended Solids] (SM 2540 D)Lab Report, ADaPT upload and updated tables
8-61. 8-62.Water, Sulfate (ASTM D516-02, ASTM D516-90, EPA 300.0, EPA 300.1, EPA 375.2, EPA 9038, EPA 9056 or SM 4500-SO4 C)Lab Report, ADaPT upload and updated tables
8-62. 8-63.Water, Heterotrophic Plate Count (SM 9215 B or SIMPLATE)Lab Report, ADaPT upload and updated tables
8-63. 8-64.Water, Acute Bioassay-96 Hour, Freshwater, Vertebrate/Invertebrate [Vertebrate: Pimephales promelas or Cyprinella leedsi/Invertebrate: Ceriodaphnia dubia] (EPA 2000.0/2002.0)Lab Report, ADaPT upload and updated tables
8-64. 8-65.Water, Acute Bioassay-96 Hour, Estuarine + Marine, Vertebrate/Invertebrate [Vertebrate: Menidia beryllina, Meridia menidia or Menida peninsulae/Invertebrate: Mysidopsis bahia] (EPA 2006.0/2007.0)Lab Report, ADaPT upload and updated tables
8-65.Water, GC/MS Full Scan, Alkanes, Isoalkanes, Cycloalkanes, Aromatics, Bicyclane, Sterane, and Terpane Biomarkers (ASTM D5739 High Resolution GC/MS)Lab Report, ADaPT upload and updated tables
8-66.Water, Gasoline Hydrocarbon Composition, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins] (EPA 8260Mod, High Resolution GC/MS)Lab Report, ADaPT upload and updated tables
8-67.Water, 5 Fuel Oxygenates, MTBE, DIPE, TAME, ETBE and TBA (EPA 8260Mod, High Resolution GC/MS)Lab Report, ADaPT upload and updated tables
8-68.Water, C10-C40 Alkane Fingerprint, N-Alkanes and Isoalkanes (ASTM D3328 GC/MS)Lab Report, ADaPT upload and updated tables
8-69. 8-66.Water, BTEX/MTBE + Naphthalene (EPA 8260)Lab Report, ADaPT upload and updated tables
8-70. 8-67.Water, EDC [1,2-dichloroethane] (EPA Method 8021 or 8260)Lab Report, ADaPT upload and updated tables
8-71. 8-68.Water, Methane (EPA SOP RSK-175)Lab Report, ADaPT upload and updated tables
8-72. 8-69.Water, Cumene (Isopropyl benzene), Trimethylbenzene, 1,2,3-, Trimethylbenzene, 1,2,4- and Trimethylbenzene, 1,3,5- (EPA 8260)
8.C.AIR ANALYSIS
8-73. 8-70.Air, Total Petroleum Hydrocarbons (EPA Method 18 or TO-3)Lab Report and updated tables
8-74. 8-71.Air, Volatile Organic Aromatics (EPA Method TO-15)Lab Report and updated tables
8-75. 8-72.Air, Polycyclic Aromatic Hydrocarbons (EPA Method TO-13)Lab Report and updated tables
8-76. 8-73.Air, Volatile Organic Compounds (EPA Method TO-17)Lab Report and updated tables
8.D.PRODUCT ANALYSIS
8-77.Product, C3-C44 Hydrocarbon Fingerprint, Gasoline PIANO [paraffins, isoparaffins, aromatics, naphthenes and olefins], alkanes and isoalkanes (ASTM D3328 High Resolution GC/FID)Lab Report, ADaPT upload and updated tables
8-78. 8-74.Product, GC/MS Full Scan, alkanes, isoalkanes, cycloalkanes, aromatics, bicyclane, sterane, and terpane biomarkers (ASTM D5739 High Resolution GC/MS)Lab Report, ADaPT upload and updated tables
8.E. 8.D.OTHER ANALYSIS
8-79. 8-75. 8-74.Additional Laboratory % Surcharge authorized in the ATC contract for 7 Day Turnaround. The price should be a total of all standard costs for analysis receiving 7 Day Turnaround in each Task. Enter this price in the Quant. column for the associated task. The rate is the % surcharge authorized in the ATC contract (% surcharge is calculated using the item price, where: $1.00 = 100%, $0.75 = 75%, ect.). This will be payable per sample per % surcharge utilizing the dollars as the number of units. Additional Laboratory charge for 7 Day Turnaround. This is an additional charge (percentage) above the normal rate for expedited turnaround by the laboratory for an analysis.Lab Report, ADaPT upload and updated tables
8-80. 8-76. 8-75.Additional Laboratory % Surcharge authorized in the ATC contract for 3 Day Turnaround. The price should be a total of all standard costs for analysis receiving 3 Day Turnaround in each Task. Enter this price in the Quant. column for the associated task. The rate is the % surcharge authorized in the ATC contract (% surcharge is calculated using the item price, where: $1.00 = 100%, $0.75 = 75%, ect.). This will be payable per sample per % surcharge utilizing the dollars as the number of units. Additional Laboratory charge for 3 Day Turnaround. This is an additional charge (percentage) above the normal rate for expedited turnaround by the laboratory for an analysis.Lab Report, ADaPT upload and updated tables
