ADDENDUM NO 2 ARFQ DEP2600000065 Upland Run (Harrison) AMD.pdf
PDF 2 MB Posted
- Attached to
- AML - Upland Run (Harrison) AMD
- Solicitation number
- ARFQ 0313 DEP2600000065 3
- Issued by
- Hampshire County, West Virginia
About this file
File Summary
This is Addendum No. 2 to a Request for Quotation (ARFQ DEP2600000065) issued by the West Virginia Department of Environmental Protection (WVDEP) Division of Land Restoration, Office of Abandoned Mine Lands and Reclamation for the Upland Run (Harrison) Abandoned Mine Drainage (AMD) project located northeast of Weston in Lewis County, West Virginia. The project involves installing above-grade drainage channels and a below-grade stormwater system to divert water away from affected properties and prevent flooding and structural damage. A pre-bid conference was conducted on-site on January 13, 2026. The addendum publishes the results of that conference, including clarifications on critical project requirements such as the prohibition on burning, stacking, or windrowing materials onsite; the requirement to remove all felled trees and stumps; confirmation that all subsurface drainage pipes shall be a minimum of 8 inches in diameter (revised from 4 inches); and confirmation that the contractor is responsible for brush pile and equipment removal if the property owner does not complete removal prior to construction. The addendum addresses nine additional questions regarding tree removal, survey plans, material usage restrictions, site access, and equipment coordination with the landowner.
The specifications detail comprehensive scope requirements including mobilization and demobilization, construction layout and surveying, quality control testing, site preparation with clearing and grubbing, erosion and sediment control, drainage structure installation, unclassified excavation, traffic control, and revegetation. The contractor must assume responsibility as Co-Applicant #1 under the NPDES Construction Storm Water General Permit (WV0115924) and complete required signature pages before a Notice to Proceed is issued. The project is federally funded through the Infrastructure Investment and Jobs Act and subject to Davis-Bacon prevailing wage requirements and Build America Buy America Act domestic content provisions. Lump sum bid caps are established at 5 percent for mobilization and demobilization, 5 percent for construction layout, 3 percent for quality control, and 10 percent for site preparation. The contractor must provide pre-construction and post-construction photographic and video documentation, as-built plans in multiple formats, and detailed inspection reports throughout construction to ensure compliance with all federal, state, and local environmental and safety regulations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AGENCY SOLICITATION NUMBER – ARFQ ______________
Addendum Number: ____
The Purpose of this addendum is to modify the solicitation identified as (“Agency Solicitation”) to reflect the change(s) identified and described below.
Applicable Addendum Category:
[ ] Modify bid closing date and time
[ ] Modify specification of product or service being sought
[ ] Attachment of vendor questions and responses
[ ] Attachment of pre-bid sign-in sheet
[ ] Correction of error
[ ] Other
Description of Modification to Solicitation:
This Addendum issued to publish and distribute the attached documentation to the vendor community.
Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.
Terms and Conditions:
1. All provision of the Agency Solicitation and other addenda not modified herein shall remain in full force and effect.
2. Vendor should acknowledge receipt of all addenda issued for this Agency Solicitation by completing an Addendum Acknowledgement, a copy of which is included herewith. Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.
Addendum #2 Upland Run (Harrison) AMD
ARFQ DEP2600000065
The following are questions that were identified at the Pre-Bid Conference (PBC) conducted on-site on January 13 2026, questions provided to the WVDEP Procurement, Project Clarifications, Project Notes, Project changes, Technical Specification Changes, and Project Plan Changes. The answers and clarifications provided herein take precedence over verbal answers at the PBC and previously provided specifications and descriptions provided in the Solicitation should there be any conflicts between the two.
QUESTIONS AND ANSWERS
N/A
PRE-BID QUESTIONS AND ANSWERS
Q1. Is burning allowed on site?
A1. No burning, stacking or windrowing is permitted onsite.
Q2. Do all materials (trees) have to be removed from the site?
A2. Yes all felled trees and stumps must be hauled offsite.
Q3. Could the ditch/channel excavation summaries be divided out by site?
A3. We do not summarize the cut/fill quantities by channel on the bid documents. The Channels are listed by Number in the Plans and the
Channel Summary Table on Sheet 41. Profiles and Cross-Sections are provided on Sheets 17-34.
Q4. Is there a bid item for the Survey Plan?
A4. The survey plan and survey activities fall under Bid Item 200.00
Construction Layout.
Q5. How are discrepancies between the plans and specifications handled? The plans have 8” pipe, the specs have 4”.
A5. Conflicts are resolved at the engineer’s discretion. In this case the plans are correct at 8” diameter, all subsurface drainage pipes will be a minimum of
8” diameter. The Specifications will be corrected and re-issued by addendum.
Q6. Are all trees withing the LOD required to be cut and removed?
A6. Yes all trees in the LOD are expected to be cut and removed from the site.
Q7. Will the existing brush piles (on Harrison by building) be cleared out before work starts?
A7. The property owner indicates this brush pile and log stack will be removed prior to construction. However, if it is not removed it will be the contractors responsibility to remove it as part of the contract.
Addendum #2
Upland Run (Harrison) AMD
ARFQ DEP2600000065
Q8. Can the existing concrete slabs (in the existing channel near county route 13) be used in the grouted rip-rap armoring of the proposed channel improvements?
A8. No this material cannot be used or mixed in with the placement of the rip-rap.
Q9. Will access from Site 1 to Site 2 be permitted (along private driveway).
A9. No direct access between these sites is provided except by County Route 13
Q10. Will equipment/tools stored around the site 2 access road loop be moved outside the LOD.
