This is Addendum No. 1 to an Invitation to Bid (ITB 26-139-PW) issued by Eugene Water & Electric Board (EWEB) for the Van Buren Street Main Replacement project in Eugene, Oregon. The addendum modifies the original bidding documents by revising the Bid Form Section 00400 to reflect an updated Bid Table and incorporates a Blanket Erosion Control Permit as Attachment No. 1 under Section 10000 of the Specifications. The project requires installation of approximately 150 linear feet of 16-inch diameter ductile iron pipe, 100 linear feet of 24-inch jacked and bored steel casing, and associated appurtenances including three butterfly valves, one fire hydrant assembly, curb and gutter work, sidewalk installation, temporary asphalt restoration, erosion control measures, traffic control, and as-built survey documentation. The revised bid submission deadline is 2:00 p.m. Pacific Standard Time on Thursday, August 13, 2026, with the Subcontractors List due by 4:00 p.m. the same day. Substantial completion is scheduled for December 1, 2026, with final completion by December 15, 2026. Contractors must start work within 10 calendar days of receiving the Notice to Proceed.
Bidders must provide a bid bond equal to 10 percent of the total bid amount, along with performance and payment bonds equal to 100 percent of the contract award. All bidders must be registered with the Oregon Construction Contractors Board or Landscape Contractors Board and comply with prevailing wage requirements under ORS 279C.800 to 279C.870. Oregon resident bidders are preferred under ORS 279A.120 when price, fitness, availability, and quality are otherwise equal. Non-resident bidders may be subject to a percent increase added to their bid based on preferences granted to bidders in their home state. The addendum constitutes a material change to the bid, and bidder acknowledgment is required by signature and return of the addendum copy with the bid response or by circling the addendum number on the Bid Form. The project is subject to City of Eugene erosion prevention permit requirements, including implementation of best management practices, stormwater inlet protection, concrete washout facilities, soil stabilization measures, and dewatering requirements to prevent impacts to the city's stormwater system and natural resources.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev 4-21-20
August 4, 2026
ADDENDUM #1
Van Buren Street Main Replacement
ITB 26-139-PW
This addendum modifies the bidding document(s) for work only to the extent indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force. This addendum shall be added as a part of the original bidding document and shall become part of the work required.
Description of Change(s)
1. The Bid Form-Section 00400 has been revised to reflect an updated Bid Table. Bid Form Section 00400 shall be replaced in its entirety with the attached Bid Form Section 00400 – Revision 1.
2. The attached Blanket Erosion Control Permit shall be incorporated as Attachment No.1 under Section 10000 of the Specifications.
CLOSING DATE AND TIME
All references to the closing date and time are changed to the following:
Bid Submission no later than: 2:00 p.m. (PST) – Thursday August 13, 2026
Subcontractors List before: 4:00 p.m. (PST) -- Thursday, August 13, 2026
This addendum constitutes a MATERIAL CHANGE to the bid. ITS RECEIPT BY THE BIDDER IS TO BE ACKNOWLEDGED BY A SIGNATURE AND RETURNING A COPY OF THE ADDENDUM WITH ITS RESPONSE OR BY CIRCLING THE ADDENDUM
NUMBER IN THE APPROPRIATE AREA ON THE BID FORM.
Addendum prepared by:
Wendy Lopez, Purchasing Analyst
The undersigned hereby acknowledges receipt of this Addendum and agrees to be bound by the conditions therein.
Company Name: ________________________________
Signature: ______________________________________ Date __________________________
End of Addendum
Eugene Water & Electric Board Section 00400
Rev. 09/2024 Section 00400
BID FORM – REVISION 1
PROJECT:
BID OPENING:
LOCATION:
Van Buren Street Main Replacement
Thursday, August 13, 2026, 2:00 PM PT
Eugene Water & Electric Board (EWEB) Roosevelt Operations Center 4200 Roosevelt, Blvd Eugene, OR 97402 Phone: 541-685-7150
BID SUBMISSION
Complete, sign, and return the following documents as bid response. Failing to include these documents could lead to rejection of bid.