8-81. 8-77. 8-76.Additional Laboratory % Surcharge authorized in the ATC contract for 1 Day Turnaround. The price should be a total of all standard costs for analysis receiving 1 Day Turnaround in each Task. Enter this price in the Quant. column for the associated task. The rate is the % surcharge authorized in the ATC contract (% surcharge is calculated using the item price, where: $1.00 = 100%, $0.75 = 75%, ect.). This will be payable per sample per % surcharge utilizing the dollars as the number of units. Additional Laboratory charge for 1 Day Turnaround. This is an additional charge (percentage) above the normal rate for expedited turnaround by the laboratory for an analysis.Lab Report, ADaPT upload and updated tables
9.SOIL SOURCE REMOVAL RELATED
9-1.a.Sheet Piling Installation for ≤ 20 feet deep ExcavationField notes and photo documentation
9-1.b.Sheet Piling Rental for ≤ 20 feet deep ExcavationField notes and photo documentation
9-1.c.Sheet Piling Rental for ≤ 20 feet deep ExcavationField notes and photo documentation
9-1.d.Sheet Piling Rental for ≤ 20 feet deep ExcavationField notes and photo documentation
9-2.a.Sheet Piling Installation for > 20 feet deep ExcavationField notes and photo documentation
9-2.b.Sheet Piling Rental for > 20 feet deep ExcavationField notes and photo documentation
9-2.c.Sheet Piling Rental for > 20 feet deep ExcavationField notes and photo documentation
9-2.d.Sheet Piling Rental for > 20 feet deep ExcavationField notes and photo documentation
9-3.Conventional Soil Excavation and Loading ≤ 300 cubic yardsField notes and photo documentation
9-4.Conventional Soil Excavation and Loading > 300 cubic yardsField notes and photo documentation
9-5.LDA Excavation and Loading Without Casing ≤ 300 cubic yardsField notes and photo documentation
9-6.LDA Excavation and Loading Without Casing > 300 cubic yardsField notes and photo documentation
9-7.aLDA Excavation and Loading With Surface Casing ≤ 300 cubic yardsField notes and photo documentation
9-7.b.LDA Excavation and Loading With Driven Casing ≤ 300 cubic yardsField notes and photo documentation
9-8.a.LDA Excavation and Loading With Surface Casing > 300 cubic yardsField notes and photo documentation
9-8.b.LDA Excavation and Loading With Driven Casing > 300 cubic yardsField notes and photo documentation
9-9Flowable Fill Concrete and InstallationField notes and volume documentation/supplier load documentation
9-10.Clean Backfill Material, Compaction and Testing (includes transport) ≤ 300 cubic yardsField notes, backfill lab report, compaction test results, transport load tickets/supplier load documentation
9-11.Clean Backfill Material, Compaction and Testing (includes transport) > 300 cubic yardsField notes, backfill lab report, compaction test results, transport load tickets/supplier load documentation
9-12.a.Clean Overburden Used As Backfill, Compaction and Testing ≤ 300 cubic yardsField notes, backfill lab report, compaction test results, transport load tickets/supplier load documentation
9-12.b.Clean Overburden Used As Backfill, Compaction and Testing > 300 cubic yardsField notes, backfill lab report, compaction test results, transport load tickets/supplier load documentation
9-13.Pea GravelField notes, transport load tickets/other supplier load documentation
9-14.#57 StoneField notes, transport load tickets/other supplier load documentation
9-15.Dewatering System, up to 12 well points (includes installation)Field notes
9-16.Additional Dewatering System Well Points (2) (includes installation)Field notes
9-17.Dewatering System, up to 12 well points (includes installation)Field notes
9-18.Additional Dewatering System Well Points (2) (includes installation)Field notes
9-19.Dewatering System, up to 12 well points (includes installation)Field notes
9-20.Additional Dewatering System Well Points (2) (includes installation)Field notes
10.PETROLEUM STORAGE TANK REMOVAL AND DISPOSAL
10-1.Remove and Dispose Petroleum Storage Tank - ≤ 1,000 gal. capacityField notes, photos, storage system closure form, disposal manifest or documentation and recycling credits if applicable
10-2.Remove and Dispose Petroleum Storage Tank - > 1,000 to 5,000 gal. capacityField notes, photos, storage system closure form, disposal manifest or documentation and recycling credits if applicable
10-3.Remove and Dispose Petroleum Storage Tank - > 5,000 to 10,000 gal. capacityField notes, photos, storage system closure form, disposal manifest or documentation and recycling credits if applicable
10-4.Remove and Dispose Petroleum Storage Tank - > 10,000 gal. capacityField notes, photos, storage system closure form, disposal manifest or documentation and recycling credits if applicable
11.DEBRIS, WASTE AND PRODUCT REMOVAL AND DISPOSAL