A10. Yes the equipment and material will be moved outside the LOD, however it should be noted this is an active area for the Landowner and coordination with the Landowner is expected.
REVISED SPECIFICATIONS
1. Revised pipe size for subsurface drainage pipe in toe key. Page 53, Section 8.5 Unclassified
Excavation: “A 8-in. perforated PVC pipe…“ & “8-in. solid wall PVC pipe…” changed from 4-
in. PVC pipe.
REVISED DRAWINGS
REVISED BID SCHEDULE ( Submitted separately)
PRE-BID SIGN IN SHEETS
Attached west virginia department of environmental protection
HAROLD D. WARD, CABINET SECRETARY
DIVISION OF LAND RESTORATION
OFFICE OF ABANDONED MINE LANDS AND RECLAMATION
UPLAND RUN (HARRISON) AMD
WESTON, LEWIS COUNTY, WEST VIRINGINA
January 2026
CONSTRUCTION SPECIFICATIONS
Issued for Construction
1095 Chaplin Road, Suite 200
Morgantown, WV 26501
304-985-5555 mdshultz Image
Table of Contents
Definitions
Division I – Special Provisions
I Location and Site Description ………………………………………………1
II Scope of Work ………………………………………………………………3
III Safety ……………………………………………………………………….4
IV Borrow (Disposal) Areas ……………………………………………………5
V Disposal of Unsuitable Material ……………………………………………6
VI Permits, Licenses, and Fees ………………………………………………6
VII NPDES Stormwater Requirements ………………………………………...6
VIII Construction Sign …………………………………………………………..9
Division II – Technical Specifications
1.0 Mobilization and Demobilization …………………………………………11
2.0 Construction Layout ………………………………………………………13
3.0 Quality Control ……………………………………………………………17
4.0 Site Preparation ……………………………………………………………21
5.0 Erosion and Sediment Control …………………………………………….29
6.0 Revegetation ………………………………………………………………37
7.0 Drainage Structures ……………………………………………………….41
8.0 Unclassified Excavation …………………………………………………..51
12.0 Utilities ……………………………………………………………………57
15.0 Bore Logs/Subsurface Investigation …………………………………….. 59
18.0 Administration …………………………………………………………….61
19.0 Traffic Control …………………………………………………………….63
20.0 Asphalt Paving and Misc Road Replacement ……………………………..65
Definitions
ASTM – American Society for Testing Materials, latest edition unless otherwise noted.
AASHTO – American Association of State Highway and Transportation Officials and the
Standard Specifications for Transportation Materials and Methods of Sampling and Testing by the American Association of State Highway and Transportation Officials, latest and all subsequent addenda thereto.
BABA – Build America Buy America Act, enacted as part of the Infrastructure Investment and
Jobs Act on November 15, 2021, established a domestic content procurement preference for all
Federal financial assistance obligated for infrastructure projects after May 14, 2022. The domestic content procurement preference requires that all iron, steel, manufactured products, and construction materials used in covered infrastructure projects are produced in the United States.
BIL – Bipartisan Infrastructure Law, also known as the Infrastructure Investment and Jobs Act
(IIJA), was signed into law on November 15, 2021.
Construction – The clearing, grubbing, dredging, excavating, grading of land and other activities associated with the reclamation of property once used to extract coal, oil or natural gas or operate landfills in this State.
Contractor – Refers to the successful bidder and/or firm or corporation undertaking the execution of the work under the terms of these Specifications.
Davis-Bacon and Related Acts – Contractors and subcontractors performing on federally funded or assisted contracts in excess of $2,000 for the construction, alteration, or repair (including painting and decorating) of public buildings or public works must pay their laborers and mechanics employed under the contract no less than the locally prevailing wages and fringe benefits for corresponding work on similar projects in the area. The Department of Labor determines such locally prevailing wage rates. For prime contractors in excess of $100,000, contractors and subcontractors must also, under the provisions of the Contract Work Hours and
Safety Standards Act, as amended, pay laborers and mechanics, including guards and watchmen, at least on e and one-half times their regular rate of pay for all hours worked over 40 in a workweek.
Engineer – Refers to the Dieffenbauch & Hritz Project Engineer, Project Manager, Practice
Manager or any authorized representative thereof.
Inspector – The State’s authorized representative assigned to make any or all necessary inspection of the work.
Plans – A written account of the intended future course of action aimed at achieving the specific goals and objectives of the contract within the timeframe specified in the contract. It explains in detail what needs to be done, when, how, and by whom. The plans include, but are not limited to, the approved profiles, typical cross sections, working drawings, standard drawings, and supplemental drawings, or exact reproductions thereof, which show the location, character, dimensions, and details of the work to be done.
Specifications – Refers to this document and any addenda. Whenever this document or Contract refers to the specifications of any society, institute, association or government organization, then such specifications cited shall become a part of this Contract as if written in full.
State – Used to refer to the West Viriginia Department of Environmental Protection Division of
Land Reclamation Office of Abandoned Mine Lands & Reclamation (WVDEP-DLR-AML) or their representative.
Surveyor – Refers to a WV licensed Professional Surveyor working with a certification of authorization or their representative working under their authority.
WVDOH Standard Specs - WVDOT Standard Specifications for Roads and Bridges, 2023
Edition and all subsequent addenda thereto.
IFC - Upland Run (Harrison) AMD | Construction Specifications
Division I – Special Provisions
I Location/Site Description
The project is located Northeast of the City of Weston, Lewis County, WV, off Berlin Road. The main area of concern is a large drainage channel that is capturing water from above the Harrison property and depositing at a point near their garage/outbuilding and it is scouring out an area, fills it with water, then overflows, flooding the building on the Harrison’s property. This same drainage has undermined the pumphouse for the Hicks residence and may cause the structure to fail.