00400 BID FORM
SIGNED ADDENDA (OR ACKNOWLEDGED ON 00400 BID FORM)
00450 MINIMUM QUALIFICATIONS FORM
00610 BID BOND (If bid is over $100,000)
00430-A FIRST TIER SUBCONTRACTOR FORM
ALL DOCUMENTS COMBINED IN ONE PDF FILE, EXCEPT THAT 1ST TIER SUBCONTRACTOR FORM
MAY BE SUBMITTED SEPARATELY
A. EXCEPTIONS: Bidders, please note that any exceptions or stipulations to any of the requirements of this solicitation must be submitted in accordance with Section 00200, 1.1(g), Protest or Request for Changes of Specifications and/or Bidding Requirements. Exceptions that are not submitted in compliance with Section 00200, 1.1(g), may cause your bid to be ruled non-responsive.
B. ACKNOWLEDGMENT OF RECEIPT OF ADDENDA TO BID DOCUMENTS:
Bidder acknowledges receipt of Addenda and agrees to be bound by their contents.
Circle each bid Addendum posted: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, None Posted
C. CCB/LCB REGISTRATION NUMBER - EWEB Rule 5-0230 Eligibility to Bid; Registration or License
Construction Contracts. EWEB shall not consider a Person's Offer to do Work as a contractor, as defined in ORS 701.005(2), unless the Person has a current, valid certificate of registration issued by the Construction Contractors Board at the time the Offer is made.
Non-complying Entities. EWEB shall deem an Offer non-responsive if it is received from a Person that fails to comply with this rule and shall reject the Offer as stated in ORS 279C.365(1)(k), unless contrary to federal law or subject to different timing requirements set by federal funding agencies.
Bidder is in compliance with the requirements of and is registered and bonded with the State of Oregon Construction Contractor's Board or Landscape Contractors Board as follows:
Registration classification:
Registration No.: Expiration Date:
D. RESPONSIBILITY:
Prior to awarding a Public Improvement Contract, EWEB shall determine whether the lowest Responsible Bidder meets the standards of Responsibility, as defined in ORS 279C.375.
E. BIDDER RESIDENCY INFORMATION:
ORS 279A.120 states, "For the purposes of awarding a public contract, a contracting agency shall":
o Give preference to goods or services that have been manufactured or produced in this state if price, fitness, availability and quality are otherwise equal; and o Add a percent increase to the bid of a non-resident bidder equal to the percent, if any, of the preference given to the bidder in the state in which the bidder resides.
“Resident bidder” means a bidder that has paid unemployment taxes or income taxes in the state of Oregon during the 12 calendar months immediately preceding submission of the bid, has a business address in this state, and has stated in the bid whether the bidder is a “resident bidder” under this paragraph.
“Non-resident Bidder” means a Bidder who is not a “resident Bidder” as defined above
1. CHECK ONE: Bidder is a ( ) RESIDENT Bidder ( ) NON-RESIDENT Bidder.
2. If resident bidder, enter your Oregon business address: (physical and mailing address)
3. If a non-resident bidder, enter state of residency:
4. If a non-resident bidder, do you or your company receive, or are you or your company eligible for any preference in award of contracts with your state’s government or with other governmental bodies in your state?
CHECK ONE: ( ) YES ( ) NO
If YES, state the preference percentage: _________________%
If YES, but not a percentage of bid price, describe the preference:
If YES, state the law or regulation that allows the preference described (legal citation):
F. ASSURANCES:
1. The Bidder hereby offers to furnish all labor, equipment, materials, and to perform all work, as bid, in strict accordance with all requirements of the above-named project.
2. The Bidder certifies that Bidder has read, understands, and will comply with the drug testing requirements set forth in Section 00430-B.
3. Bidder acknowledges and agrees that, if this Contract is for a Public Work subject to ORS 279C.800 to 279C.870, Bidder will comply with ORS 279C.840, as applicable.
