Addendum No. 1.pdf

PDF 146 KB Posted

Attached to
RFP Landscape Maintenance Services
Solicitation number
P26-011
Issued by
El Dorado County, California

About this file

This Addendum No. 1 is issued by the El Dorado Irrigation District in California for RFP P26-011-RD concerning the removal and disposal of excavated construction spoils from Reservoir 10. The project involves the transport and disposal of approximately 2,100 cubic yards of non-hazardous construction spoils, with the District providing loading services while the contractor is responsible for hauling, safety compliance, licensing, and regulatory adherence. The proposal due date has been revised to September 11, 2026, at 3:00 p.m. local time, representing a change from the original deadline specified in the initial RFP.

The District has received multiple questions from potential proposers and anticipates issuing Addendum No. 2 on or around August 21, 2026, following the completion of additional materials testing. This second addendum will address the inquiries received and provide responses based on testing results. All addenda issued shall be incorporated into the proposal and contract documents as binding components.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP P26-011-RD

ADDENDUM NO. 1

Excavated Construction Spoils Removal and Disposal

AUGUST 14, 2026

To: All Potential Proposers

THIS IS AN ADDENDUM TO WHICH SPECIAL ATTENTION SHOULD BE GIVEN IN

ORDER TO PRESERVE THE VALIDITY OF ANY PROPOSAL SUBMITTED PURSUANT

TO THE ABOVE REQUEST FOR PROPOSALS. THE RFP IS REVISED, MODIFIED,

AND CLARIFIED AS FOLLOWS:

Item 1:

The proposal due date and time has been changed. The new date and time are as follows:

Due Date: September 11, 2026 Due Time: 3:00 p.m. Local Time

Item 2:

The District received several questions which will be addressed in a future addendum. Additional materials testing is required prior to publishing responses to questions received. The District anticipates posting addendum 2 on or around August 21st subject to the availability of testing results.

THIS ADDENDUM AND ALL OTHERS ISSUED SHALL BE PART OF THE PROPOSAL

AND CONTRACT DOCUMENTS.

8-14-2026

Ryan Deakyne, Senior Buyer El Dorado Irrigation Dist. Date

Attachments: NA

END OF ADDENDUM NO. 1

File details come from the government source that posted it. Updated .