Attached to
751/22340. AGY; Fort Mackinac Soldiers Barracks Roof Project
Solicitation number
RFQ - 171 - 230000000102
Issued by
Mackinac County, Mackinac Island City, Michigan

About this file

This document is Addendum 4 to the Construction Bid for the Fort Mackinac Soldier's Barracks Roof project, issued by the Department of Technology, Management and Budget (DTMB) State Facilities Administration Design and Construction Division on behalf of the state of Michigan. The addendum clarifies that a 5% bid security is required for all bids, contrary to the information provided in the project advertisement. The bid opening date is January 18, 2023.

The project is located in Mackinac County and Mackinac Island City, Michigan. Bidders are instructed to submit all questions via email to the Project Director, Myron Johnson, and to upload bid attachments to the SIGMA VSS system. Emailed submissions may be accepted on a case-by-case basis, with prior approval from the Office of Design and Construction. Bidders experiencing SIGMA VSS issues are advised to contact the SIGMA Help Desk and include their ticket number in an email to the contract specialists.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 (Rev 10/22)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND

BUDGET

State Facilities Administration Design and Construction Division

CONSTRUCTION BID ADDENDUM NO. 4

This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL BIDDERS

DATE ISSUED

1/11/2023

PROJECT NAME

Fort Mackinac Soldier’s Barracks Roof

FILE NUMBER

751/22340.AGY

PROFESSIONAL

Myron Johnson

PROJECT DIRECTOR

Myron Johnson

BID OPENING DATE:

1/18/2023

ADDENDUM ITEMS: (attach additional sheets and drawings if required)

Question: “Could you let us know if a 5% bid security is required on the subject project? On the project advertisement it says it is not, but on the prebid meeting agenda item 6 Forms to be submitted) “c” lists Bid Security in the amount of 5% of Base Bid Price.

Answer: All bidders to be advised of error on advertisement stating no bid security is required. Bidders to be guided solely by bid documents as follows:

“BID GUARANTEE REQUIRED: A FIVE (5) PERCENT BID SECURITY IS REQUIRED FOR ALL BIDS. BUILDERS RISK

INSURANCE IS REQUIRED TO BE PROVIDED BY THE CONTRACTOR UNLESS OTHERWISE INDICATED IN THE BID

DOCUMENTS A PERFORMANCE BOND AND A PAYMENT BOND IS REQUIRED ON ALL BIDS OVER $50,000.00.”

ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.

PROFESSIONAL: DATE: Click to enter date

APPROVED BY: Myron Johnson

DATE: 1/11/2023

http://www.michigan.gov/SIGMAVSS

PROJECT DIRECTOR:

File details come from the government source that posted it. Updated .