4. Bidder certifies that all statements in the bid are true.
5. Bidder understands that this Offer shall be subject to acceptance for ninety (90) calendar days from date of opening; thereafter it may be withdrawn.
G. NON-COLLUSION: ORS 279A.010 and 279A.990 By signing and submitting a bid, Bidder certifies that:
1. Bidder has arrived at the specifics of the bid, including price and amounts, independently and without communication or agreement with another Bidder, except as disclosed in a separately attached statement;
2. The Bidder is not submitting the bid in the interest of or on behalf of any undisclosed person;
3. The Bidder has not directly or indirectly induced or solicited another Bidder in order to benefit a third person, to submit a false or sham bid, to refrain from bidding or to change a bid;
4. The Bidder has not directly or indirectly disclosed the Bidder's bid price, a breakdown of the price, the contents of the price or information or data related to the price to another Bidder;
5. The Bidder has not sought through communication or agreement with a person to fix the bid price of the Bidder or another Bidder, to fix an overhead, profit or cost element of the bid price of the Bidder or another Bidder or to secure any advantage against the contracting agency or any other person interested in the public contract;
6. The Bidder has not directly or indirectly expressed an interest or lack of interest in the public contract, or paid or offered to pay a fee to a person, to cause a collusive or sham bid;
7. The bid is genuine and not collusive or a sham.
H. ACKNOWLEDGMENTS:
1. The Bidder acknowledges that the Contract consists of the following documents: Amendment to the Proposed Contract, Bid Form, First-tier Sub-Contractor Disclosure Form, Drug Testing Program Requirements, Minimum Qualifications, Performance Bond, Payment Bond, Certificate for Payment, Accounts Affidavit, Certificate of Completion, EWEB General Provisions and Supplements, Prevailing Wage Requirements, Change Order Form, Specifications, Drawings, and Attachments.
2. The Bidder declares that he/she has carefully examined the terms of this Contract and has personally inspected and is satisfied with conditions at the Project site.
3. The Bidder hereby states that he/she shall abide by the provisions of ORS 279C.830(1) relating to
Prevailing Wages Rates.
4. A bid bond, performance bond, and payment bond are required. The Bidder encloses with this bid acceptable security in the amount of ten percent (10%) of the total amount of the bid, made payable to the Owner. The bid security shall be forfeited as liquidated damages if bid is accepted by Owner and Bidder fails to execute the Contract, provide the performance and payment bonds in the amount of 100% of the total amount of the bid, and provide the required evidence of insurance, as described below (Section 00700), within the time allowed.
5. Bidder further agrees:
a. To start work within (10) calendar days after receipt from the Owner of Notice to Proceed; to prosecute the work with diligence to its completion as follows:
Substantial Completion – December 1, 2026 Final Completion – December 15, 2026
b. To pay to the Owner as liquidated damages the amounts detailed in Section 00800, Item SGC- H.1.
c. To accept as full payment for the Lump Sum and Unit Price Work, the amounts computed in the Bid Schedule below. For Unit Price Work, Bidder agrees that the unit price represents a true measure of the labor, materials, and services required to furnish and install the item, including all allowances for overhead and profit. Items bid on a “Lump Sum” basis shall result in a complete structure or system in satisfactory working condition in respect to functionality of the installation. Where work is required but does not appear as a separate item in the bid schedule, the cost for that work shall be included and absorbed in the prices listed in the bid schedule.
