Addendum_No._1_PR8286_Water_Materials_Alliance.pdf

PDF 151 KB Posted

Attached to
Water Materials Alliance
Solicitation number
PR8286
Issued by
Orange County, Orlando City, Florida

About this file

This document is Addendum No. 1 for Request for Proposal (RFP) PR8286 issued by the Orlando Utilities Commission (OUC) for a Water Materials Alliance contract. The addendum extends the proposal submission deadline to May 16, 2025, at 2:00 p.m. local time and addresses multiple vendor questions regarding the solicitation. The contract is anticipated to be a five-year agreement with potential for vendor managed inventory and consignment inventory services, covering a comprehensive range of water infrastructure materials including pipes, valves, fittings, and related components.

The addendum clarifies key procurement details, including OUC's flexibility in awarding contracts to single or multiple vendors based on proposal evaluations. Pricing terms require suppliers to maintain firm pricing throughout the contract term, with potential for annual reviews and adjustments. If pricing cannot remain constant, vendors must provide detailed methodology for potential price changes. The solicitation emphasizes transparency around inventory management, technical support, and supply chain services, with OUC reserving the right to determine the most advantageous contract structure. Additionally, the document restricts communication between suppliers and OUC personnel, mandating all inquiries be directed solely to the designated buyer of record.

View the file

Other files

File Type Posted
Letter_of_Intent_to_Award_RFP_PR8286.pdf PDF
Letter_of_Intent_to_Award_RFP_PR8286.pdf PDF
Entity_Crimes_-_Sworn_Statement_10-4-11.pdf PDF
Procurement_general_terms_cond_goods_services.pdf PDF
Dispute_Disclosure_10-4-11.pdf PDF
Entity_Crimes_-_Sworn_Statement_10-4-11.pdf PDF
OUC_contract_sample.pdf PDF
proc_exceptions_form_2.pdf PDF
Dispute_Disclosure_10-4-11.pdf PDF
OUC_contract_sample.pdf PDF
Dispute_Disclosure_10-4-11.pdf PDF
OUC_contract_sample.pdf PDF
proc_exceptions_form_2.pdf PDF
proc_exceptions_form_2.pdf PDF
Dispute_Disclosure_10-4-11.pdf PDF
Entity_Crimes_-_Sworn_Statement_10-4-11.pdf PDF
Procurement_general_terms_cond_goods_services.pdf PDF
Procurement_general_terms_cond_goods_services.pdf PDF
Entity_Crimes_-_Sworn_Statement_10-4-11.pdf PDF
Procurement_general_terms_cond_goods_services.pdf PDF
OUC_contract_sample.pdf PDF
proc_exceptions_form_2.pdf PDF
Addendum_No._1_PR8286_Water_Materials_Alliance.pdf PDF
proc_addenda_form.pdf PDF
Addendum_No._1_PR8286_Water_Materials_Alliance.pdf PDF
Addendum_No._1_PR8286_Water_Materials_Alliance.pdf PDF
proc_addenda_form.pdf PDF
proc_addenda_form.pdf PDF
proc_addenda_form.pdf PDF
Addendum_No._1_PR8286_Water_Materials_Alliance.pdf PDF
proc_addenda_form.pdf PDF
Addendum_No._1_PR8286_Water_Materials_Alliance.pdf PDF
proc_addenda_form.pdf PDF
RFP_PR8286_Water_Materials_Alliance.pdf PDF
PR8286_Attachment_B_Price_Schedule.xlsx XLSX spreadsheet
PR8286_Attachment_B_Price_Schedule.xlsx XLSX spreadsheet
RFP_PR8286_Water_Materials_Alliance.pdf PDF
PR8286_Attachment_B_Price_Schedule.xlsx XLSX spreadsheet
RFP_PR8286_Water_Materials_Alliance.pdf PDF
PR8286_Attachment_B_Price_Schedule.xlsx XLSX spreadsheet
PR8286_Attachment_B_Price_Schedule.xlsx XLSX spreadsheet
RFP_PR8286_Water_Materials_Alliance.pdf PDF
SMWE_As_built_Drawings_Signed.pdf PDF
PR8286_Attachment_B_Price_Schedule.xlsx XLSX spreadsheet
RFP_PR8286_Water_Materials_Alliance.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ORLANDO UTILITIES COMMISSION

100 W. Anderson Street l PO Box 3193 l Orlando, FL 32801 l 407-434-2701 Telephone l www.ouc.com

April 15, 2025

To: All Prospective Proposers From: Maria Cabreja, Supply Chain & Logistics Supervisor Subject: Addendum No. 1 RFP PR8286 Water Materials Alliance

The purpose of this Addendum is to address clarifications and questions in response to the subject solicitation and to extend the Proposals due date to May 16, 2025.

Questions:

Question 1.

This list appears to have some Sole Source items listed. We would be unable to bid the below, as only 1 company has access to them. Is it possible to remove those items?

a. Item number: 09600025- ipearl / Sensus item

b. Item number: 09600028….ipearl

c. Item 09600027…ipearl

Response 1.

The listed sole source items will be removed from the bid. These items will not be considered in the pricing evaluation.

Question 2.

Can you please provide additional information for the following items? Manufacturer and manufactures part number would make sure we are pricing the brand you require.

• 05103012- 2” pvc restrained joint…..I am guessing that this one might be a certalok product, just need specifics

• 05901322- spline restrained joint?

• 07406002- can you please confirm the manufacturer and part number?

• 06301002- gate valve screw?

• 08801475- this mentions Mueller company. Most of your brass appears to be ford meter box, would you like the Ford equivalent for this item or does It have to be Mueller?

• 07305202- can you please confirm manufacturer and part number

• 07301021- same as above….please confirm brand and part number of clamp

• 07605012-2” PVC restrained joint

• 05802224- 24” MJ restrained joint

• 05802236- 36”restrained joint

• 05506008- says 8” flange pipe, does not confirm if it is flange x flange….or flange x plain end….and does not advise of the length needed from flange to flange

• 05802108- retainer split ring- name brand needed and part number

• 10s22037- is there a particular brand and part number needed?

• 07703212

• 08700150 http://www.ouc.com/

• 05506004

• 05506006

• 09303112

• 07703012

Response 2.

Additional information for the listed items can be accessed in the Water Material Manual Specification, in the following link; http://www.ouc.com/docs/purchasing/wm_manual.pdf?sfvrsn=6

Question 3.

VMI & consignment inventory We noticed that this newly released RFP differed from OUC’s request in 2018 in a few ways. It looks like the Vendor Managed Inventory & Consignment Inventory requirements were removed.

Just wanted to confirm that OUC is no longer interested in the awarded distributer monitoring inventory levels for some items at the warehouse. If this service is still needed, can you please advise how often you would like visits to occur…quarterly…etc.

Response 3.

Per the Detailed Scope of Work and Requirements on page #20;

5. Supplier is required to assist OUC, as requested, in designating certain materials for Vendor Managed Inventory or Vendor Owned (Consignment) Inventory, in such case, supplier shall be capable of managing those materials from their own distribution facility or coordinating the management of such inventory with the manufacturer from the manufacturer’s facility.

Question 4.

Section 1.5 Price and Costs This section states that the pricing submitted for this proposal, must be held throughout the life of the contract and extensions.

Does this mean that the prices provided must be held for 5-7 years? Manufacturers will typically consider holding pricing for 1 year. Would OUC consider requesting pricing fixed for the first year, with a renewal period to follow after each year. During the renewal period we would review / discuss consideration for each product that is experiencing an increase from the manufacturer.

Response 4.

If pricing is not firm for the duration of the initial 5-year term the Supplier must state how long the price is firm for and provide the timing, methodology, and calculations proposed for any adjustments up or down to the proposed pricing.

Question 5.

Are you able to confirm the number / names OUC team members that will be evaluating the RFP submissions ( Selection Committee).

Response 5.

OUC does not disclose this information.

http://www.ouc.com/docs/purchasing/wm_manual.pdf?sfvrsn=6

ORLANDO UTILITIES COMMISSION

100 W. Anderson Street l PO Box 3193 l Orlando, FL 32801 l 407-434-2701 Telephone l www.ouc.com

Question 6.

Multiple vendors award- The bid documents state that OUC has the right to award either a contract to a single vendor, or to work with multiple vendors and award multiple contracts. Is the intention here to have a primary awardee, and establish a backup / secondary vendor for all items.

Or would contracts for primary and secondary vendor be awarded by line item?

Response 6.

It will depend on the Proposals evaluation and what is in OUC’s best interest based on the committee’s recommendation. OUC reserves the right to award a single or multiple contracts for all proposal items, or to award separate contracts for single proposal items.

Question 7.

The USA is currently negotiating tariff rates around the world. They issued a 90 day pause to all countries except China, where quite a bit of construction materials are sourced.

Can you please advise on how OUC will handle request for increases based on tariffs and any price increases that stem from them?

Response 7.

Please refer to response #4, related to price and costs.

Reminder:

Bids are due no later than 2:00 p.m. Local Time on May 16, 2025 through Vendorlink submission.

Your proposal response must acknowledge Addendum No. 1 was received or your bid may be considered non-responsive. In other respects, except as specifically stated above, the subject request for Proposal remains unchanged.

Note:

There shall be no communication between the supplier, their employees or subcontractors concerning this RFP to anyone within OUC except the buyer of record.

http://www.ouc.com/

April 15, 2025
To: All Prospective Proposers
From: Maria Cabreja, Supply Chain & Logistics Supervisor
Subject: Addendum No. 1 RFP PR8286 Water Materials Alliance

File details come from the government source that posted it. Updated .