This document is Addendum No. 1 to Contract No. V-WAL-24007-C issued by the Maryland Department of Transportation (MDOT) Motor Vehicle Administration (MVA) for a roof replacement project at the MDOT MVA Waldorf Branch office location. The addendum modifies the original specifications, including updating the Invitation for Bid (IFB) document with attachments, rescheduling the pre-bid conference and mandatory site visit to June 29, 2023, and changing the deadline for questions to June 30, 2023. All bidders must acknowledge receipt of this addendum.

The project involves the replacement of the existing low-slope roofing systems on Roof #1 and the repair and installation of a new roofing system on Roof #2 at the MDOT MVA Waldorf Branch in Charles County, Maryland. The contract is open to all qualified bidders, and the project location is in the Walker Mill Census Designated Place (CDP).

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum No. 1 Contract No. V-WAL-24007-C

ADDENDUM NO. 1

MOTOR VEHICLE ADMINISTRATION (MVA)

CONTRACT NO. V-WAL-24007-C

Roof Replacement at MDOT MVA Waldorf Branch

June 26, 2023

This Addendum is hereby made part of the contract specifications on which the Contractor shall bid, and is issued to modify, explain or correct the original specifications. All bidders shall acknowledge receipt of this Addendum on the Acknowledgement of Receipt form. It is understood that all bids submitted in response to V-WAL-24007-C, will be presumed to be based upon full knowledge of the contents of Addendum No. 1.

1. Updated IFB document with attachments.

Please see the updated IFB document and attachments posted on eMMA in Round (3) three.

2. Pre-Bid Conference/ Mandatory site visit rescheduled to June 29, 2023.

3. Questions Due Date changed to June 30, 2023.

***END OF ADDENDUM NO. 1***

Addendum No. 1 Contract No. V-WAL-24007-C

ADDENDUM NO. 1

MOTOR VEHICLE ADMINISTRATION (MVA)

CONTRACT NO. V-WAL-24007-C

Roof Replacement at MDOT MVA Waldorf Branch

ACKNOWLEDGEMENT OF RECEIPT

The undersigned acknowledges that Addendum No. 1 dated June 26, 2023, to Maryland Motor Vehicle Administration Specifications for Contract No. V-WAL-24007-C has been received by the undersigned and will be incorporated into all copies of said specifications in the possession of the undersigned.

It is understood that all bids submitted in response to V-WAL-24007-C will be presumed to be based upon full knowledge of the contents of Addendum No. 1.

(Company Name)

By:

(Signature-Authorized Official)

(Title)

(Date)

NOTE: PLEASE SIGN AND DATE THE “ACKNOWLEDGEMENT OF

RECEIPT” AND RETURN TO THE PROCUREMENT OFFICER WITH

YOUR BID SUBMISSION

This Addendum is hereby made part of the contract specifications on which the Contractor shall bid, and is issued to modify, explain or correct the original specifications. All bidders shall acknowledge receipt of this Addendum on the Acknowledgement...
ACKNOWLEDGEMENT OF RECEIPT

File details come from the government source that posted it. Updated .