Bid Table
Item
Description Unit* Estimated Quantity
Unit Price Extended Price
1 Mobilization, Bonds, Insurance and Demobilization
LS ----- ----- $
2 Over excavation CY 20 $ $
3 16-Inch Diameter Ductile Iron Pipe LF 150 $ $
4 16-Inch Diameter Butterfly Valves EA 3 $ $
5 Fire Hydrant Assembly (1) EA 1 $ $
6 24-Inch Jacked and Bored Steel Casing, 0.375-Inch Minimum Thickness
LF 100 $ $
7 Bore Pit Excavation and Shoring LS ----- ----- $
8 Curb and Gutter LF 15 $ $
9 4-Inch Thick Sidewalk SF 25 $ $
10 Temporary Asphalt Restoration SY 220 $ $
11 Erosion Control and Protective Tree Fencing
LS ----- ----- $
12 Traffic Control LS ----- ----- $
13 As-Built Survey, Documentation and Drawings
LS ----- ----- $
Bid Table Total (Sum of extended price for Line Items 1-13)
6. EWEB is an Equal Employment Opportunity and Affirmative Action employer and requires
Contractors and their sub-contractors to follow EEO/AA practices in their performance of this Contract.
7. MWESB STATUS: EWEB encourages contracting with minority owned, woman owned, and emerging small businesses (MWESB). The State of Oregon offers a certification process. Indicate below if your business is a MWESB and if so, which categories have been state certified.
MWESB Certified? (Indicate Yes or No) _______
If yes, please indicate which of the following applies: ______________________________
Minority Owned, Woman Owned, Emerging Small Business, or Veteran Owned
8. Bidder’s Project Manager – Contact Information
Name:
Email:
Phone:
9. Staff Member in charge of bid response – Contact Information
Name:
Email:
Phone:
If awarded, the Contractor represents and warrants to the Owner that Contractor has the power and authority to enter into and perform this Contract, and that this Contract, when executed and delivered, shall be a valid and binding obligation of Contractor, enforceable in accordance with its terms. Contractor further warrants that the work of this Contract shall be performed in good and workmanlike manner, and that Contractor shall, at all times, be qualified, competent and current with any necessary licenses to perform work set forth in this Contract.
EUGENE WATER & ELECTRIC BOARD CONTRACTOR
Contract Administrator – Alicia Robe Company Name
Supervisor – Chris Irvin Signed
Manager – Mike Masters Name and Title (Print or Type)
ET (if required) – Karen Kelley Office Address
Purchasing Supervisor – Quentin Furrow Office Phone
Date Signed and Executed Date Signed
End of Section 00400
Annual Erosion Prevention Permit
Narrative Construction Site Management Plan 2026
Issued pursuant to City of Eugene Administrative Order No. 58-03-01-F
Issued To: Date Assigned: 12-18-2026 Eugene Water and Electric Board
Primary Contacts:
Tessa Biboux/ Kyle Hengler 4200 Roosevelt Blvd Eugene, OR 97402
City of Eugene Permit No: 25-08557-01
Activities Covered by the Annual Permit:
An annual permit may be issued for minor recurring activities. The annual permit is intended to provide a streamlined permit process for entities that perform repetitive activities such as routine maintenance of facilities on a frequent basis. This provision allows one permit to be issued for more than one project within a calendar year. To qualify for an annual permit, the following criteria shall be met per Administrative Order:
3.3.1 Construction activities are minor and recur on a frequent basis. Examples include, but are not limited to: utility service connections and extensions, repair of utility and infrastructure facilities, maintaining capacity of storm drainage facilities, etc.
City of Eugene Administrative Order No. 58-03-01-F and Sections 2.019 and 6.645 of the City of Eugene Code restrict the discharge of sediments or other construction related materials, including hazardous substances, into the City’s stormwater system and require all construction related activity to meet the Outcome requirements of Section R-6.645-D of the Administrative Order.
Activities Not Covered by Annual Permit:
This permit does not authorize the construction of new infrastructure or facilities. This permit does not authorize in-water work or work in riparian areas regulated by the Federal Clean Water Act Section 404 permit program. These types of activities are regulated by the Oregon Department of State Lands, U.S.
Army Corp of Engineers, and the Department of Environmental Quality (DEQ) Section 401 certification program. Unless specifically authorized by this permit, by another National Pollutant Discharge Elimination System (NPDES) or Water Pollution Control Facilities (WPCF) permit, or by Oregon Administrative Rule (OAR), any other direct or indirect discharge to waters of the state is prohibited, including discharges to an underground injection control (UIC) system.
