Addendum No. 3 to RFQ2026015 - Continuing Professional Engineering Services

This is Addendum No. 3 issued by the City of Kissimmee, Florida on September 10, 2026, providing clarifications and revisions to Request for Qualifications (RFQ) 2026015 for Continuing Professional Engineering Services. The addendum addresses 13 substantive questions from proposing firms regarding scope of services, submission requirements, and evaluation criteria. Key clarifications include confirmation that coastal engineering services are not required due to the City's inland location; that firms may submit qualifications for specific engineering disciplines but should not submit proposals limited solely to geotechnical engineering; that the maximum number of professional references is three, contrary to earlier wording suggesting a minimum; that proposals must remain unbound and may only be stapled or clipped; and that double-sided printing counts each side as one page toward page limits. Additionally, the addendum specifies that professional licenses, certifications, and resumes for key personnel may be included in separate appendices and will not count toward proposal page limits, and that electronic submissions are only accepted as one of three required copies (along with one original and one hard copy) on a flash drive. Proposals are due September 28, 2026, and selection does not guarantee minimum work, compensation, or exclusivity. All proposers must acknowledge receipt of this addendum in their submission.

The addendum provides clarification on scope interpretation, particularly regarding grant application and funding support services, which may include identifying grant opportunities, preparing applications, assisting with execution and administration, managing requirements, and supporting reimbursement requests. Firms may partner with qualified subconsultants to provide services in designated disciplines. The City reserves the right to make discipline-specific award selections based on project needs, qualifications, and demonstrated expertise. The acknowledgment section requires proposers to sign and return confirmation of receipt with their proposals, and all other terms and conditions of the original RFQ remain unchanged.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

September 10, 2026

Addendum No. 3

Project: Continuing Professional Engineering Services Bid No: RFQ2026015

TO ALL PROPOSERS:

The following items are clarifications, corrections, additions, deletions and / or revisions, which shall take precedence over the original documents.

1. 3.1 Scope of Services under: “Environmental and resiliency engineering services, including wetlands, coastal, and regulatory compliance support”. Since the city of Kissimmee is not on a coast, will you still need coastal services?

Answer: No. The City does not anticipate a need for coastal engineering services as part of this continuing services contract.

2. Page 10, #8 of the RFQ states “References (10 Points | Max 3 “Forms”; does the City have a reference form or can we provide the references within our document?

Answer: The City does not have a separate reference form for this requirement. Firms may provide the requested references within their proposal, provided the information includes the required reference details. The maximum is three (3) reference forms/entries as specified in the RFQ.

3. Sections 3.1 and 3.5 reference multiple engineering disciplines and provide page limits per designated discipline. Please confirm whether firms may submit qualifications for specific disciplines, such as geotechnical engineering or environmental engineering and permitting, and if so, whether the City intends to make discipline-specific award selections.

Answer: Yes. Firms may submit qualifications for the specific engineering disciplines identified in Sections 3.1 and 3.5. However, firms should clearly identify the disciplines and services for which they are submitting qualifications and demonstrate their ability to provide the requested services, either directly or through qualified subconsultants. The City may select firms based on the specific services and qualifications needed. However, submission of qualifications for a particular discipline does not guarantee a discipline-specific award or task order.

4. So, it is correct that we should not submit a proposal for just the Geotechnical Engineering category? We are a Geotechnical Engineering firm, but the addendum indicates that we should not submit a response package if we are only submitting for Geotechnical Engineering (i.e. “Geotechnical engineering services, including subsurface investigations and foundation recommendations”). Is this correct? We just wanted to provide specifics and be absolutely certain of the City’s intentions

Answer: Correct. Firms should not submit a response package if they are proposing to provide only geotechnical engineering services. The intent of the RFQ is to establish continuing services with firms capable of providing a broader range of engineering services.

Geotechnical services may be included as part of a firm's overall qualifications and service offerings, either directly or through a subconsultant, but geotechnical engineering as the sole proposed service is not intended to be a standalone response category.

5. Section 3.4 (Bullet 3) states that binders are not permitted. Please confirm whether proposals may be submitted in a bound format (such as spiral or other binding methods), or if submissions should remain unbound and only stapled/clipped.

Answer: Proposals should be submitted unbound in accordance with Section 3.4. Binders, including spiral-bound or similar binding methods, are not permitted. Proposals may be stapled or clipped to keep the pages together.