During heavy rains, water overflows a DOH culvert on Berlin Road and an adjacent access road for property owners.
The purpose of this project is to install above grade drainage channels and a below grade stormwater system to divert water away from the properties and structures. The highwall and unstable areas will be reclaimed with toe key foundations and bonding benches. The contractor will be responsible to plan the repair and revised drainage conveyance. The contractor will also be responsible to plan the sequencing of their Work and access considerations such that the
Contractor can comply with these requirements, the Limits of Disturbance shown on the Plans, and all other requirements in these Specifications or in the Plans.
Directions to Site:
From the North: I-79 S Exit 105 CR 7. Turn left onto Hackers Creek Road. Travel 4.2 miles.
Turn right onto Berlin Road.
McCoy: 2.3 miles on the right, 2101 Berlin Road, Weston, WV 26452
Hicks: 2.4 miles on the right, 1959 Berlin Road, Weston, WV 26452
Warner: 2.3 miles on the left, 2010 Berlin Road, Weston, WV 26452
GPS Coordinates:
39°02’21.8”N, 80°23’28.4”W
II Scope of Work
The Work consists of furnishing all labor, plant, power, equipment, supplies, and performing all operations necessary for the completion of the project. The contractor shall perform all operations necessary for:
• Mobilization and Demobilization
• Survey and Construction Layout
• Quality Control
• Site Preparation, including Clearing and Grubbing
• Access Road Construction
• Installation and Maintenance of Erosion and Sediment (E&S) Controls
• Unclassified Excavation / Regrading / Soil Drying
• Traffic Control, where required
• Installation of Drainage Structures
• Road / Laydown Rehabilitation
• Repaving and Refinishing of Existing Paved Road, if damaged during the Work
• Soil Capping
• Revegetation
• Final Site Cleanup and Removal of E&S Controls
Specifically, the Contractor will be installing their E&S Controls, establishing their Work area and laydown area, clearing, and grading the site as needed to provide space to Work, and any other applicable Site Preparation.
Traffic Control will be implemented by the Contractor. Contractor is required to keep road(s) open at all times – and in compliance with the Traffic Control Section of these Specifications.
During the Work, the Contractor is to exercise caution in not disturbing structures or trees to remain.
Contractor is responsible for leaving the site and surrounding area in original condition or better.
This also includes picking up and disposing of any trash or litter the Work generates in accordance with these Specifications.
Contractor is responsible for engaging in soil disturbance only within the Limits of Disturbance shown on the Plans.
The Contractor shall also be responsible for surveying, including establishing construction baseline, measuring and developing all completed quantities on the job, and the ordering, purchase and delivery of any and all materials required for construction or required for development of support areas. The Contractor shall perform all other operations as incidental to the program as specified herein. The Contractor is responsible for verifying all surveying, measurements, estimates, or any other information provided by the State for accuracy.
Any deviation from the Plans or Specifications, not approved in writing by the State, Engineer, or
Contract Administrator, are at Contractor risk. The State reserves the right to require Contractor to correct back to Plans – at Contractor cost – any unapproved condition at any time.
III Safety
All regulations of the Occupational Safety and Health Act of 1970 (OSHA) are in effect for this contract. The State shall not be liable for any citations received by the Contractor as a result of failure to comply with applicable OSHA standards. Compensation is to be included in the various items of the Contract for the expense involved in complying with these standards. In addition, the Contractor shall comply with Section 107.7 of the WVDOH Standard
Specifications regarding public convenience and safety. The Contractor’s supply vehicles will travel paved and gravel roads in close proximity to local resident’s homes, business’s, driveways, and other constructions. These areas are regularly frequented by visitors and used by the resident’s everyday. As such, the safety and convenience of these people shall be of utmost importance in the Contractors execution of work as shown on the plans and herein specified.
The Contractor shall comply with OSHA Regulation 29CFR1926 Subpart P for excavation of trenches associated with pipe, culvert, subsurface drains, mine seal constructions, and similar constructions.
Contractor to implement their Work to provide a lasting, stable configuration, utilizing techniques considered conducive to slope stability. The Contractor is required to exercise care to avoid conditions which may result in unstable conditions during the construction process. The
Contractor shall be responsible for protecting residences, utilities, and any existing structures not to be removed by Plan from damage. The Contractor shall implement their Work such that it is in compliance with all Federal, State, and Local laws – this includes CFR Title 29, Subtitle B, Chapter
XVII, Part 1926, Subpart E (1926.95-1926.107 Personal Protective and Life Saving Equipment), CFR Title 29, Subtitle B, Chapter XVII, Part 1910, Subpart U (Covid-19), CFR Title 29, Subtitle
B, Chapter XVII, Part 1926, Subpart P (1926.650-1926.1443 Excavations – benching requirements of trenches and ladder requirements are of particular note), and any other Federal, State, or Local law.