11-1.Removal and Loading of Asphalt and/or Concrete - up to 4 inch thicknessField notes, photo documentation,updated figure w/ areal extent or receipt
11-2.Additional Removal/Loading Cost for Concrete - > 4 inch thicknessField notes, photo documentation,updated figure w/ areal extent or receipt
11-3.Loading, Transport and Disposal/Recycle Clean OverburdenField notes, weigh tickets and disposal facility documentation, manifests, receipt, ect.
11-4.Transport and Disposal of Clean ConcreteField notes, weigh tickets and disposal facility documentation, manifests, receipt, ect.
11-5.Transport and Disposal of Mixed DebrisField notes, weigh tickets and disposal facility documentation, manifests, receipt, ect.
11-6.Transport and Disposal of Petroleum Impacted Soil (includes drum)Field notes, photo documentation, waste manifest and disposal facility documentation or receipt
11-7.Transport Petroleum Impacted Soil (bulk) ≤ 100 milesField notes, photo documentation, waste manifest and disposal facility documentation or receipt
11-8.Transport Petroleum Impacted Soil (bulk) > 100 milesField notes, photo documentation, waste manifest and distance justification, and disposal facility documentation or receipt
11-9.Disposal of Petroleum Impacted Soil at a Landfill (bulk) ≤ 450 tonsField notes, photo documentation, waste manifest and distance justification, and disposal facility documentation or receipt
11-10.Disposal of Petroleum Impacted Soil at a Landfill (bulk) > 450 tonsField notes, photo documentation, waste manifest and distance justification, and disposal facility documentation or receipt
11-11.Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) ≤ 450 tonsField notes, photo documentation, waste manifest and thermal treatment certification, and disposal facility documentation or receipt
11-12.Disposal of Petroleum Impacted Soil at a Thermal Treatment Facility (bulk) > 450 tonsField notes, photo documentation, waste manifest and thermal treatment certification, and disposal facility documentation or receipt
11-13.Transport and Disposal of Petroleum Contact Water (includes drum)Field notes, photo documentation, waste manifest and disposal facility documentation or receipt
11-14.Transport and Disposal of Petroleum Contact Water (bulk)Field notes, photo documentation, waste manifest and disposal facility documentation or receipt
11-15.Vacuum Truck Transportation, Disposal and Extraction OperationsField notes, photo documentation, waste manifest and disposal facility documentation or receipt
11-16.Transport and Disposal of Petroleum Product (includes drum)Field notes, photo documentation, waste manifest and disposal facility documentation or receipt
11-17.Transport and Disposal of Petroleum Product (bulk)Field notes, photo documentation, waste manifest and disposal facility documentation or receipt
11-18.Delivery, Pick Up and Rental of 20 Cubic Yard Roll-Off ContainerField notes, photo documentation, waste manifest and disposal facility documentation or receipt
11-19.Additional Rental of 20 Cubic Yard Roll-Off ContainerField notes, photo documentation, waste manifest and disposal facility documentation or receipt
12.RESURFACING
12-1.Asphalt Paving - 2 inch thickness (includes sub-base)Field notes, photo documentation and updated figure w/ areal extent
12-2.Asphalt Paving - additional 1 inch thicknessField notes, photo documentation and updated figure w/ areal extent
12-3.Concrete Paving - 4 inch thickness (includes sub-base)Field notes, photo documentation and updated figure w/ areal extent
12-4.Concrete Paving - additional 1 inch thicknessField notes, photo documentation and updated figure w/ areal extent
12-5.Crushed Lime Rock Cover - 2 inch thicknessField notes, photo documentation and updated figure w/ areal extent
12-6.Grass - SodField notes, photo documentation and updated figure w/ areal extent
12-7.Grass - Seed and MulchField notes, photo documentation and updated figure w/ areal extent
13.IN-SITU INJECTION
13-1.Direct Push Boring with In-Situ InjectionField notes and photo documentation
13-2.In-Situ Injection Into Existing Well/Treatment PointField notes and photo documentation
13-3.Materials to be InjectedField notes, materials documentation and invoice
13-4.Groundwater Injection System (not by direct push)Field notes and photo documentation
13-5.Groundwater Injection System (not by direct push)Field notes and photo documentation
14.REMEDIAL ACTION CONSTRUCTION
14.A.TRENCHING