CEWMKPT
Text Box C.S.M.P. Review Complete Review and concurrence of this plan does not insure compliance with Local Regulations. All soil disturbing activity must comply with Sections 6.625 to 6.645 of the Eugene Code.
01/14/2026 Staff Date
CEWMKPT
Text Box K Trimble
CEWMKPT
Job Site Copy
JOB SITE COPY
2026 [EWEB] Annual Erosion Prevention Permit # 25-08557-01
City of Eugene | Public Works | Engineering | Erosion Prevention | 99 West 10th Avenue | Eugene, OR 97401 Phone: (541) 682-8498 E-mail: erosioninfo@eugene-or.gov
Page | 2
Other Permits May Be Required:
Construction activities within the City of Eugene are required to obtain an individual commercial erosion prevention permit when:
1. The area of disturbance is greater than 500 square feet of land at any one time and the project is located within a sensitive area as defined by RD-6.645-E-1.
2. The project results in the excavation and/or import of more than 5,000 cubic feet (185 cubic yards) of soil/material.
3. The project disturbs one acre or more.
4. Constructing new infrastructure or facilities and meets any of the above requirements.
• For projects over one acre of soil disturbance, and being constructed by a public agency, on agency-controlled land (including City of Eugene rights-of-way), plans must be submitted directly to the DEQ for a 1200CA permit through DEQ’s online permit portal, Your DEQ Online (YDO). In addition to DEQ 1200CA permit coverage, a separate City of Eugene Commercial Erosion Permit application must be obtained to ensure compliance with City of Eugene erosion program requirements.
• A DEQ 1200-CN Construction Stormwater General permit packet is issued along with the City Commercial Erosion Prevention Permit for sites greater than one acre but less than five, and that are being constructed by a private entity on non-agency-controlled land.
• For private construction projects disturbing five or more acres, a City (agent) issued DEQ 1200-C Construction Stormwater Permit is required.
• For projects with over one acre of disturbance, an Erosion and Sediment Control Plan must be prepared by a certified professional.
• Individual commercial erosion permits require additional review time, and an on-site pre-construction meeting with a City Erosion Prevention Specialist, as well as additional permit fees.
Permit Holder Requirements:
Measures necessary to meet the outcomes of the program per R-6.645-D of the Administrative Order will be required on all projects covered by the Annual Erosion Prevention Permit. Authorized project work varies in size and location but is generally approached as outlined below.
General Requirements for all projects:
• Prior to the start of construction activity, all work sites will be inspected by the applicant to anticipate impacts the project might have on stormwater quality.
• Prior to starting any ground disturbing activity, the applicant shall determine and install the appropriate erosion prevention and sediment control measures necessary to prevent impacts to the public stormwater system, related natural resources, adjacent properties, and the public Right-of-Way.
o The erosion control measures will be used to ensure that sediment and sediment-laden water do not leave the project site or violate applicable water quality standards.
• At a minimum, the following measures shall be installed at all construction sites covered under the Annual Erosion Prevention Permit:
o Stormwater inlet protection shall be installed prior to beginning any construction work.
▪ Inlet protection devices shall have overflow capability and be maintained in good repair during the entire project.
▪ Inlet protection is to be removed only after the construction site has been permanently stabilized.
o Concrete saw cutting and concrete pouring will occur in a manner such that no concrete washout, saw-cutting slurry or other cementitious material is allowed to enter the public stormwater system, natural resources or adjacent properties. All residual (wet or dry) concrete and cementitious material shall be swept up from street, sidewalks, etc.
following finishing work.
