Addendum No. 1.pdf
PDF 146 KB Posted
- Attached to
- RFP Landscape Maintenance Services
- Solicitation number
- P26-011
- Issued by
- El Dorado County, California
About this file
This Addendum No. 1 is issued by the El Dorado Irrigation District in California for RFP P26-011-RD concerning the removal and disposal of excavated construction spoils from Reservoir 10. The project involves the transport and disposal of approximately 2,100 cubic yards of non-hazardous construction spoils, with the District providing loading services while the contractor is responsible for hauling, safety compliance, licensing, and regulatory adherence. The proposal due date has been revised to September 11, 2026, at 3:00 p.m. local time, representing a change from the original deadline specified in the initial RFP.
The District has received multiple questions from potential proposers and anticipates issuing Addendum No. 2 on or around August 21, 2026, following the completion of additional materials testing. This second addendum will address the inquiries received and provide responses based on testing results. All addenda issued shall be incorporated into the proposal and contract documents as binding components.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP P26-011-RD
ADDENDUM NO. 1
Excavated Construction Spoils Removal and Disposal
AUGUST 14, 2026
To: All Potential Proposers
THIS IS AN ADDENDUM TO WHICH SPECIAL ATTENTION SHOULD BE GIVEN IN
ORDER TO PRESERVE THE VALIDITY OF ANY PROPOSAL SUBMITTED PURSUANT
TO THE ABOVE REQUEST FOR PROPOSALS. THE RFP IS REVISED, MODIFIED,
AND CLARIFIED AS FOLLOWS:
Item 1:
The proposal due date and time has been changed. The new date and time are as follows:
Due Date: September 11, 2026 Due Time: 3:00 p.m. Local Time
Item 2:
The District received several questions which will be addressed in a future addendum. Additional materials testing is required prior to publishing responses to questions received. The District anticipates posting addendum 2 on or around August 21st subject to the availability of testing results.
THIS ADDENDUM AND ALL OTHERS ISSUED SHALL BE PART OF THE PROPOSAL
AND CONTRACT DOCUMENTS.
8-14-2026
Ryan Deakyne, Senior Buyer El Dorado Irrigation Dist. Date
Attachments: NA
END OF ADDENDUM NO. 1