6. In the RFP, Section 8. References, it states a maximum of three forms (this was clarified in an addendum) but says to provide a minimum of three professional references. In Addendum No. 2, the answers to questions 5 and 17 again references a maximum of three references. Can you please clarify if it is a minimum of three references or a maximum of three references?

Answer: The requirement is a maximum of three professional references. Respondents should provide no more than three professional references, notwithstanding the wording indicating a minimum of three.

7. The RFP instructions state that double sided printing is permitted. Please confirm that each side of the paper counts as one page.

Answer: Yes. Each side of a sheet of paper will count as one page for purposes of the proposal page-count requirements.

8. For Section 3.1 Sope of Services- We are requesting clarification for the requirements of the discipline for "Grant Application and Funding Support (when applicable) ".

Answer: Most of the City's projects are funded through various City funding sources.

However, there may be instances where additional funding is needed through available grant opportunities. Grant application and funding support may include identifying applicable grant opportunities, preparing and submitting grant applications, assisting with grant execution and administration, managing grant requirements, and supporting reimbursement requests and related documentation.

9. Professional Licenses and Certifications:

• Regarding Addendum No. 1, Question 11, may copies of professional licenses and certifications be included in a separate appendix or section of the proposal?

• Additionally, for Section 3 (Project Manager Qualifications), is the same supporting documentation required for the proposed Project Managers? If copies of licenses and certifications are included, will those documents be excluded from the page count?

Answer: Copies of professional licenses and certifications may be included in a separate appendix or section of the proposal. For proposed Project Managers, respondents should provide information regarding applicable licenses and certifications as requested in Section

3. Copies of licenses and certifications included as supporting documentation will not count toward the proposal page limit.

10. Resumes and Page Count:

As a follow-up to Question 11, the response did not address resumes.

Does the City of Kissimmee require resumes for key personnel? If so, should resumes be included in the proposal, and will they be excluded from the page count?

Answer: Yes. Respondents should include resumes for proposed Project Managers and other key personnel identified in the proposal. Resumes may be included as a separate section or appendix and will not count toward the proposal page limit.

11. Electronic Submittals:

To clarify, will the City of Kissimmee accept electronic proposal submittals in lieu of, or in addition to, hard-copy submissions?

Answer: No, the RFQ packet states the following “All qualifications must be submitted in a SEALED envelope and plainly marked with the qualification number on the exterior of the qualification envelope, one (1) original, one (1) copies and one (1) electronic copy on Flash drive.”

12. Personnel Availability and Commitment

Several sections appear to request similar information regarding staff availability and commitment to City projects, including:

· Section 3: Project Manager Qualifications

· Section 4: Project Team Qualifications

· Section 6: Proposed Approach and Availability Sections 3 and 4 appear to address the qualifications and availability of key personnel. For Section 6, is the City seeking any additional information regarding availability, scheduling capacity, or resource commitment that has not already been addressed in Sections 3 and 4?

Or may respondents reference information previously provided to avoid duplicating content?

Answer: Section 6 is intended to address the firm's overall availability, capacity, and ability to provide the necessary resources to support the City's projects throughout the contract term.

Respondents may reference information provided in Sections 3 and 4 where appropriate;

however, the response to Section 6 should clearly address the firm's overall resource capacity and commitment to providing services to the City.

13.Related to Section 3.5 RFQ Organization; Sub-section 9 – Required Forms. Are the required forms and required support documents required for all consultants’ firms on the proposal team or only the prime consultant?

Answer: Required forms identified in Section 3.5, Sub-section 9, are required from the prime consultant unless specifically stated otherwise in the RFQ or applicable form. Supporting documentation required for individual subconsultants or team members should be provided as required by the RFQ and should clearly identify the applicable firm or individual.

A. ACKNOWLEDGMENT OF ADDENDA:

1. The proposer shall acknowledge receipt of this addendum by completing the applicable section in the RFQ. The Proposer shall submit said Form with the proposal.

2. All other terms and conditions of the RFQ remain unchanged.

Brandon Durango Procurement Manager

ACKNOWLEDGMENT OF ADDENDA NO.(S) _________ (IF APPLICABLE)

(Signature)

COMPANY NAME _______________________________________

COMPANY ADDRESS _______________________________________

BY: _________________________ DATE:________________________

(signature)

_____________________________ EMAIL:_______________________

(typed name/title of signer)

File details come from the government source that posted it. Updated .