▪ Concrete wash-out facilities shall be utilized at every pour site to contain all washout water and all waste materials should be disposed of properly off-site.
mailto:erosioninfo@eugene-or.gov
City of Eugene | Public Works | Engineering | Erosion Prevention | 99 West 10th Avenue | Eugene, OR 97401
Page | 3
▪ Extra care must be taken if pouring concrete during/just prior to forecasted rain events. Fresh/green concrete must not come in contact with stormwater -generally within 18 hours of pouring.
o Protect exposed soils and stockpiles from precipitation and provide temporary and permanent stabilization to exposed soils at end of day and end of project.
o A supply of materials necessary to meet the outcomes and implement the construction site management plan or other best management erosion control practices under all weather conditions shall be available on site.
Additional measures may be required during construction as the site changes, and for unexpected storm events to ensure that sediment and sediment-laden water do not leave the construction site.
• During the official Wet Weather Season (October 15 – April 30th) additional requirements apply.
See “Wet Weather Requirements” below.
• The applicant is responsible for removing all structural measures deployed at the project site, following permanent stabilization.
• All construction within the public Right-of-Way shall conform to the City of Eugene Standard Specifications, as amended.
• Hazardous substances, such as paints, thinners, fuel, oil and other chemicals shall not be released onto the site, adjacent properties, or into water features, the City’s stormwater system, or related natural resources.
▪ Hazardous materials spill kits should be kept on every project site to manage and contain any fluid spills.
• No discharge is permitted into the City’s stormwater system or related natural resources of construction-related contaminants resulting from activities such as, but not limited to, concrete sawing, cleaning, or washing of equipment, tools, or vehicles.
• The applicant shall remove any sediment, gravel mud and/or debris associated with their construction activities that have accumulated on the street, in catch basin sumps and/or storm drain lines, by the end of the workday. If construction is occurring during the wet-weather season (October 15 – April 30), removal must be done immediately.
• Construction debris and garbage will be disposed of properly at the end of every workday.
• All streets, sidewalks and bike paths in the work area shall be swept clean of soil, gravel and other debris at the end of each workday.
• Finally, the applicant shall conduct one annual erosion prevention training for field staff on the requirements of the Annual Erosion Prevention Permit. City Erosion Prevention staff are available to assist with this free training if requested.
Wet Weather Season Requirements (October 15 to April 30):
During wet weather season additional BMPs shall be installed to ensure that all outcomes are being met.
• Temporary stabilization measures are required to ensure that sediment and sediment-laden water do not enter roadways, drainage systems, storm systems, or rivers, in violation of applicable water quality standards. All exposed soils and stockpiles must be covered at the end of shift every day.
• All sediment and debris in the public right-of-way shall be cleaned-up/swept immediately and not left to be tracked or washed into the city stormwater system.
• Permanent stabilization of all exposed soils during the wet weather period shall occur within 24 hours of final grade.
City of Eugene | Public Works | Engineering | Erosion Prevention | 99 West 10th Avenue | Eugene, OR 97401
Page | 4
Temporary Stabilization Requirements:
• All exposed soils and slopes shall be covered a minimum of one day before expected rain events (e.g. a 30% or greater chance or precipitation in the next 24 hours).
• During wet weather season, exposed soils shall be stabilized at the end of each workday.
• Temporarily stabilize exposed soils and slopes in active work areas every 14 days, or more frequently if needed or directed.
• Temporary stabilization measures for unfinished earthwork scheduled for re-disturbance at a later date include, but are not limited to:
o Straw mulch, compost mulch, plastic sheeting, matting, chemical soil stabilization, etc.
o If using seeding for temporary stabilization, vegetation must achieve 70% or greater ground surface coverage with live plants.
Permanent Stabilization Requirements:
• Incorporate permanent erosion control features into the project site at the earliest practical time.