14-1.a.Trenching and Installation of 1-10 Plumbing (and Electrical) Lines in TrenchField notes (Including documentation of successful pressure testing) and photo documentation
14-1.b.Trenching and Installation of 11 - 20 LinesField notes (Including documentation of successful pressure testing) and photo documentation
14-1.c.Trenching and Installation of 21 - 30 LinesField notes (Including documentation of successful pressure testing) and photo documentation
14-1.d.Trenching and Installation of Additional 1-10 Lines Greater Than 30 LinesField notes (Including documentation of successful pressure testing) and photo documentation
14-2.Installation of Plumbing (and Electrical) Lines Above Ground: Per Linear Foot of Piping. Electrical lines are not counted in determination of costs.Field notes (Including documentation of successful pressure testing) and photo documentation
14-3.Plumbing and Electrical Materials/Equipment Installed in Trench (If FDEP authorizes, submit quote(s) with Change Order)Field notes and vendor invoice
14-3.a.Traffic Bearing Trench Plates (materials)Field notes and vendor invoice
14-3.b.Infiltration Gallery InstallationField notes and vendor invoice
14.B.REMEDIATION SYSTEM INTEGRATION AND STARTUP
14-4.a.System Installation/Integration/Startup - 1 Technology Component - 1-10 Recovery/Treatment PointsField notes, system readings and photo documentation
14-4.b.System Installation/Integration/Startup - 1 Technology Component - 11-20 Recovery/Treatment PointsField notes, system readings and photo documentation
14-4.c.System Installation/Integration/Startup - 1 Technology Component - 21-30 Recovery/Treatment PointsField notes, system readings and photo documentation
14-4.d.System Installation/Integration/Startup - 1 Technology Component - 1-10 Additional Recovery/Treatment Points greater Than 30 (This tem is used in conjunction with 15.4.c when needed)Field notes, system readings and photo documentation
14-5.System Installation/Integration/Startup – Addition of 1 Technology ComponentField notes, system readings and photo documentation
14-6.Compound Construction/Fencing (materials)Field notes and vendor invoice
14-7.Utility DropField notes and vendor invoice
14-8.Utility ConnectionField notes and vendor invoice
14-9.Utility DisconnectField notes and vendor invoice
15.REMEDIAL ACTION - PACKAGED WORK SCOPES (Including Remediation System Equipment)
15.A.PILOT TEST PACKAGES (Including Remediation System Equipment)
15-1.Groundwater Recovery System Pilot Test - 8 hoursField notes, photo documentation and system readings
15-2.Groundwater Recovery System Pilot Test - Additional TimeField notes and system readings
15-3.Air Sparging or Biosparging Pilot Test - 8 hoursField notes, photo documentation and system readings
15-4.Air Sparging or Biosparging Pilot Test - Additional TimeField notes and system readings
15-5.Vapor Extraction Pilot Test - 8 hoursField notes, photo documentation and system readings
15-6.Vapor Extraction Pilot Test - Additional TimeField notes and system readings
15-7.Vapor Extraction/Aquifer Pumping Test - 8 hoursField notes, photo documentation and system readings
15-8.Vapor Extraction/Aquifer Pumping Test - Additional TimeField notes and system readings
15-9.Air Sparging/Vapor Extraction Pilot Test - 8 hoursField notes, photo documentation and system readings
15-10.Air Sparging/Vapor Extraction Pilot Test - Additional TimeField notes and system readings
15-11.Multi-Phase Pilot Test - 8 hoursField notes, photo documentation and system readings
15-12.Multi-Phase Pilot Test - Additional TimeField notes and system readings
15-13.Air Sparging/Multiphase Extraction Pilot Test - 8 hoursField notes, photo documentation and system readings
15-14.Air Sparging/Multiphase Extraction Pilot Test - Additional TimeField notes and system readings
15-15.In-Situ Chemical Oxidation (including Ozone) Pilot Test - 8 hoursField notes, photo documentation and system readings
15-16.In-Situ Chemical Oxidation (including Ozone) Pilot Test - Additional TimeField notes and system readings
15.B.SHORT TERM/EPISODIC SYSTEM OPERATION PACKAGES (Including Remediation System Equipment)
15-17.Groundwater Treatment System Package - MediumField notes, photo documentation and system readings
15-18.Groundwater Treatment System Package - MediumField notes, photo documentation and system readings
15-19.Air Sparge System Package - MediumField notes, photo documentation and system readings
15-20.Air Sparge System Package - MediumField notes, photo documentation and system readings
