ADDENDUM No. 1 SCF Access Controls 093024.pdf
PDF 2 MB Posted
- Solicitation number
- 2024-013P23
- Issued by
- Lincoln County, Colorado
About this file
Addendum No. 1 for the Colorado Department of Corrections (CDOC) pertains to the Access Controls Electronic Security System Replacement project at the Sterling Correctional Facility (SCF), covering Phases 1 and 2. This addendum, dated September 30, 2024, consists of one cover page and three attachment pages, with the primary attachment being the Mandatory Pre-Walk Sign-In Sheets from a pre-bid meeting held on September 19, 2024, at 10:00 AM. The solicitation number is RFQ1 2025000014, with bid opening scheduled for October 10, 2024, at 5:00 PM. The pre-bid meeting sign-in sheets document attendance from multiple security and technology firms, including Securitas, CML Security, Cornerstone, and Hyper30/ANM.
The bidder's list included in the addendum provides contact details for potential contractors, with most firms marked as approved for the CTS (Correctional Technology Systems) form and PHA (Pre-Hire Assessment). The project scope involves comprehensive electronic security system replacement, including door control, intercom, paging, access control, fiber network, woodwork, countertops, cooling systems for security rooms, Uninterruptible Power Supply (UPS), and Transient Voltage Surge Suppression (TVSS) systems. The new system will require a Programmable Logic Controller (PLC) based control system with integrated systems, as outlined in specification sections 28 70 00 through 28 70 95, covering electronic security and technology drawings.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 1 – Colorado Department of Corrections
Date: 09/30/24 Project: Access Controls Electronic Security System Replacement - Phase 1 & 2
This Addendum consists of ONE (1) cover/narrative pages, and THREE (3) attachment page(s) for a total of FOUR (4) page(s).
GENERAL:
1. Attachment No. 1 – Mandatory Pre-Walk Sign-In Sheets
SPECIFICATIONS:
1. N/A
DRAWINGS:
1. N/A
End of Addendum No. 1
File details come from the government source that posted it. Updated .