Immediately perform permanent stabilization at each completed excavation and embankment area upon reaching finish grade within 14 days of reaching finished grade. Final stabilization methods include, but are not limited to:
o Seeded mulch: Sites with exposed soil or slopes less than 1v:3h – Apply seeded organic/compost mulch per standard specifications 280.44(f) o Seeded mulch and matting. Sites with slopes steeper than 1v:3h – Apply seed and mulch then apply a biodegradable fabric matting to slope in accordance to manufacture specifications or refer to RD1055 – Matting and Sub-Sec.280.42(c) of the Standard Specifications.
o Compost or bark mulch
• Remove all temporary erosion prevention and sediment control measures. Sweep up and properly dispose of accumulated silt and sediment.
• Clean-out any stormwater catch-basins impacted by the construction activities (e.g. use a vactor truck to clean the sump and associated storm drain lines).
• Sweep or vacuum all sidewalks, bike paths and streets to remove all gravel, soil and other construction materials from the hard surface.
Dewatering Requirements:
Extracted groundwater from excavated areas and building foundations is a major source of sediment-laden water impacts to the city’s stormwater system.
• All sediment laden water must be treated to remove all sediment and tested to ensure that the discharge meets DEQ discharge requirements before being discharged to the public stormwater system, open drainage ditch, stream, ditches or wetlands.
• Active treatment dewatering systems using flocculent must be reviewed and approved by City of Eugene Erosion Prevention Program staff prior to operation.
o If the extracted water cannot be filtered/treated to meet DEQ discharge requirements, the water must either be “land-applied” or hauled off-site to a suitable disposal site.
o Land application must be to a vegetated area large enough to allow infiltration and/or filtering of the sediment laden water so that no sediment-laden water leaves the site or enters the city’s stormwater system.
o The property owner’s permission must be obtained prior to land-application of the extracted water.
• Dewatering ‘filter bags’ are effective at removing coarse material and strongly encouraged to be one of the treatment measures available at every construction site where dewatering is anticipated.
• If the permit holder encounters groundwater that is suspected to contain contaminants other than sediment, they should notify the City and contact the local DEQ office to determine disposal options. Only with DEQ authorization can this water be discharged to the stormwater system or surface waters of the State.
City of Eugene | Public Works | Engineering | Erosion Prevention | 99 West 10th Avenue | Eugene, OR 97401
Page | 5
City of Eugene (Erosion Prevention) Responsibilities
• Conduct (or assist permit holder in conducting) Annual Erosion Prevention Permit training.
• Consult, assist and/or provide program guidance to applicants and permit holders.
Definitions:
Active Treatment Dewatering Systems: Any dewatering system that utilizes any chemical treatment (flocculants) to remove sediment from the water prior to discharge to stormwater systems or Surface Waters of the State.
Best Management Practices (BMPs): Physical, structural, and /or managerial practices employed to avoid or mitigate erosion, sedimentation, or contamination of the City’s stormwater system and related natural resources areas, or to otherwise meet the requirements of the Erosion Prevention and Construction Site Management program.
Certified Professional: A person with a background or training in erosion prevention techniques and who holds a license or certification to practice in Oregon in one of the following professions: engineering, architecture, landscape architecture, geology, or a similar profession as determined by the City Manager;
or a person who is certified as a professional in erosion and sedimentation control by the International Erosion Control Association, or any other similar organization, or by the City, as determined by the City Manager.
City’s stormwater system: Those stormwater facilities located on City-owned property, public rights-of-way, public easements and any stormwater facility the City is contractually or legally obligated to operate and maintain, including but not limited to:
(a) An open drainage way, headwater stream, creek, wetland, spring, or pond, including those not maintained by the City, which drain onto City-owned property or into City maintained facilities;
(b) A pipe or sewer and its related appurtenances that carry stormwater and have been designed and constructed expressly for use by the general public and accepted by the city;
(c) Streets, curbs and gutters and other surfaces in the public way which are designed to carry stormwater, roadside drainage ditches along unimproved city streets except access drive culverts; and
(d) Flood control and stormwater quality facilities (levees, dikes, overflow channels, swales, bio-filtration facilities, infiltration facilities, detention basins, retention basins, dams, pump stations, groundwater recharging basins, sediment traps, wetlands, etc.) that have been designed and constructed expressly for use by the general public and accepted by the city.