The Contractor shall also protect pedestrian and vehicular traffic around excavations and trenches in compliance with the U.S. Federal Highway Administration Manual of Uniform
Traffic Control Devices and the WVDOT “Manual on Temporary Traffic Control for Street and Highways” dated May 2021, or more current. In addition, the Contractor will be required to comply with all WVDOT rules, regulations, weight limits, and speed limits associated with and posted on CR 13, and other existing access roads. The Contractor shall follow the Traffic
Control Plan in the MM-109. Should the Contractor require additional traffic control or make changes to the traffic control plan, the Contractor shall submit a Traffic Control Plan to the
WVDOH District 7 District Engineer, Brian Cooper, 131 Highland Drive, Weston, WV 26452, for approval prior to submitting said plan to the State for approval, and prior to any substantial portion of work located adjacent to or in Lewis County. Lewis County Route 13 is a narrow county road used by local residents and visitors and as such special precautions will be required while working in or in close proximity to the road and for slow moving large construction equipment or supply vehicles that may impede normal traffic patterns and controlling dust from these vehicles. At a minimum, the Traffic Control Plan shall detail how the Contractor will maintain vehicular traffic on Lewis County Route 13 and maintain access in and out of driveways and protect local residents and their children from trench excavations and other construction activities required to complete this project as specified and shown on the plans. At the discretion of the Engineer, the Contractor will be required to employ a flag person along
Lewis County Route 13 and/or other access roads to direct traffic while hauling materials on and off site and other constructions. The Traffic Control Plan will also detail the Contractor’s plan to keep Lewis County Route 13 free of fugitive dust and clean of mud and other debris from the job site deposited by construction and other vehicles entering or leaving the project area. Costs associated with development, implementation, and submittal of the Traffic Control Plan and all other requirements herein specified shall be included in the Traffic Control bid item.
IV Borrow (Disposal) Areas
All borrow (disposal) areas must be approved by the State. The Contractor shall be responsible to obtain from the property owner(s) of the borrow areas, all necessary rights of entry, including rights of entry for the State, Engineer, and others as required for inspection purposes. The said rights of entry agreement must state that the property owner(s) indemnify and hold harmless the State for
Contractor’s action for any injury or damages whatsoever resulting from the use of the property.
The Contractor also shall submit a borrow / disposal area reclamation plan for prior approval by the
State. The Contractor shall observe the following NEPA compliance schedule relative to selecting and utilizing any off-site borrow areas and / or any waste disposal areas:
• No borrow (disposal) site operations will affect a site listed in, eligible for, or proposed to be listed in the National Register of Historic Places.
• No borrow (disposal) operations will be located within one-quarter mile of any Federally listed, established, or prospective component of the National Wild and Scenic River System under 16 USC 1274 and 1276.
• Borrow (disposal) site operations will not cause a significant encroachment within the base floodplain (CE.O. 11988: Floodplain Management).
• Borrow (disposal) site operations will not be located in or affect a critical habitat of a Federally listed endangered or threatened species under 16 USC 1531, et. seq.
• No borrow (disposal) operations will occur in wetland areas which are designated by appropriate agencies.
• Borrow (disposal) site operations will be consistent with any approved plans governing ambient air quality.
• Adherence to these mitigation measures does not relieve the Contractor of the obligation or responsibility to obtain any other Federal, State, or Local approvals required to use borrow
(disposal) areas and conduct such activities.
• Documentation: Copies of borrow (disposal) site approvals and concurrences will be submitted to the State prior to the commencement of reclamation activities.
• Site Monitoring: Borrow (disposal) activities will be monitored by the State to ensure compliance with contractual requirements, applicable Federal, State, and Local laws, and any permit conditions.
Contractor shall observe the following requirements for borrow (disposal) areas within the proposed construction limits:
a. Maximum slopes shall be 2H:1V, or as approved by Engineer.
b. No highwalls created during borrow (disposal) activities shall be left exposed.
c. Erosion and sediment controls shall be required as approved by Engineer.
d. All disturbed areas shall be revegetated as per Section 6 of these specifications.
e. All exposed refuse shall be covered with a minimum 1-foot of soil cover.
f. Maximum slope length shall be 50 vertical feet.
g. Benches shall be constructed every 50 vertical feet. Benches shall have a minimum width of 15 feet and a minimum 5 percent slope to keep drainage from flowing over the slope.
h. Drainage structures shall be installed as required and as approved by Engineer.
V Disposal of Unsuitable Material
All waste areas shall be obtained in accordance with these Specifications. All unsuitable materials (wood, trash, debris, and garbage), as determined by the State, shall be wasted by the
Contractor outside the limits of work conforming to the requirements of these Specifications at the Contractor’s expense.
The Contractor shall observe the NEPA compliance schedule relative to selecting and utilizing any off-site disposal areas in accordance with these Specifications.
VI Permits, Licenses, and Fees
The Contractor shall procure all permits and licenses, pay all charges and fees, and give all notices necessary and incidental to the due and lawful prosecution of the work. A copy of the permits and receipt of payments as procured shall be furnished to the State prior to initiation of the work under this contract.
VII NPDES Stormwater Requirements
The WVDEP-AML has obtained a Construction Storm Water General Permit for this project from the WVDEP Division of Water and Waste Management (WVDEP DWWM). The registration for this reclamation project will be modified to include the Contractor as Co-Applicant #1, with the
WVDEP-AML being Co-Applicant #2. As such, the Contractor shall assume responsibility for compliance with the terms and conditions of the permit including modifications and any future correspondence such as registration renewal invoices, inspection reports, and notices of violation shall be forwarded to the Contractor. Upon award of the contract, the Contractor shall complete a
Co-Applicant #1 signature page and submit the completed form to WVDEP-AML prior to scheduling a Pre-Construction Conference.
Upon receipt of the completed form, WVDEP-AML will request the WVDEP DWWM to modify the existing NPDES registration for this project to make the Contractor the Co-Applicant #1 to the permit.
The WVDEP DWWM will notify the Contractor and WVDEP-AML when the successful transfer of registration under WV/NPDES Storm Water Construction General Permit (No. WV0115924) is completed. A Notice to Proceed will not be issued until the contractor signs the co-applicant form and submits to the Office of Abandoned Mine Lands. Once the transfer has been completed, the
WVDEP will continue to be responsible for any modification fees and annual renewal fees incurred up until the date of the final inspection of the project that occurs after completion of construction activities at the site. The Contractor shall be responsible for any and all costs associated with violations and fines assessed against the project that are a result of the Contractor’s negligence, carelessness, or failure to install permanent controls as part of the work as scheduled.
