ADDENDUM NO 2 ARFQ DEP27-08 Brushy Meadow Creek Highwall B locked lw091026.pdf
PDF 94 KB Posted
- Attached to
- AML - Brushy Meadow Creek Highwall B
- Solicitation number
- ARFQ 0313 DEP2700000008 4
- Issued by
- West Virginia
About this file
This is Addendum No. 2 to an Area Request for Quote (ARFQ) issued by the State of West Virginia for the Brushy Meadow Creek Highwall B project, an Appalachian Regional Commission (ARC) Mine Land Reclamation (AML) initiative. The project involves reclamation work at a specific highwall site in West Virginia. The addendum modifies the original solicitation terms and requirements for interested bidders. Specific details regarding the scope of work, project location, deliverables, and timeline modifications are contained within this addendum document, which serves to clarify, correct, or expand upon information provided in the original ARFQ and related exhibits.
The addendum addresses changes to the original solicitation that bidders must incorporate into their proposals and cost estimates. Prospective bidders are required to acknowledge receipt of this addendum in their submissions to ensure compliance with the current solicitation requirements. All bid responses must reflect the modifications outlined in this addendum along with the original ARFQ documents to be considered responsive and eligible for award consideration by the State of West Virginia.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AGENCY SOLICITATION NUMBER – ARFQ ______________
Addendum Number: ____
The Purpose of this addendum is to modify the solicitation identified as (“Agency Solicitation”) to reflect the change(s) identified and described below.
Applicable Addendum Category:
[ ] Modify bid opening date and time
[ ] Modify specification of product or service being sought
[ ] Attachment of vendor questions and responses
[ ] Attachment of pre-bid sign-in sheet
[ ] Correction of error
[ ] Other
Description of Modification to Solicitation:
This Addendum issued to publish and distribute the attached documentation to the vendor community.
Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.
Terms and Conditions:
1. All provision of the Agency Solicitation and other addenda not modified herein shall remain in full force and effect.
2. Vendor should acknowledge receipt of all addenda issued for this Agency Solicitation by completing an Addendum Acknowledgement, a copy of which is included herewith. Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.
DEP2700000008
1. To modify Technical Questions due date and close date.
2. Due to incorrect GPS coordinates a 2nd non-mandatory pre-bid meeting will be held for any potential interested vendors.
ATTACHMENT A
Addendum #2 Brushy Meadow Creek Highwall B
Permit (if applicable)
ARFQ DEP 27*08
This Addendum # 2 is to schedule a 2nd (second) pre-bid meeting on Tuesday, Sept 22, 2026 at 10:00am and to publish revised Directions to the site for the pre-bid meeting that was held on September 2, 2026 and also to change Tech Question Deadline to Sept 29 at 4pm and Bid Close Date to Oct 6 at 10:30am.
CLARIFICATIONS, NOTES, AND CHANGES
Due to incorrect coordinates provided in the specifications and terms and conditions, DEP AML will hold a second pre-bid meeting on Tuesday, September 22, 2026, at 10:00 AM Eastern.
Attendance requirements for vendors:
� Attended the First Meeting (09/02/2026): Attendance at this second meeting is optional. You may attend if you wish, but it is not required.
� Did NOT Attend the First Meeting: Attendance at this second pre-bid meeting is mandatory.
All attending vendors must follow the provided DRIVING DIRECTIONS to reach the location.
On Site- Tuesday, September 22, 2026 at 10:00 a.m.
From Charleston:
Merge onto I-64 W/I-77 S from MacCorkle Ave SE. Follow I-64 E/I-77 S to WV-612 E in Fayette County. Take Exit 60 from I-64 E/I77 S (34.6 Miles). Follow WV-612 E to US-19N (8.4 miles).Turn left onto US-19N (31.7 miles). Take WV-39 E Canvas Nettie Rd and WV- 20 S to Railroad Grade Rd in Leivasy (20 miles). Continue onto Railroad Grade Rd. (2.5 mi). Arrive at East end of project vicinity.
The GPS location of the project is as follows: 38° 7' 42.96" N 80° 39' 24.84" W
8;;<E;LD 8:BEFNC<;><D<EK =FID
JFC@:@K8K@FE EF)5
@afgehVg\baf5 G_XTfX TV^abj_XWZX eXVX\cg bY T__ TWWXaWT \ffhXW j\g[ g[\f fb_\V\gTg\ba Ul Vb`c_Xg\aZ g[\f TWWXaWh` TV^abj_XWZ`Xag Ybe`) :[XV^ g[X Ubk aXkg gb XTV[ TWWXaWh` eXVX\iXW TaW f\Za UX_bj) =T\_heX gb TV^abj_XWZX TWWXaWT `Tl eXfh_g \a U\W W\fdhT_\Y\VTg\ba)
8V^abj_XWZ`Xag5 @ [XeXUl TV^abj_XWZX eXVX\cg bY g[X Yb__bj\aZ TWWXaWT TaW [TiX `TWX g[X aXVXffTel eXi\f\baf gb `l cebcbfT_' c_Taf TaW*be fcXV\Y\VTg\ba' XgV)
8WWXaWh` Eh`UXef IXVX\iXW5 (Check the box next to each addendum received)
Q R 8WWXaWh` Eb) , Q R 8WWXaWh` Eb) 1 Q R 8WWXaWh` Eb) - Q R 8WWXaWh` Eb) 2 Q R 8WWXaWh` Eb) . Q R 8WWXaWh` Eb) 3 Q R 8WWXaWh` Eb) / Q R 8WWXaWh` Eb) 4 Q R 8WWXaWh` Eb) 0 Q R 8WWXaWh` Eb) ,+
@ haWXefgTaW g[Tg YT\_heX gb VbaY\e` g[X eXVX\cg bY TWWXaWT `Tl UX VThfX Ybe eX]XVg\ba bY g[\f U\W) @ Yheg[Xe haWXefgTaW g[Tg Tal iXeUT_ eXceXfXagTg\ba `TWX be Tffh`XW gb UX `TWX Whe\aZ Tal beT_ W\fVhff\ba [X_W UXgjXXa MXaWberf eXceXfXagTg\iXf TaW Tal fgTgX cXefbaaX_ \f abg U\aW\aZ) Fa_l g[X \aYbe`Tg\ba \ffhXW \a je\g\aZ TaW TWWXW gb g[X fcXV\Y\VTg\baf Ul Ta bYY\V\T_ TWWXaWh` \f U\aW\aZ)
:b`cTal
8hg[be\mXW J\ZaTgheX
;TgX
EFK<5 K[\f TWWXaWh` TV^abj_XWZX`Xag f[bh_W UX fhU`\ggXW j\g[ g[X U\W gb XkcXW\gX WbVh`Xag cebVXff\aZ)
ARFQ DEP2700000008
File details come from the government source that posted it. Updated .