Natural resource area: An area located within or adjacent to the City’s stormwater system, such as waterways, wetlands, conservation zones or easements, and riparian areas, which due to their location, topography, vegetation, or other factors provide one or more of the following stormwater functions: flood control, habitat, stream bank stabilization, and water quality treatment including pollutant removal, shading and temperature stabilization.
Permanent stabilization: Long-term treatment of excavated or /graded areas such as establishment of grass or other vegetative cover sufficient to hold soils in place during normal wet weather conditions, application of heavy organic mulch (applied 2”- 4” thick), rock aggregate or gravel (applied approximately 2” inches thick or more), paving, or other treatment as approved.
Routine maintenance: Activities and practices that are necessary to maintain the operating capacity, functional integrity, or aesthetics of a place or facility. Routine maintenance includes, but is not limited to, landscaping, repair of recreation facilities (e.g. ball diamonds, play area and fields), cleaning of stormwater facilities, and patching of streets.
Sedimentation: The deposit or mud, sand, soil, sediment or construction material exceeding one half cubic foot in volume for every 1,000 square feet of lot size onto adjacent properties, into the City’s stormwater system, onto Related Natural Resource Areas located on-site, into public rights of way or private streets, and/or into any private stormwater system that discharges into a City stormwater system
City of Eugene | Public Works | Engineering | Erosion Prevention | 99 West 10th Avenue | Eugene, OR 97401
Page | 6 located off-site by dropping, discharging, directly depositing, or resulting from the action of erosion.
Sensitive area: Sensitive areas include any of the following:
• Slopes within the area of disturbance which are greater than 10%
• Areas that have soils that are highly erodible:
o E.g. a soil erodibility index of 8 or greater
• Areas adjacent to, or have the potential to directly drain to, a drainage ditch, open waterway, wetland, stream or their designated buffer areas.
Stormwater impacts: A discharge of any material other than clean, clear water to the City stormwater system, surface waterways, wetlands or other natural resource area or designated buffer area.
Temporary stabilization: Short-term coverage of exposed soils. Cover materials include: straw mulch, compost mulch, sod, plastic sheeting etc., when applied according to the City of Eugene Standard Specifications. Seeded areas shall achieve a live plant cover of 70% or more.
Permanent stabilization: Permanently stabilize exposed soil surfaces at finished grade. Permanent stabilization methods include, but are not limited to seeding, mulching, and vegetative stabilization.
Seeded areas shall achieve a live plant ground cover of 90% or more.
Wet weather season: The period from October 15 through April 30, unless otherwise designated by the City Engineer. During wet weather season additional BMPs are required to ensure that all Erosion Prevention Program Outcomes are met.
Erosion Prevention Program Staff Contact Information:
2026 Primary Contact:
• Kyle Trimble, CESCL – Erosion Prevention Specialist
(541) 501-0357 Email: KTrimble@eugene-or.gov
2026 Secondary Contact:
• Ed Fredette, CESCL – Erosion Prevention Specialist
(541) 501-0358 Email: EFredette@eugene-or.gov
2026 Tertiary Contact:
• Kelli Scott, CESCL – Erosion Prevention Specialist
(541) 556-3275 Email: KScott@eugene-or.gov
Additional Information:
• Erosion Prevention Program website: www.eugene-or.gov/erosion
• City of Eugene Standard Specifications for Construction:
https://www.eugene-or.gov/444/Standard-Specifications-for-Construction See section 00280 for Erosion Prevention specifications and Standard Drawings RD1000 to RD1070.
mailto:KTrimble@eugene-or.gov mailto:EFredette@eugene-or.gov mailto:KScott@eugene-or.gov http://www.eugene-or.gov/erosion https://www.eugene-or.gov/444/Standard-Specifications-for-Construction
Subcontractors List before: 4:00 p.m. (PST) -- Thursday, August 13, 2026
File details come from the government source that posted it. Updated .