The WVDEP shall apply for a Notice of Termination (NOT) from WVDEP DWWM via the
Construction Storm Water website https://dep.wv.gov/WWE/Programs/stormwater/csw/Pages/home.aspx upon completion of construction activities at the site. The NOT shall be issued by WVDEP
DWWM upon completion of the project. The Contractor will continue to be bound by the terms and conditions of the permit until the NOT has been approved by WVDEP DWWM. Once the project is complete, the Contractor will still bear responsibility for the NPDES registration until a
NOT is received from the WVDEP DWWM.
https://dep.wv.gov/WWE/Programs/stormwater/csw/Pages/home.aspx
Co-Applicant #1 Signature Page
Co-Applicant #1: _____________________________________________
New and/or Modification of NPDES Storm Water of Construction Project Name:
BY COMPLETING AND SUBMITTING THIS APPLICATION, I HAVE REVIEWED AND UNDERSTAND AND
AGREE TO THE TERMS AND CONDITIONS OF THE GENERAL PERMIT (WV0115924) ISSUED ON
MARCH 6, 2024, WITH AN EFFECTIVE DATE OF APRIL 6, 2024, AND EXPIRATION DATE OF APRIL 5, 2029. I UNDERSTAND THAT PROVISIONS OF THE PERMIT ARE ENFORCEABLE BY LAW, VIOLATION
OF ANY TERM AND CONDITION OF THE GENERAL PERMIT AND /OR OTHER APPLICABLE LAW OR
REGULATIONS CAN LEAD TO ENFORCEMENT ACTION.
I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED AND AM FAMILIAR
WITH THE INFORMATION SUBMITTED ON THIS FORM AND ALL ATTACHMENTS AND THAT, BASED
ON MY INQUIRING OF THOSE INDIVIDUALS IMMEDIATELY RESPONSIBLE FOR OBTAINING THE
INFORMATION. THE INFORMATION SUBMITTED IS, TO THE BEST OF MY KNOWLEDGE AND BELIEF, TRUE, ACCURATE, AND COMPLETE. I AM AWARE THAT THERE ARE SIGNIFICANT PENALTIES FOR
SUBMITTING FALSE INFORMATION, INCLUDING THE POSSIBILITY OF FINE AND IMPRISONMENT.
(CO-APPLICANT #1 SIGNATURE) DATE
Print Name: ___________________________________________
Print Title: ___________________________________________
Address: ___________________________________________
City: _____________________State: _______ Zip:___________
Telephone Number: (_____ )________-____________________
Email: ______________________________________________
FEIN: ______________________________________________
VIII Construction Sign
The work to be performed under this Section consists of providing all labor, material, and equipment necessary to install a project sign as indicated on the detail included herein and as specified herein.
Sign face shall be 3/4" thick Marine Exterior plywood or aluminum or composite material. Posts and cross-brace shall be No. 2 Grade Pine or Fir: kiln dried and pressure treated.
All hardware shall be manufactured from good, commercial-quality material and meet all applicable ASTM standards. Spikes and nails shall be common wire-type and shall meet AISI steel specifications 1010 or 1020. All hardware shall be hot-dip galvanized in accordance with
ASTM A-153.
The sign face shall be cut to the dimensions shown on the detail herein. The sign shall be painted with one (1) coat of primer and two (2) coats of white enamel. All exterior cut edges shall be smooth sanded, prior to painting. All edges shall be double primed. The letters, border, and strips shall be painted as shown on the detail drawing.
The Contractor shall bolt the sign to posts and provide the required cross-bracing. The posts shall be set in gravel base and sign erected, as shown on the drawing. One (1) sign is required and is to be located at the location indicated on the Plans or as directed by the Inspector.
The sign shall be installed before any equipment or materials are brought to the site and shall remain in place until at minimum the NOT takes place. The Contractor shall repair or replace the sign as needed during construction.
Payment for the Work, which shall include installation of the project sign, shall be part of the lump-sum bid for "Mobilization and Demobilization".
Division II – Technical Specifications
1.0 Mobilization and Demobilization
1.1 Description
This Work shall consist of the performance of construction preparatory operations, including the movement of personnel and equipment to the project sites and for the establishment of the Contractor’s offices, buildings and other facilities including the construction of all temporary access roads as necessary to begin work on a substantial phase of the contract. The location of the Contractor’s office to be established must be approved by the State and any on-site Contractor’s office is to include space for the
Engineer/Inspector to use. It also shall include all demobilization activities involving the removal from the sites of all plant, equipment, supplies and personnel after completion of the work, including cleanup of all rubbish and waste materials generated during the construction of this project and restoration of any damage to existing site improvements resulting from the Contractor’s activities at the site. This item shall also include the installation of the project sign at the beginning of the project and the removal of the sign, prior to the Final Inspection. All equipment and material storage areas shall be approved by the State.
Upon receipt of a notice to proceed, the Contractor shall initiate and complete measures necessary to commence the Work. Mobilization shall also consist of delivering to the site and assembling in working order all necessary equipment, materials, and supplies to be furnished by the Contractor to complete the work.
Demobilization shall consist of the removal from the site of all the Contractor’s equipment and materials after completion of the work and cleanup of the site. Work shall be performed to the satisfaction of the State to be considered complete.
1.2 Method of Measurement and Basis of Payment
There shall be no measurement for the “Mobilization and Demobilization” item as it shall be lump sum. Said lump sum cannot be more than 5% of the TOTAL AMOUNT
BID for the project. Partial payments will be as follows:
One-half of the amount bid will be released to the Contractor with the first estimate payable, not less than 15 days after the start of Work at the project site.
The final one-half of the amount bid shall be released with the last estimate payable after the work is accepted by the State and after all Final Inspection submittals are received and approved by the State.
Nothing herein shall be construed to limit or preclude partial payments otherwise provided for by the contract. Neither deduction nor increase will be made in the lump sum “Mobilization and Demobilization” item amount regardless of decreases or increases in the final total contract amount or for any other cause.
1.3 Pay Item
Item 100.00, “Mobilization and Demobilization”, per lump sum cannot be more than
5% of the TOTAL AMOUNT BID for the project.
(Page intentionally left blank)
2.0 Construction Layout
2.1 Description
This item consists of furnishing, placing, and maintaining construction layout stakes, (based on the original baselines and/or control points in the plans), necessary for the proper performance of the work under this contract including borrow/waste areas.
Construction limits must be clearly flagged, and Pre-Construction cross sections must be provided and approved prior to any disturbance or “unclassified excavation”. It shall further consist of determining the exact units of measure for payment. It also consists of checking and making any field adjustment to the plan alignment, grades and elevations as considered necessary by the Engineer. Additionally, this item shall also include the preparation of “As-Built” Plans, including the Reclamation Plan and any others specifically requested by the State. All “As-Built” Plans shall be provided and approved prior to the Final Inspection Meeting.
This item also includes taking photographs (with a date / time stamp) and video (where the date and time are indicated) of the entire site – including the road and adjacent structures – before and after construction. Photos and video are to be provided to the
State for record, in particular to show that damage to adjacent structure(s) or road(s) did not occur during the course of the Project.
This item will be paid according to the following schedule: 35% confirmation of cross-sections, 35% for project stakeout throughout construction, and 30% on the acceptance of as-builts. This layout shall include location stakes and cut-fill lines marked on the stakes for each pre-manufactured or formed on site structures (manholes, drop inlets, headwalls, etc.). The layout shall also include centerline stakes with cut-fill lines for each channel and any areas of excavation and re-grade. The certified layout and cross-sections surveyed must be submitted to the State for approval prior to beginning construction for each item. Work shall be performed to the satisfaction of the State to be considered complete.
2.2 Materials
Conventional survey stakes, hubs, batter boards, flagging, templates, straightedges, and other devices necessary for laying out all parts of the work.
2.3 Construction Methods
The Contractor shall be responsible for the proper layout of the Work, including but not limited to: property boundaries, limits of disturbance, construction baselines, erosion and sediment controls, drainage structures, and/or feature identification for control of the work. Field markers must include the designated feature, appropriate stationing, and the cut/fill requirements to achieve final grade. The State will provide the Contractor with survey information regarding the baselines and the existing surface features shown on the Construction Drawings. The Contractor shall make all calculations involved and shall furnish and place all layout stakes. The Contractor is responsible for verifying all surveying, measurements, estimates, or any other information provided by the State for accuracy.
Project survey stakeout must be performed by a Surveyor with survey grade instruments that will provide real time sub-centimeter accuracy based on the project control provided in the Plans. Survey stakeout tolerances will be stated on plans; in absence of this, tolerances will be determined in the following way:
A survey plan will be submitted in writing or electronically to the Engineer. The submission will include a comprehensive list of survey personnel qualifications, the survey equipment to be used, and a detailed outline of the means, methods, and precision for tasks such as stakeout procedures, quantity measurements, volumetric confirmation, and as-built procedures. Approval of the plan is required prior to any work being performed.
The Contractor’s Surveyor shall provide field forces and shall set all additional stakes as needed, such as offset stakes, reference point stakes, slope stakes, grade stakes, stakes for drainage, or other structures, supplementary benchmarks, and any other horizontal or vertical controls necessary to secure a correct layout of the Work, including the re-establishment of the survey and construction baselines (as necessary), as shown on the Construction Drawings.
The Contractor’s Surveyor shall be responsible for assuring the layout staking work is in conformance to the lines, grades, elevations, dimensions, and locations shown on the
Construction Drawings, or as required by the Engineer. The Contractor shall furnish a copy of their survey records for review by the Engineer and for the State’s permanent file. These records shall be furnished as they are completed during the progress of the
Work.
Any inspection or review of the Surveyor's layout by the Engineer and the acceptance of all or any part of it shall not relieve the Contractor of their responsibility to secure the proper dimensions, grades, and elevations of the Work.
The Contractor’s Surveyor shall be responsible for locating all property corner monumentation within the LOD and provide coordinates to the Engineer for verification.
Upon verification, the Contractor shall remove and preserve disturbed monumentation, and reset original monuments to their location upon project completion. The Contractor shall exercise care in the preservation of stakes, monuments, and benchmarks, including existing property line markers, and shall have them reset at their expense if any are damaged, lost, displaced, or removed. The Contractor shall use competent personnel and suitable equipment for the layout work required and shall provide that it be done under the supervision of, or directed by, a Professional Surveyor registered in the State of West Virginia. As the survey is completed, the Professional Surveyor shall certify that the site layout is complete; this includes, at a minimum, all necessary grades
(both cut and fill), location and grades of all ditches, and all cross-sections related to cut and fill where grade lines are necessary for construction and or billing.
As-Built plans shall be provided to the Engineer for approval prior to the Final Invoicing.
All work completed by the Surveyor on the As-Builts must be certified by the Surveyor as to completeness and accuracy of the plan submittal. The As-Builts shall be provided in two forms of electronic format in PDF and AutoCAD 2020 or approved later version on either CD-ROM, DVD, or USB memory stick and one paper copy of the plans with the same size and scale as contained on the original plans.
The As-Builts shall include the following:
• Show all permanent Work in place installed both on the surface and subsurface, and any deviations from original plans.
• The preferred coordinate system and elevation datum by the Contractor need to be specified. The State has a preference for the US State Plane Coordinates of
1983 West Virginia South Zone – SPCS83 Zone 4702 in feet, unless otherwise specified.
• Show all horizontal and vertical dimensions (including invert elevations) of all installed components (i.e., pipes, drop inlets, mine seals, drainage channels, splash pads, manholes, etc.), as well as surveyed locations of the installed structures. Any other items deemed necessary (provided in the contract) by the
State shall be included in the As-Builts.
• Each cut-fill section shall have the area of that section labeled.
• Have the lines on the plans shown in either color or line type to distinguish between the original plan lines, the contractor’s original survey lines and the final grade lines. This will apply for all cross-sections on the project.
• All waste and borrow areas shall be shown and labeled.
• Revegetation that is paid for by acreage, shall be per plan view acreage and shall be shown on a separate AutoCAD layer. The enclosed areas shall not include any graveled surfaces, paved surfaces, roads, ponds, treatment components, all non-vegetated channels, buildings, etc. (non-vegetated areas are not to be included in the revegetation acreage calculation or AutoCAD layer).
• Any control points shall be shown with coordinates and elevations labeled. If the State has provided control points, the Contractor shall reference elevations and coordinates to them. If no control points were set, then new points shall be set and utilized.
• Any seep collectors, underdrains, or other structures inaccessible after covering, shall be surveyed for location, prior to covering.
• Show total quantities for all items on the project. The format shall be in a tabular form (i.e., Bid Schedule or Summary of Quantities).
• [Changes (deviations) should be on separate “Change” layer, not on the original layers from the original plan.]
ITEMS TO BE IDENTIFIED AND LABELED
ITEMS
☒ Baseline Survey after Clearing & Grubbing, if required
☒ Intermediate Surveys, if required
☒ Final Survey
☒ Revegetation
☒ Pipes, Valves, Manholes
☐ Mine Seals, Bat Gates
☒ Seep Collectors, Underdrains, Clean Outs
☒ Drainage Channels & Ditches, Splash Pads, Culverts, Drop Inlets
☒ Ponds, Wetlands, Water Treatment Structures
☐ Sludge Pumps, Sludge Cells, Geo-Tube Pads, Sludge Valves
☒ Buildings, Residential / Commercial Structures, Concrete Pads
☐ Pump Vaults, Air Release Valves, Pump Line Connections
☒ Fencing around Structures and Property Lines
☒ Utilities (i.e., Overhead / Underground Electric, Gas, Water, Sewer)
☒ Buried Lines (i.e., Electric, Communication, Chemical, Water, Sewer)
☐ Gas Vents, Piezometers, Monitoring Wells, Core Drilling
☒ Roads, Driveways, Sidewalks
☒ Unforeseen Areas (i.e., Slips, Seeps, Subsidence Areas, Boreholes)
☐ Other, As Defined:
2.4 Method of Measurement and Basis of Payment
There shall be no measurement of the “Construction Layout” item, as it is a lump sum.
Said lump sum bid cannot be more than 5% of the TOTAL AMOUNT BID for the project.
The lump sum payment shall include furnishing, setting, maintaining, and resetting the stakes when necessary, and for furnishing all personnel, equipment, materials, and all incidentals thereto. The lump sum payment also shall include the cost for providing the
Engineer pre- and post- construction ground line cross-sections for all disturbed or re-graded areas, including borrow/waste areas and “As-Built”. All these activities shall be included within the lump sum bid for “Construction Layout”.
Neither deduction nor increase will be made in the lump sum “Construction Layout” item amount regardless of decreases or increases in the final total contract amount or for any other cause. This item will be paid according to the following schedule: 35% confirmation of cross-sections, 35% for project stakeout throughout construction, and 30% on the acceptance of as-builts and photos / videos of pre-construction and post-construction conditions.
2.5 Pay Item
Item 200.00, “Construction Layout”, per lump sum cannot be more than 5% of the
TOTAL AMOUNT BID for the project.
3.0 Quality Control
3.1 Description
This Work shall consist of testing for verification that the materials supplied, and the work performed are in accordance with these Specifications. Work shall be performed to the satisfaction of the State to be considered complete.
3.2 Materials
The Contractor shall submit a minimum of two (2) copies of shop drawings, catalog cuts and material certifications (as applicable) to the Engineer for all offsite materials to be incorporated into the Work. At least 1 copy submitted must be electronic. Written approval from the Engineer will be required prior to incorporation of these items into the Work.
The Contractor shall submit a copy of the certifications of all technicians prior to any testing and at least two (2) copies of the results of all tests conducted on in-situ material, concrete, and grout to be used in this project. At least 1 copy must be electronic.
At a minimum, the pipe / fill compaction tests will include moisture content and density tests of the soil in accordance with the provisions of ASTM D698 (Standard Proctor) field density tests following compaction. A new Standard Proctor will be run when soil type changes occur on site and/or at the direction of the Engineer or State representative.
Soil tests shall determine the optimal additives required for areas of soil disturbance to be fully re-vegetated (see Section 6.0 of these Specifications). Normally, this includes – at a minimum – soil pH test results as well as available nutrients within the soil, including, at a minimum: nitrogen (N), phosphorus (P), potassium (K), calcium (Ca), magnesium (MG), and Sulfur (S). At a minimum, the soil testing report will recommend what soil amendments in which concentrations are ideal for regrowth. If problems with re-vegetation occur, additional, more specialized tests may be required to be performed at the Engineer’s discretion and the Contractor’s expense.