15-21.AS/SVE System Package - MediumField notes, photo documentation and system readings
15-22.AS/SVE System Package - MediumField notes, photo documentation and system readings
15-23.MPE System Package - MediumField notes, photo documentation and system readings
15-24.MPE System Package - MediumField notes, photo documentation and system readings
15-25.AS/MPE System Package - MediumField notes, photo documentation and system readings
15-26.AS/MPE System Package - MediumField notes, photo documentation and system readings
15-27.SVE System Package - MediumField notes, photo documentation and system readings
15-28.SVE System Package - MediumField notes, photo documentation and system readings
15-29.In-Situ Chemical Oxidation (including Ozone) Package – MediumField notes, photo documentation and system readings
15-30.In-Situ Chemical Oxidation (including Ozone) Package – MediumField notes, photo documentation and system readings
16.MONTHLY REMEDIATION SYSTEM O&M PACKAGED WORK SCOPES (Excluding Remediation System Equipment)
16-1.System O&M Package - SmallField notes, system readings, telemetry records and runtime calculations
16-2.System O&M Package - MediumField notes, system readings, telemetry records and runtime calculations
16-3.System O&M Package - LargeField notes, system readings, telemetry records and runtime calculations
16-4.System O&M Package - Extra LargeField notes, system readings, telemetry records and runtime calculations
16-5.Supplemental System O&M Package - Add Thermox or Catox TreatmentField notes, system readings, telemetry records and runtime calculations
17.REMEDIAL ACTION SYSTEM/EQUIPMENT USE (Equipment Only, Excluding O&M)
17-1.Medium Holding Tank - 2,000 to 6,000 gal. capacity - Short Term ≤ 6 mos.Field notes and photo documentation
17-2.Medium Holding Tank - 2,000 to 6,000 gal. capacity - Long Term > 6 mos.Field notes and photo documentation
17-3.Large Holding Tank > 6,000 to 10,000 gal. capacity - Short Term ≤ 6 mos.Field notes and photo documentation
17-4.Large Holding Tank > 6,000 to 10,000 gal. capacity - Long Term > 6 mos.Field notes and photo documentation
17-5.Groundwater Treatment System - Stand Alone Small - Short Term ≤ 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-6.Groundwater Treatment System - Stand Alone Small - Long Term > 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-7.Groundwater Treatment System - Stand Alone Medium - Short Term ≤ 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-8.Groundwater Treatment System - Stand Alone Medium - Long Term > 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-9.Groundwater Treatment System - Stand Alone Large - Short Term ≤ 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-10.Groundwater Treatment System - Stand Alone Large - Long Term > 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-11.Air Sparge System - Small - Short Term ≤ 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-12.Air Sparge System - Small - Long Term > 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-13.Air Sparge System - Medium - Short Term ≤ 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-14.Air Sparge System - Medium - Long Term > 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-15.Air Sparge System - Large - Short Term ≤ 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-16.Air Sparge System - Large - Long Term > 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-17.AS/SVE System - Small - Short Term ≤ 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-18.AS/SVE System - Small - Long Term > 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-19.AS/SVE System - Medium - Short Term ≤ 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-20.AS/SVE System - Medium - Long Term > 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-21.AS/SVE System - Large - Short Term ≤ 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-22.AS/SVE System - Large - Long Term > 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-23.MPE System - Small - Short Term ≤ 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-24.MPE System - Small - Long Term > 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-25.MPE System - Medium - Short Term ≤ 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-26.MPE System - Medium - Long Term > 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-27.MPE System - Large - Short Term ≤ 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-28.MPE System - Large - Long