Addendum 6 ITB PR-24-399.pdf

PDF 137 KB Posted

Attached to
Pump Equipment, Maintenance, and Repairs
Solicitation number
PR-24-399
Issued by
California

About this file

This is Addendum No. 6 to an Invitation to Bid (ITB No. PR-24-399) issued by the City of Long Beach, Department of Financial Management, for pump equipment, maintenance, and repairs services. The addendum clarifies and expands the scope of work to include maintenance, repairs, and programming of Variable Frequency Drives (VFDs) and other associated system parts connected to pumps across all city parks, lakes, and irrigation systems. The contract will be on-call in nature rather than following a predetermined maintenance schedule. Two new line items have been added: Line Item 17 for maintenance and repair of miscellaneous or unlisted pumps and system parts quoted as an hourly rate, and Line Item 18 for replacement units of pumps not listed, quoted as a discount percentage from list price. Specific horsepower ratings have been provided for Grundfos pump bid items (7.5 HP, 10 HP, and 15 HP models), and suction/discharge specifications for the Pentair 364A SF pump (8x10x15) have been clarified.

The addendum addresses contractor responsibilities regarding replacement parts and upgrades, requiring contractors to notify the City representative if specified parts are unavailable and to provide quotes for alternative or replacement options. The City has emphasized that contractors must have the means to machine parts as stated in the original ITB scope. Equipment upgrades are included in the contract scope. All communication regarding the bidding process must occur through official channels and be confirmed in writing by the City Contact. Proposers are required to acknowledge receipt of this addendum by signing and submitting it with their proposals; failure to do so may result in disqualification. The addendum was prepared by Anthony Delgado, Assistant Administrative Analyst II, on August 20, 2024.

View the file

Other files

File Type Posted
ITB Attachments~24.pdf PDF
Addendum 1 ITB PR-24-399.pdf PDF
Addendum 7 ITB PR-24-399.pdf PDF
Addendum 3 ITB PR-24-399 Final.pdf PDF
Bid Recap PR-24-399 Final.pdf PDF
ITB PR-24-399 Final.pdf PDF
Addendum 4 ITB PR-24-399.pdf PDF
Addendum 2 ITB PR-24-399.pdf PDF
Attachment G Local Prefernce~1.pdf PDF
Notice of Intent PR-24-399.pdf PDF
Addendum 5 ITB PR-24-399~1.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Financial Management 411 West Ocean Boulevard, 6th Floor

Long Beach, CA 90802

(562) 570-6425

August 20, 2024

NOTICE TO PROPOSERS

ADDENDUM NO. 6

ITB No. PR-24-399 Pump Equipment, Maintenance, and Repairs

This addendum changes and supersedes the language in the original ITB. Please acknowledge receipt of this addendum by signing and submitting with your proposal. Any proposer who fails to submit this addendum may be disqualified.

The City would like to remind Proposers that pursuant to Section 5.2.25 of the RFP, the City will not be responsible for or bound by any oral communication or any other information or contact that occurs outside the official communication process specified herein, unless confirmed in writing by the City Contact.

The City would like to provide the following clarifications:

• Addition to the Scope of Work: Contractor to provide maintenance, repairs, and programming of VFDs and other associated system parts connected to the pumps.

• Regarding replacement parts and upgrades: The scope of the ITB states that contractor should have the means to machine parts. Contractor should notify the City representative if parts are not available and provide a quote for alternative parts or replacement options.

The City would like to provide the following changes:

• Add Line Item 17 – Pump maintenance and repair for other miscellaneous / unlisted pumps and system parts – quoted as an hourly rate.

• Add Line Item 18 – Replacement units for pumps not listed – quoted as discount percentage from list price.

The Questions and Answers are as follows:

1. Q: Regarding pump maintenance: What exactly are we quoting? Are you looking for an hourly rate?

A: Hourly rate.

Addendum No. 6 ITB PR-24-399

2. Q: Regarding the Grundfos pump (bid item numbers 2, 3, 4, and 5): To provide a complete unit quote for the pump & motor we need a horsepower (HP) rating for each item.

A: 2- MID7.5NOG00008SFF3-CR20-3-3X480 7.5HP

3- M1DO10NOG00008SFF3-CR20-4-3X480 10HP

4- M1D015N0G00008SFF3-CR32-4-2-3X480 15HP

5- M1D015N0G00008SFF3-CR32-4-2-3X480 15HP

3. Q: Regarding the Pentair 364A SF: There wasn’t a pump tag. Is there a way to get more information on the suction and discharger size? It appears to be 10” x 8”.

A: 8x10x15

4. Q: Will this contract cover all parks, lakes, and irrigation pumps across the City?

A: Yes.

5. Q: There was no line item for cost of maintenance, repair, or replacement of pumps that weren’t included on the bid list. How can we provide an estimated cost for these items?

A: Line items have been added in Long Beach Buys. See clarification and changes above.

6. Q: Will this contract also cover equipment upgrades?

A: Yes.

7. Q: Does this include VFDs, flow switches, and/or other associated equipment connected to various pump types?

A: Yes. Please see clarification above.

8. Q: What is the City expecting in terms of maintenance timeline or routines?

Will this be purely on call, or are you looking for monthly, quarterly, or some other maintenance schedule?

A: On call.

Addendum No. 6 ITB PR-24-399

PREPARED BY: Anthony Delgado, Assistant Administrative Analyst II

ACKNOWLEDGED BY: ________________________________________________

Company Name

Print Name Title

Signature Date

File details come from the government source that posted it. Updated .