Limestone and Sandstone shall be subjected to a Sodium Sulfate test in accordance with
AASHTO T104. Limestone shall be tested for calcium carbonate equivalent. Stone shall have a maximum weighted loss of twelve (12) percent when subjected to five (5) cycles of the Sodium Sulfate Soundness Test – ASTM C88 (ASTM C88-05 Standard Test Method for Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate), as modified by AASHTO T-104. All stone shall be commercially supplied and shall be tested for calcium carbonate equivalency.
Limestone shall be commercially supplied and have a calcium carbonate equivalency of
70% or greater and be certified as such. The stone shall consist of particles of clean, hard, tough, durable rock, free from adherent coating. The State reserves the right to reject limestone based on a visual inspection without waiting on testing results.
Sandstone shall be certified to be non-acid producing. Sandstone to be sound, non-acid producing, durable, non-calcareous sandstone from a State approved source. Shale is not acceptable. The sandstone shall consist of particles of clean, hard, tough, durable rock, free from adherent coating. The State reserves the right to reject sandstone based on a visual inspection without waiting on testing results.
Note that the WVDOH Standard Specs and the MM-109 (if applicable) specify quality control and testing procedures that ARE REQUIRED for any applicable asphalt replacement repaving, shoulder stone, guardrail replacement, etc. The Contractor is to ensure these are implemented, that materials and installations permanently installed meet or exceed all required tests, and the Contractor shall provide the results to the State and the
WVDOH for record.
For ease of reference, the WVDOH Standard Specs can be found at the below:
https://transportation.wv.gov/highways/TechnicalSupport/specifications/Documents/2023
_Standard_%2812-16-22%29.pdf
Tests Required
Concrete Tests for Compressive Strength, Slump Test, Air Content, Temperature
Every 50 CY or at least once per day
(whichever is greater)
Grout Tests for Compressive Strength and Slump Test
Every 50 CY or at least once per day
(whichever is greater)
CLSM Tests for Compressive Strength, pH testing (if under a roadway)
Every 100 CY or at least once per day
(whichever is greater)
Pipe
Compaction
Testing for Backfill Material
Density
Per Engineer; 1 Lot of
5 tests per day (min)
Fill
Compaction
Testing for Backfill Material
Density
1 Lot of 5 tests per day (min)
Soil Test Varies As Needed
Material
Certification
Manufacturer Certification for all purchased materials
On or Before Delivery
Limestone Sodium Sulfate test, calcium carbonate equivalent
On or Before Delivery
Sandstone Certification that rock is non-acid producing and sodium sulfate test
On or Before Delivery
3.3 Construction Methods
The Contractor shall select an independent testing laboratory for testing. The laboratory shall be under the direct supervision of a Registered Professional Engineer or PhD. The laboratory must be approved by the State, prior to testing.
The Contractor shall furnish a certified technician to perform the required testing at the project site. The certified technician shall submit a copy of their certification, and a copy https://transportation.wv.gov/highways/TechnicalSupport/specifications/Documents/2023_Standard_%2812-16-22%29.pdf https://transportation.wv.gov/highways/TechnicalSupport/specifications/Documents/2023_Standard_%2812-16-22%29.pdf of that certification shall be submitted to State at the Pre-Construction Conference. The certified technician shall be responsible for chain of custody of any samples that leave the site.
Testing shall be performed as required by these Specifications and/or as ordered by the
Engineer or State representative in writing. The Engineer will determine the locations and time of any testing herein specified and the need and extent of any testing in addition to that which is herein specified.
The Contractor shall be responsible for performing laboratory tests of the coal, mine spoil, and any natural soil to identify the compaction requirements for their use as fill and cover material, respectively. In addition, field density tests shall be performed in accordance with these Specifications. All test results shall be submitted to the Engineer for approval of compaction criteria prior to finalizing compacting the fill material and after fill material is placed to verify that the required compaction is obtained.
Only new and first-class materials, which conform to the requirements of these Specifications, shall be used unless specified otherwise. When requested by the State, the Contractor shall furnish a written statement of the origin, composition, and manufacturer of any or all materials
(manufactured or produced) that are to be used in the work. The sources of supply of each material used shall be approved by the Engineer before delivery is started. If, at any time, sources previously approved fail to produce materials acceptable to the State, the
Contractor shall furnish materials from other approved sources.
3.4 Method of Measurement and Basis of Payment
There shall be no measurement of the “Quality Control” item as it is a lump sum. The quality control work done will be paid at the contract lump sum price bid for this item.
Said lump sum bid cannot be more than 3% of the TOTAL AMOUNT BID for the project.
Nothing herein shall be construed to limit or preclude partial payments on this item up to
100% of the quality control bid amount. Neither deduction nor increase will be made in the lump sum “Quality Control” item amount regardless of decreases or increases in the final total contract amount or for any other cause.
3.5 Pay Item
Item 300.00, “Quality Control”, per lump sum cannot be more than 3% of the TOTAL
AMOUNT BID for the project.
(Page intentionally left blank)
4.0 Site Preparation
4.1 Description
Clearing and Grubbing - Work performed under this section shall include the removal and disposal of all trees, stumps, shrubs, and any other vegetation along with wood, debris, or garbage of any nature. This includes those areas specified below, shown on the Plans, and any other areas as approved by the State. This work shall also include the preservation from damage for all vegetation, utilities, or any other object not being specifically removed according to the Specifications and Plans.