Term > 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-29.Groundwater Treatment - Add On - Small - Short Term ≤ 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-30.Groundwater Treatment - Add On - Medium - Short Term ≤ 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-31.Groundwater Treatment - Add On - Large - Short Term ≤ 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-32.Groundwater Treatment - Add On - Small - Long Term > 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-33.Groundwater Treatment - Add On - Medium - Long Term > 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-34.Groundwater Treatment - Add On - Large - Long Term > 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-35.Carbon Off Gas Treatment - Add On - Small - Short Term ≤ 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-36.Carbon Off Gas Treatment - Add On - Medium - Short Term ≤ 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-37.Carbon Off Gas Treatment - Add On - Large - Short Term ≤ 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-38.Carbon Off Gas Treatment - Add On - Small- Long Term > 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-39.Carbon Off Gas Treatment - Add On - Medium - Long Term > 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-40.Carbon Off Gas Treatment - Add On - Large - Long Term > 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-41.Thermox/Catox Off Gas Treatment - Add On - Small - Short Term ≤ 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-42.Thermox/Catox Off Gas Treatment - Add On - Medium - Short Term ≤ 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-43.Thermox/Catox Off Gas Treatment - Add On - Large - Short Term ≤ 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-44.Thermox/Catox Off Gas Treatment - Add On - Small - Long Term > 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-45.Thermox/Catox Off Gas Treatment - Add On - Medium - Long Term > 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-46.Thermox/Catox Off Gas Treatment - Add On - Large - Long Term > 6 mos.Field notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-47.Soil Vapor Extraction (SVE) System - Small - Short Term ≤ 6 MonthsField notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-48.Soil Vapor Extraction (SVE) System - Small - Long Term > 6 MonthsField notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-49.Soil Vapor Extraction (SVE) System - Medium - Short Term ≤ 6 MonthsField notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-50.Soil Vapor Extraction (SVE) System - Medium - Long Term > 6 MonthsField notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-51.Soil Vapor Extraction (SVE) System - Large - Short Term ≤ 6 MonthsField notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-52.Soil Vapor Extraction (SVE) System - Large - Long Term > 6 MonthsField notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-53.Air Sparge/Multphase Extraction (AS/MPE) System - Small - Short Term ≤ 6 MonthsField notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-54.Air Sparge/Multphase Extraction (AS/MPE) System - Small - Long Term > 6 MonthsField notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-55.Air Sparge/Multphase Extraction (AS/MPE) System - Medium - Short Term ≤ 6 MonthsField notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-56.Air Sparge/Multphase Extraction (AS/MPE) System - Medium - Long Term > 6 MonthsField notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-57.Air Sparge/Multphase Extraction (AS/MPE) System - Large - Short Term ≤ 6 MonthsField notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-58.Air Sparge/Multphase Extraction (AS/MPE) System - Large - Long Term > 6 MonthsField notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-59.In-Situ Chemical Oxidation (including Ozone) System – Small Term > 6 MonthsField notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-60.In-Situ Chemical Oxidation (including Ozone) System – Small ≤ 6 MonthsField notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-61.In-Situ Chemical Oxidation (including Ozone) System – Medium Term > 6 MonthsField notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period
17-62.In-Situ Chemical Oxidation (including Ozone) System – Medium ≤ 6 MonthsField notes, maintenance log for State owned equipment, system readings, telemetry report and % run time calculation for period

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .